PowerPoint® PresentationPowerPoint® Presentation

Chapter 8Chapter 8Boiler Operation ProceduresBoiler Operation Procedures

Taking Over a Shift • First-Time Boiler Start-up Procedures • Routine Boiler

Start-up Procedures • Boiler Maintenance Procedures • Boiler Shutdown

Procedures • Boiler Inspection • Hydrostatic Test • Boiler Troubleshooting

Taking Over a Shift • First-Time Boiler Start-up Procedures • Routine Boiler

Start-up Procedures • Boiler Maintenance Procedures • Boiler Shutdown

Procedures • Boiler Inspection • Hydrostatic Test • Boiler Troubleshooting

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

Boiler operation information is communicated to the boiler operator starting the shift to specify any special procedures required.

Boiler operation information is communicated to the boiler operator starting the shift to specify any special procedures required.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

When blowing down the gauge glass, water should enter the gauge glass quickly when the gauge glass blowdown valve is closed.

When blowing down the gauge glass, water should enter the gauge glass quickly when the gauge glass blowdown valve is closed.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

During a bottom blowdown, the boiler should be under light load and the water level should be at the NOWL.

During a bottom blowdown, the boiler should be under light load and the water level should be at the NOWL.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

The blowdown valve is opened to evacuate the low water fuel cutoff chamber with the burner firing during blowdown.

The blowdown valve is opened to evacuate the low water fuel cutoff chamber with the burner firing during blowdown.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

When testing the flame scanner, the flame scanner sensor is covered to simulate a flame failure.

When testing the flame scanner, the flame scanner sensor is covered to simulate a flame failure.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

Before starting the boiler for the first time, the boiler should have a minimum water level of approximately 2″ above the bottom of the gauge glass.

Before starting the boiler for the first time, the boiler should have a minimum water level of approximately 2″ above the bottom of the gauge glass.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

The burner is started in low fire according to procedures specified by the manufacturer.

The burner is started in low fire according to procedures specified by the manufacturer.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

The boiler vent is closed when pressure in the boiler reaches 10 psi to 15 psi.

The boiler vent is closed when pressure in the boiler reaches 10 psi to 15 psi.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

The main steam stop valve is opened slowly to allow the pressure to equalize when the boiler is a few pounds below the header pressure.

The main steam stop valve is opened slowly to allow the pressure to equalize when the boiler is a few pounds below the header pressure.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

A broken or discolored gauge glass is replaced using standard procedures for maximum safety.

A broken or discolored gauge glass is replaced using standard procedures for maximum safety.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

The low water fuel cutoff controls must be installed vertically for proper performance.

The low water fuel cutoff controls must be installed vertically for proper performance.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

The burner is maintained and tested to ensure proper operation and maximum efficiency.The burner is maintained and tested to ensure proper operation and maximum efficiency.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

Feedwater pumps should be checked periodically to ensure proper bearing temperatures and checked for any unusual vibration.

Feedwater pumps should be checked periodically to ensure proper bearing temperatures and checked for any unusual vibration.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

Safety valves are routinely tested to ensure proper operation and must be serviced by an authorized manufacturer representative.

Safety valves are routinely tested to ensure proper operation and must be serviced by an authorized manufacturer representative.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

Steam traps are checked for proper operation when determining the cause of a steambound feedwater pump.

Steam traps are checked for proper operation when determining the cause of a steambound feedwater pump.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

When inspecting a boiler, inspect tube sheets, tubes, and other internal parts for corrosion, overheating, and/or other damage.

When inspecting a boiler, inspect tube sheets, tubes, and other internal parts for corrosion, overheating, and/or other damage.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

Handhole covers are removed to provide access to boiler parts during a boiler inspection.

Handhole covers are removed to provide access to boiler parts during a boiler inspection.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

All internal surfaces are exposed and cleaned prior to the boiler inspection.

All internal surfaces are exposed and cleaned prior to the boiler inspection.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

Troubleshooting steps from the manufacturer provide a guide to correcting a boiler operation problem.

Troubleshooting steps from the manufacturer provide a guide to correcting a boiler operation problem.

Chapter 8 — Boiler Operation ProceduresChapter 8 — Boiler Operation Procedures

The boiler room log lists boiler operation data that can be used to increase boiler efficiency and identify a potential malfunction.