Transcript of PPP FINAL PROJECT - COURSERA COURSE

THE NEED FOR AN EFFICIENT GARBAGE COLLECTION SYSTEM FOR

TAGBILARAN CITY, BOHOL, PHILIPPINES thru the PRIVATE

PUBLIC PARTNERSHIP PROGRAM

By: Atty. Marissa P. Anino

OPEN DUMPSITE ordered for closure for it is a violation of a Philippine

Environmental Law

THE PRESENT GARBAGE SITUATION in Tagbilaran City

LIMITED NUMBER OF GARBAGE TRUCKS

LOCAL ADMINISTRATION OCCUPIED BY REHABILITATION PROJECTS DUE TO THE 2013 7.2Magnitude Earthquake

NEED TO IMMEDIATELY SOLVE THE GARBAGE PROBLEM

• To comply with the requirements of the Philippine Environmental Law (RA 9003)

• To save the city from an impending enviromental disaster

• The city is the gateway to the Province of Bohol, a prime tourist destination, which needs to be clean and green to support the tourism industry of the Province.

BOHOL as a Major Tourism Destination

Needs to start with an entry to a clean Tagbilaran City

LOCAL GOVERNMENT EXECUTIVES

• COMMITTED TO SOLVE THE PRESENT GARBAGE PROBLEM

• BUT NOT SO KEEN ON OBTAINING A LOAN• HENCE, AN EFFICIENT GARBAGE COLLECTION

SYSTEM TO BE CONSTRUCTED, OPERATED AND MANAGED BY THE PRIVATE SECTOR CAN SOLVE THIS PRESENT PROBLEM

THE PPP PROJECTS

SANITARY LANDFILL CONSTRUCTION

MATERIAL RECOVERY FACILITY

EFFICIENT GARBAGE COLLECTION

ACTIVITIES TO BE DONE by the CITY GOVERNMENT

1. Create a PPP Department in their organization to take charge of the project and other future projects

2. Commission the conduct of a feasibility study for the proposed PPP project to enable them to develop a sound Business Plan and Technical Specifications, design a sound regulatory scheme and PPP contract

3. Offer the project for public bidding to select the right PPP partner

ACTIVITIES TO BE DONE by the CITY GOVERNMENT

4. Establish program management5. Communicate with the public early and often6. Ensure necessary skills are obtained by both parties.7. Track the performance of the project

WHAT MUST BE DONE TO ENSURE SUCCESS OF THE PPP PROJECT

1. Ensure sound economic fundamentals.2. Structure a partnership that optimize cost, quality and investor

return3. Secure political champions4. Build stakeholder support5. Assess and manage social & environmental impacts6. Foster a stable and supportive regulatory environment7. Use a disciplined approach8. Secure a mix of global and local expertise9. Support and transparent competitive bid process10. Plan for ongoing contract monitoring and review.

SUGGESTED PPP SCHEME

1. The project should be Build-Operate Scheme

2. Considering there is no transfer of ownership, the private partner must pay royalties to the city government.

BENEFITS OF THE PPP PROJECT

1. The government will be able to solve the garbage problem without having to spend money on the project considering the private sector will build the infrastructure.

2. The government will earn royalty fees from the project.

3. THIS DEFINITELY WILL BE A WIN-WIN SITUATION

ONWARDS TO A GARBAGE FREE CITY