Avoiding disasters/impacts

Managing residual risk/impacts

Illustration on the Philippines

This figure shows the distribution of consumption in the region II – Cagayan Valley. The large majority of families in the region consume between 10,000 and 30,000 pesos per year.

The same distribution, but after the 100-year typhoon hit the region

In the case of the 100-year typhoon, around 176,000 people fall in poverty, and 230,000 even fall below the subsistence line.

Stress testing all regions for all hazards, we find

that about half a million Filipinos face transient consumption poverty

every year due to their exposure to disasters.

the regions identified as priorities for risk-management interventions differ depending on which risk metric is used. Each metric translates in quantitative form a different set of policy objectives.

The potential from (and cost of) adaptive social protection in Sri Lanka

Recommendations Solutions Diagnosis

The lack of resilient infrastructure is harming people and firms

Recommendations Solutions Diagnosis

Damages and repair costs are significant …

$30 billion Annual global damages to transport and power generation

$18 billion Annual damages to low- and middle-income countries

… but repairs are only part of the problem.

Firms Reduced utilization rate ($151 billion) Lost sales ($82 billion) Self-generation costs ($65 billion) Increased inventories More expensive localization choices Higher barriers for entry of new firms Less competition and innovation Labor-biased technologies

Household Willingness-to-pay ($90–$343 billion) Health expenditures ($3–$6 billion) Income impact and gender implications

$391–$647 billion The annual cost of infrastructure disruptions on households and firms in developing countries.

What fraction is caused by natural hazards? Zoom on Tanzania.

$640 million Or 1.8 percent of GDP

$250 million Or 0.7 percent of GDP

Total utilization losses per year: Weather-related losses per year:

46.2% Losses due to

disruptions caused by rains & floods

47% Losses due to

disruptions caused by rains & floods

Power Transport

Recommendations Solutions Diagnosis

Investing in more resilient infrastructure is sound, profitable, and urgent

Criticality analyses show where strengthening is more important and beneficial

With the right data, strengthening assets would cost $11–$65 billion per year—3 percent of total needs

Investigating the uncertainty on benefits using 3000 scenarios

Altogether: Investing in resilience is sound, profitable, and urgent

$4 In net benefit for each $1 invested in infrastructure resilience

Net benefit from building new infrastructure to higher resilience standards

$4.2 trillion Cost of delaying action by one year

$100 billion

Recommendations Solutions Diagnosis

Good infrastructure management is the necessary basis for resilient infrastructure—but targeted actions are also needed.

Spending more improves the reliability of transportation systems …

… but only if governance improves as well

If governance improves with spending If governance does not improve

Priority areas for financial support—how can we spend better?

F U L L I N F R A S T R U C T U R E C O S T S

C O S T T O R E G U L A T O R S A N D G O V E R N M E N T

L I F E C Y C L E C O S T T O ( P U B L I C O R P R I V A T E ) I N F R A S T R U C T U R E S E R V I C E P R O V I D E R S

Project design and preparation

Upfront investment cost

Operational costs

Maintenance and repair costs (and

decommissioning)

Master planning, regulation design, and enforcement

Data and model development, research,

training, education

Priority areas for financial support—how can we spend better?

F U L L I N F R A S T R U C T U R E C O S T S

C O S T T O R E G U L A T O R S A N D G O V E R N M E N T

Master planning, regulation design, and enforcement

Data and model development, research,

training, education

L I F E C Y C L E C O S T T O ( P U B L I C O R P R I V A T E ) I N F R A S T R U C T U R E S E R V I C E P R O V I D E R S

Project design and preparation

Upfront investment cost

Operational costs

Maintenance and repair costs (and

decommissioning)

For instance, $1 invested in maintenance is worth $1.5 in new investment

Team members • The report has been prepared by a team led by Stephane Hallegatte, with Jun Rentschler and Julie Rozenberg. • Power sector: Claire Nicolas, with a team composed of Christopher Arderne, Diana Cubas, Mark Deinert, Eriko

Ichikawa, Elco Koks, Ji Li, Samuel Oguah, Albertine Potter van Loon, and Amy Schweikert. • Water sector: Zhimin Mao, working with Laura Bonzanigo, Xi Hu, Elco Koks, Weeho Lim, Raghav Pant, Patrick

Ray, Clementine Stip, Jacob Tracy, and Conrad Zorn. • Transport sector: Julie Rozenberg, with Xavier Espinet Alegre, Charles Fox, Stuart Fraser, Jim Hall, Elco Koks,

Mercedeh Tariverdi, Michalis Vousdoukas, Conrad Zorn. • Telecommunication sector: Himmat Sandhu and Siddhartha Raja. • Firm and household surveys: Jun Rentschler, with Paolo Avner, Johannes Braese, Alvina Erman, Nick Jones,

Martin Kornejew, Sadick Nassoro, Marguerite Obolensky, Samet Sahin, and Eugene Tan. • Resilient industries and supply chains: Shinji Ayuha, Célian Colon, Etienne Raffi Kechichian, Maryia Markhvida,

Nah Yoon Shin, Shoko Takemoto and Brian Walsh. • Public-private partnerships: Sanae Sasamori and Naho Shibuya • Engineering solutions and cost estimates: Miyamoto International • External advisors: Yasuyuki Todo, Adam Rose, Guillaume Prudent-Richard

• Sponsored by the Japan—World Bank Program for Mainstreaming Disaster Risk Management in

Developing Countries and the Global Facility for Disaster Reduction and Recovery (GFDRR).