Post on 24-Mar-2016
description
Ing.arch. Josef POSPISIL
forename: Josefsurname: Pospisil
home address: Ing.arch Josef Pospisil Pametice Czech Republic
home Contact: Tel. + Email: pepepospisil@gmail.com
// Born in Boskovice, Czech Republic
Education: / Secondary Technical School of Buildings and Constructions Kudelova Brno Field of study: Building and Structural Construction
/ Faculty of Civil engineering (University of technology in Brno, Czech Republic) Brno
Field of study: Building and Structural Construction
Web site: http://www.fce.vutbr.cz/
/ Faculty of Architecture (University of technology in Brno, Czech Republic) Brno
Field of study: Architecture and Urbanism (Student No. )
Web site: http://fa.vutbr.cz/
/ University of Bolton (University of Manchester), UK Field of study: Architectural Technology (Student No. /)
Web site: http://www.bolton.ac.uk/BEE/Home.aspx
/ Private hours of fine arts by Ing.arch. Jir Hlouek
Computer skills:
AutoCAD - advanced ( years experience)
ArchiCAD - professional ( years experience)
Artlantis Studio - professional ( years experience)
Adobe Photoshop - highly advanced ( years experience), licensed
Adobe Ilustrator - advanced ( years experience), licensed
RhinocerosD advanced ( years experience), licensed
Cinema D - advanced ( years experience), licensed
Octane render - advanced ( years experience), license
prep D models for D printer or milling-cutter
Language skills:
English language - intermediate
Slovak language - fluent
Czech language - native language
Spanish language - basic
Work Experiences / Design project of Family house for planning permission and construction works, main architect: Ing.arch. Jiri Hlousek contact: +, investor: Mr Toman, contact: +,
building place: Kretin, Czech republic, site: /.
Job in design studio of Ing. arch. Lubo Frantik, Ph.D., contact: + , frantisak@fa.vutbr.cz
- participation on landscape project of forest park Job in design studio Atelier Habina, main architect: Ing. arch. Martin Habina, contact:
+, atelier@habina.cz, web site: http://www.habina.cz
- participation on project of block of flats and family house / Job in design studio A.P.E. design s.r.o, main architect: Ing. arch. Davdek Petr, contact: + , davidek@arch.cz , web site: http://www.arch.cz/davidek
- design of blocks of flats inside old part of city Brno (Czech republic), approximate value of
the project: ,mil. ,
- design of family houses in outskirt of city Brno (Czech republic), approximate value of
the project: ,mil.
- design of extension of family house in city Brno-Zabovresky, approximate value of the
project:
- design of composition of family houses in outskirt of city Brno, approximate value of the
project:
Job in design studio Swanke Hayden Connell Architects in London. Work on financial center Beltone Financial HQ CIRO and skyscraper of capital city Astana
web site: http://www.shca.com/
/ Production of visualization for spanish atelier Kubiko (centre in Madrid) including blocks of flats, industrial buildings, schools, art centres etc. Next cooperation about design and establishment
working group for Kubiko studio.
Competitions Design of FUNERAL HOUSE in Roudnice nad Labem (Czech republic), th position from projects
Design of SERLACHIUS MUSEUM-GSTA EXTENSION in Mntt (Finland)
COMPETITIONS Before we can feel the new spirit which must envelop the days to come we must prepare ourselves to use intelligently the knowledge derived from all sources.
Nostalgic yearning for the ways of the past will find but
few ineffectual supporters.
LOUIS KAHN (Louis I Kahn, :)
Limportant dans la vie ce nest point le triomphe,
mais le combat, lessentiel ce nest pas davoir vaincu
mais de stre bien battu. Pierre de Coubertin
Even thought victory is nice especially if the battle field
is peaceful field of ideas and knowledge, we obtain new
experience, knowledge and frequently new friendships
with people participating on the competition. I have
never regretted when I didnt win. New knowledge
obtained during the work on a project will help next time
to be better and build up buildings with higher qualities.
design, landscape architecture
Finland/MnttSERLACHIUS MUSEUM
The Gsta Serlachius art collection is one of the biggest museums in the Nordic countries; and it contains one of the most significant private collections
of Finland. The Gsta Serlachius Fine Arts Foundation organised an open international competition for the design of an extension of their museum, the Joenniemi
Manor. The extension was supposed to include new services for exhibitions; collections; conferences; offices as well as a restaurant with auxiliary spaces.
A new main foyer and ticket sales facilities were also included in the new project. In total, the net floor area of the extension was about , m.
The extension of the Museum was supposed to be compatible with its unique natural environment and it was also expected that it would keep a certain
balance between the functional and technical characteristics of the existing building. In addition, the design should adhere to the principles of sustainable
architecture. Therefore, the development of a good proposal was a sort of dare for me and the team of architects with whom I worked with.
In order to connect the new building with the beautiful surrounding park, we decided to build up the new edifice in between an existing island and the
mainland. Thus the building would replace a historical, but destroyed bridge that has previously connected the mainland with the isle. Our proposal
allowed the practising of winter sports and the visitors could walk around the structure of the museum.
SERLACHIUS MUSEUMLocation of Extension Gsta Serlachius Fine arts Foundation is result of studies of the territory, current buildings placed on that and all related historical , environmental and cultural significances. Solitary position of Taavetinsaari in the landscape, its distance from shore of mainland, good visual relation to manor, its surroundings and parking plus advantageous connection to original ways and new ones as well make the island Taavetinsaari suitable position to place new museum building.Final position is based on mergence architectural, functional and landscape aspects. Idea of usage of the new building like a bridge, usage water surface with part of island like landscape scenery of atrium in the new building and simple service connection to the each function of the museum required chosen location connecting island with the cape. Museum is next solitaire in net of current buildings of the cape. Thanks to the distance and connection to the original symmetrical plant-lined paths leading to manor is achieved harmonic coexistence Joenniemi manor, its surroundings and new museum.
Architectural features are based on functional requirements of circulation motion of visitors in exhibition area. Also sizes of all functions including in the museum, lighting and harmony with the landscape influence the shape and architectural features of the building. Circulation motion is used like main concept of primary part of the museum. Infers circle form of outer coat. Requirements to lighting lead to creation of atrium. Its shape is formed by inserted functions which have different sizes. The different sizes generate curved shape of the atrium. Increasing height of the ring from entrance to its opposite side is based on different requirements of each function placed in the ring. The museum is arched from island to the mainland over the cove of the lake Melasjrvi. The building is carry by support plate with pillars. The shape of plate with pillars is designed according to the shape of liquid between two solid boards. Exterior facades are made by glass boards with increased reflective effect. The surrounding landscape is reflected in the exterior facades. Interior spaces are glassed-in to the atrium except the part of exhibition areas for paintings. Atrium includes a sculpture placed on the pillar of original bridge led from mainland to island. The pillar together with the sculpture is on axis manor entrance foyer sculpture.
MPST219
entrance foyer
0.000 = 103.0
+ 6.000
+ 11.000
exhibition
archive exhibition exhibition storage storage
0.000 = 103.0
+ 8.500 + 8.500
+ 11.000
archive storage
0.000 = 103.0
+ 8.500 + 8.500
+ 11.000
+ 6.000
SERLACHIUS MUSEUM
MPST219
Section 01
Section 02
Elevation
10 20 30 40 500m
trical rooms
info
waste storage
freezer
restaurant
shop.
tickets
ce
o ce
auxiliary room
o ce
storage
toilets.
Collections
Joenniemi Manor Collection
equip.
additional ele
entrance0.00 = 103.00 m.a.s.l.
Section 01
Section 02
toilets
service
handling
preparation kitchen
archives
artwork storage
conservation
cloakroom
foyerstor.
shop stor.
o ce
copy
storeroom
shower.
st .facil.
breakroom
sculptures exhibition
assembly hall
chairstorage
pedagogy
back. space,storage
localstor.
TravellingExhibitions 01
Chillout
TravellingExhibitions 02
Civil defence shelter(storage)
bodega
service
servicestorages
propertycontrolroom
storages
storages
conference room
toiletsstorage
library
lounge
break room
headmaster secretary
exhibition Gustaf Adolf Serlachius and Gsta Serlachius
reception
service
toilets cloakroom
MPST219
SERLACHIUS MUSEUM
MPST219
New sauna is situated on the foundations of old sauna. It is accessible by rowboat or by new building connection.
The current exhibition in manor building is moved to the new building because of better conditions in new building. We propose oces and exhibition Gustaf Adolf Serlachius and Gsta Serlachius in the manor building.
Sauna
Second oor
Manor building
First oor
Basement
99,8
99,8
99,9
102
102
104
106
100
108
1061
07
100
101
107
102
102
104
103
104
102
100
100
101
103
101,5
103,5
105,5
107,6
107,1
107,1
3,3
101,8
99,8
104,7
107,1 106,0107,6
102,0
102,5
105,3
105,3
103,1
108,4
103,7
104,2
101,4
102,6
1
99,
102,3
100,2
102,8
103,5
105,6
105,7
99,9
107,1
110022
103,7
102
1100111
99,8
99,8
99,9
102
102
104
106
100
108
1061
07
100
101
107
102
102
104
103
104
102
100
100
101
103
101,5
103,5
105,5
107,6
107,1
107,1
3,3
101,8
99,8
104,7
107,1 106,0107,6
102,0
102,5
105,3
105,3
103,1
108,4
103,7
104,2
101,4
102,6
1
99,
102,3
100,2
102,8
103,5
105,6
105,7
99,9
107,1
unique trees
park
water
sculptures
sauna
forest
parking
SERLACHIUS MUSEUM
MPST219
The circulation in whole area works in closed loops. Rowboat can be used as an interesting way how to get to the new atrium and sauna. The new building is accessible also from ice during wintertime.
The manor is sited at a visually prominent location in very high quality landscape. All the intersting points are scattered in area. We respect the manor and keep it dominant. The new building is another interesting point in area which is linked with the manor by original tree alley. There is a sculpture on the pilot of old bridge as a virtual end of main axis.
Flows
Land art concept
wooden ceiling reective glass
sandwich wall with heat insulation
clear glass with reective layer
exposed concrete system of rotatable lamelas
storage entrance
main entranceT2
T1
E1
E2
storage entrance
main entrance T2
T1
E1
E2
storage entrance
main entranceT2
T1
E1
E2
storage entrance
main entranceT2
T1
E1
E2
exible panels_big formatssmall formatpeople ow
view orientation
exible panels_big formatssmall formatpeople ow
view orientation
traveling exhibition 1traveling exhibition 2Joenniemi collection (moved from manor)
exhibition owstorage loading
exhibition
treatment and storage facilitiesclosed exhibition part
T1T2
collectionsE2E1
SERLACHIUS MUSEUM
MPST219
Exhibition
Rotatable panels
Materials
Exhibition space is divided into four parts and creates very exible exhibition space. When T1 is closed the chill out area is used as a connection part. The rotatable panels makes the space maximum variable and exible.
Last layer of the outer facade is reective glass. The building reects beautiful nature around and grows together with suroundings. When the weather and seasons is changing the museum is changing too.
design, landscape architecture
Roudnice/Czech republicFUNERAL HOUSE
I decided to participate, collaborating with a team of architects, in a competition for the design of a funeral house. The project appealed to us since we
should design a building figuratively neutral since it would be used by people belonging to different religions. However, the funeral house should contain a
subtle symbolism strong enough to honour and commemorate the dead person. The space where the funeral house would be placed played an important role when we came to elaborate the design of the building. The area
surrounding the building contributed to create the spiritual meaning that we pretended to associate with the funeral house.
The access to the building includes a garden where people can spend some time in order to get calm, think and recall the dead person. The
landscape architecture of the garden has been designed in order to reflect the feelings of desolation and mourning that the visitors experience at the
funeral house. The building itself is divided into three areas. There is a low horizontal space where the preliminaries of the ceremony should take place. Other two
conical spaces include the main foyer and the ceremony hall.
SMUTEN S DO ROUDNICE NAD LABEM
STROM SYMBOL IVOTA
M 1: 500
M 1: 100
S
VODA PECHOD NA DRUHOU STRANU
MONUMENT SYMBOL
ZAHRADA ODPOINKU
OBJEKT
KONCEPT
ROZDELEN HMOT
VYSUNUT OBJEMU ZAHRADA ODPOINKU
ZAHRADA
PARKOVIT
ODVOZ RAKVE/ KREMACE
CESTA ZESNULHOOTEVEN SN
HBITOV
PJEZD
VYLOEN RAKVE
HBITOV
SMUTEN S
VESTIBUL
PROVOZ
VEEJNOST
LEGENDA PROSTORY PRO VEEJNOST
ZZEM SMUTEN SN
VYSTAVEN ZESNULHOMSTNOST PRO NEJBLI
PCHODVCHOD
SMUTEN S
KONCEPT EEN SMUTEN SN V RMCI DANHO POZEMKU JE VYSTAVN NA DVOJICI ODLINCH SVT, KDE S JE PEDLEM MEZI TMITO SVTY. V RMCI POZEMKU JE JEDEN SVT OD DRUHHO DLEN CELM OBJEKTEM A STEJN TAK SE TATO SYMBOLIKA UPLATUJE V LENN CELHO OBJEKTU. ZLOMOVM A PECHODOVM MSTEM JE HRANICE MEZI VESTIBULEM, JAKO SHROMADIT POZSTALCH A SMUTEN SN, MSTA LOUEN A ODDLE-N DUE OD TLA.
EFEKTIVN PROVOZ V RMCI PARCELY A JI PILEHLCH ZAJIUJE PODLN LENN NA 4 STI. JEDNOTLIVM STEM JE PIDLEN SPECIFICK EL. V PM NVAZNOSTI K ULICI U HBITOVA JE PARKOVIT ZAJIUJC 30 STN OSOBNCH AUT PRO SMUTEN S, 20 STN PRO HBITOV A JEDNO STN AUTOBUSU. ODDLENO JE OD NAVAZUJC STI GABIONOVOU STNOU, KTER ME SLOUIT JAKO KOLUMBRIUM. DAL ST JE VNOVNA ZAHRAD. TA SLOU JAKO PROSTOR PRO SHROMDN, PRO AS POTEBN PRO PPRAVU POZSTALCH NA OBAD, NEBO PO JEHO SKONEN SE POZSTAL MOHOU V ZAHRAD ZDRET. POZEMEK POKRAUJE SAMOTNM OBJEKTEM DLC ST PSTUPNOU PRO POZSTAL OD POSLEDN STI POZEMKU KAM JIM JI NEN UMONN VSTUP A NEDOCHZ TAK K POTKV-N ZAMSTNANC A POZSTALCH. POSLEDN SEKCE POZEMKU JE NAPLNNA DVMA FUNKCEMI. PRVN JE PJEZDOV CESTA PRO ZAMSTNANCE VETN PVOZU A ODVOZU POZSTALCH Z ULICE TEREZNSK. DRUHOU JE ZAHRA-DA NAVAZUJC NA SMUTEN S A SYMBOLIZUJE PROSTOR, KDE DUE POZSTALHO ME SPOINOUT.
12345678
SMUTEN SVNITN VESTIBULKRYT PEDPROSTORMSTNOST PRO VYSTAVEN RAKVEMSTNOST PRO NEJBLI POZSTALMSTNOST PRO SETKN PO KONDOLENCIPROSTOR PRO SETKN/ODVOZ NEBOTKAWC
910111213141516171819202122
MSTNOST PRO JEDNN S POZUSTALMIKANCELZZEM KANCELE/SKLAD/KUCHYKA/WCGARE VKLAD POHEBNCH VOZKRYT PROSTOR PRO VJEZD DO GARKOMUNIKACECHLAZEN SKLAD ZEMELCHPPRAVNA ZEMELCHKLIDOV KOMORASKLADATNASTROJOVNA TZBSKLADSKLAD ODPADK
1
6
72
3
45
910
8
11
12
18 17
13
14
151619202122
IR VZTAHY 01
SMUTEN S DO ROUDNICE NAD LABEM
STROM SYMBOL IVOTA
M 1: 500
M 1: 100
S
VODA PECHOD NA DRUHOU STRANU
MONUMENT SYMBOL
ZAHRADA ODPOINKU
OBJEKT
KONCEPT
ROZDELEN HMOT
VYSUNUT OBJEMU ZAHRADA ODPOINKU
ZAHRADA
PARKOVIT
ODVOZ RAKVE/ KREMACE
CESTA ZESNULHOOTEVEN SN
HBITOV
PJEZD
VYLOEN RAKVE
HBITOV
SMUTEN S
VESTIBUL
PROVOZ
VEEJNOST
LEGENDA PROSTORY PRO VEEJNOST
ZZEM SMUTEN SN
VYSTAVEN ZESNULHOMSTNOST PRO NEJBLI
PCHODVCHOD
SMUTEN S
KONCEPT EEN SMUTEN SN V RMCI DANHO POZEMKU JE VYSTAVN NA DVOJICI ODLINCH SVT, KDE S JE PEDLEM MEZI TMITO SVTY. V RMCI POZEMKU JE JEDEN SVT OD DRUHHO DLEN CELM OBJEKTEM A STEJN TAK SE TATO SYMBOLIKA UPLATUJE V LENN CELHO OBJEKTU. ZLOMOVM A PECHODOVM MSTEM JE HRANICE MEZI VESTIBULEM, JAKO SHROMADIT POZSTALCH A SMUTEN SN, MSTA LOUEN A ODDLE-N DUE OD TLA.
EFEKTIVN PROVOZ V RMCI PARCELY A JI PILEHLCH ZAJIUJE PODLN LENN NA 4 STI. JEDNOTLIVM STEM JE PIDLEN SPECIFICK EL. V PM NVAZNOSTI K ULICI U HBITOVA JE PARKOVIT ZAJIUJC 30 STN OSOBNCH AUT PRO SMUTEN S, 20 STN PRO HBITOV A JEDNO STN AUTOBUSU. ODDLENO JE OD NAVAZUJC STI GABIONOVOU STNOU, KTER ME SLOUIT JAKO KOLUMBRIUM. DAL ST JE VNOVNA ZAHRAD. TA SLOU JAKO PROSTOR PRO SHROMDN, PRO AS POTEBN PRO PPRAVU POZSTALCH NA OBAD, NEBO PO JEHO SKONEN SE POZSTAL MOHOU V ZAHRAD ZDRET. POZEMEK POKRAUJE SAMOTNM OBJEKTEM DLC ST PSTUPNOU PRO POZSTAL OD POSLEDN STI POZEMKU KAM JIM JI NEN UMONN VSTUP A NEDOCHZ TAK K POTKV-N ZAMSTNANC A POZSTALCH. POSLEDN SEKCE POZEMKU JE NAPLNNA DVMA FUNKCEMI. PRVN JE PJEZDOV CESTA PRO ZAMSTNANCE VETN PVOZU A ODVOZU POZSTALCH Z ULICE TEREZNSK. DRUHOU JE ZAHRA-DA NAVAZUJC NA SMUTEN S A SYMBOLIZUJE PROSTOR, KDE DUE POZSTALHO ME SPOINOUT.
12345678
SMUTEN SVNITN VESTIBULKRYT PEDPROSTORMSTNOST PRO VYSTAVEN RAKVEMSTNOST PRO NEJBLI POZSTALMSTNOST PRO SETKN PO KONDOLENCIPROSTOR PRO SETKN/ODVOZ NEBOTKAWC
910111213141516171819202122
MSTNOST PRO JEDNN S POZUSTALMIKANCELZZEM KANCELE/SKLAD/KUCHYKA/WCGARE VKLAD POHEBNCH VOZKRYT PROSTOR PRO VJEZD DO GARKOMUNIKACECHLAZEN SKLAD ZEMELCHPPRAVNA ZEMELCHKLIDOV KOMORASKLADATNASTROJOVNA TZBSKLADSKLAD ODPADK
1
6
72
3
45
910
8
11
12
18 17
13
14
151619202122
IR VZTAHY 01
M 1: 100
EZ PODLN
POHLEDY BON
POHLED ZADN
POHLED ELN
SMUTEN S DO ROUDNICE NAD LABEM
DETAILN EEN 02
SMUTEN S DO ROUDNICE NAD LABEM
STROM SYMBOL IVOTA
M 1: 500
M 1: 100
S
VODA PECHOD NA DRUHOU STRANU
MONUMENT SYMBOL
ZAHRADA ODPOINKU
OBJEKT
KONCEPT
ROZDELEN HMOT
VYSUNUT OBJEMU ZAHRADA ODPOINKU
ZAHRADA
PARKOVIT
ODVOZ RAKVE/ KREMACE
CESTA ZESNULHOOTEVEN SN
HBITOV
PJEZD
VYLOEN RAKVE
HBITOV
SMUTEN S
VESTIBUL
PROVOZ
VEEJNOST
LEGENDA PROSTORY PRO VEEJNOST
ZZEM SMUTEN SN
VYSTAVEN ZESNULHOMSTNOST PRO NEJBLI
PCHODVCHOD
SMUTEN S
KONCEPT EEN SMUTEN SN V RMCI DANHO POZEMKU JE VYSTAVN NA DVOJICI ODLINCH SVT, KDE S JE PEDLEM MEZI TMITO SVTY. V RMCI POZEMKU JE JEDEN SVT OD DRUHHO DLEN CELM OBJEKTEM A STEJN TAK SE TATO SYMBOLIKA UPLATUJE V LENN CELHO OBJEKTU. ZLOMOVM A PECHODOVM MSTEM JE HRANICE MEZI VESTIBULEM, JAKO SHROMADIT POZSTALCH A SMUTEN SN, MSTA LOUEN A ODDLE-N DUE OD TLA.
EFEKTIVN PROVOZ V RMCI PARCELY A JI PILEHLCH ZAJIUJE PODLN LENN NA 4 STI. JEDNOTLIVM STEM JE PIDLEN SPECIFICK EL. V PM NVAZNOSTI K ULICI U HBITOVA JE PARKOVIT ZAJIUJC 30 STN OSOBNCH AUT PRO SMUTEN S, 20 STN PRO HBITOV A JEDNO STN AUTOBUSU. ODDLENO JE OD NAVAZUJC STI GABIONOVOU STNOU, KTER ME SLOUIT JAKO KOLUMBRIUM. DAL ST JE VNOVNA ZAHRAD. TA SLOU JAKO PROSTOR PRO SHROMDN, PRO AS POTEBN PRO PPRAVU POZSTALCH NA OBAD, NEBO PO JEHO SKONEN SE POZSTAL MOHOU V ZAHRAD ZDRET. POZEMEK POKRAUJE SAMOTNM OBJEKTEM DLC ST PSTUPNOU PRO POZSTAL OD POSLEDN STI POZEMKU KAM JIM JI NEN UMONN VSTUP A NEDOCHZ TAK K POTKV-N ZAMSTNANC A POZSTALCH. POSLEDN SEKCE POZEMKU JE NAPLNNA DVMA FUNKCEMI. PRVN JE PJEZDOV CESTA PRO ZAMSTNANCE VETN PVOZU A ODVOZU POZSTALCH Z ULICE TEREZNSK. DRUHOU JE ZAHRA-DA NAVAZUJC NA SMUTEN S A SYMBOLIZUJE PROSTOR, KDE DUE POZSTALHO ME SPOINOUT.
12345678
SMUTEN SVNITN VESTIBULKRYT PEDPROSTORMSTNOST PRO VYSTAVEN RAKVEMSTNOST PRO NEJBLI POZSTALMSTNOST PRO SETKN PO KONDOLENCIPROSTOR PRO SETKN/ODVOZ NEBOTKAWC
910111213141516171819202122
MSTNOST PRO JEDNN S POZUSTALMIKANCELZZEM KANCELE/SKLAD/KUCHYKA/WCGARE VKLAD POHEBNCH VOZKRYT PROSTOR PRO VJEZD DO GARKOMUNIKACECHLAZEN SKLAD ZEMELCHPPRAVNA ZEMELCHKLIDOV KOMORASKLADATNASTROJOVNA TZBSKLADSKLAD ODPADK
1
6
72
3
45
910
8
11
12
18 17
13
14
151619202122
IR VZTAHY 01
SMUTEN S DO ROUDNICE NAD LABEM
STROM SYMBOL IVOTA
M 1: 500
M 1: 100
S
VODA PECHOD NA DRUHOU STRANU
MONUMENT SYMBOL
ZAHRADA ODPOINKU
OBJEKT
KONCEPT
ROZDELEN HMOT
VYSUNUT OBJEMU ZAHRADA ODPOINKU
ZAHRADA
PARKOVIT
ODVOZ RAKVE/ KREMACE
CESTA ZESNULHOOTEVEN SN
HBITOV
PJEZD
VYLOEN RAKVE
HBITOV
SMUTEN S
VESTIBUL
PROVOZ
VEEJNOST
LEGENDA PROSTORY PRO VEEJNOST
ZZEM SMUTEN SN
VYSTAVEN ZESNULHOMSTNOST PRO NEJBLI
PCHODVCHOD
SMUTEN S
KONCEPT EEN SMUTEN SN V RMCI DANHO POZEMKU JE VYSTAVN NA DVOJICI ODLINCH SVT, KDE S JE PEDLEM MEZI TMITO SVTY. V RMCI POZEMKU JE JEDEN SVT OD DRUHHO DLEN CELM OBJEKTEM A STEJN TAK SE TATO SYMBOLIKA UPLATUJE V LENN CELHO OBJEKTU. ZLOMOVM A PECHODOVM MSTEM JE HRANICE MEZI VESTIBULEM, JAKO SHROMADIT POZSTALCH A SMUTEN SN, MSTA LOUEN A ODDLE-N DUE OD TLA.
EFEKTIVN PROVOZ V RMCI PARCELY A JI PILEHLCH ZAJIUJE PODLN LENN NA 4 STI. JEDNOTLIVM STEM JE PIDLEN SPECIFICK EL. V PM NVAZNOSTI K ULICI U HBITOVA JE PARKOVIT ZAJIUJC 30 STN OSOBNCH AUT PRO SMUTEN S, 20 STN PRO HBITOV A JEDNO STN AUTOBUSU. ODDLENO JE OD NAVAZUJC STI GABIONOVOU STNOU, KTER ME SLOUIT JAKO KOLUMBRIUM. DAL ST JE VNOVNA ZAHRAD. TA SLOU JAKO PROSTOR PRO SHROMDN, PRO AS POTEBN PRO PPRAVU POZSTALCH NA OBAD, NEBO PO JEHO SKONEN SE POZSTAL MOHOU V ZAHRAD ZDRET. POZEMEK POKRAUJE SAMOTNM OBJEKTEM DLC ST PSTUPNOU PRO POZSTAL OD POSLEDN STI POZEMKU KAM JIM JI NEN UMONN VSTUP A NEDOCHZ TAK K POTKV-N ZAMSTNANC A POZSTALCH. POSLEDN SEKCE POZEMKU JE NAPLNNA DVMA FUNKCEMI. PRVN JE PJEZDOV CESTA PRO ZAMSTNANCE VETN PVOZU A ODVOZU POZSTALCH Z ULICE TEREZNSK. DRUHOU JE ZAHRA-DA NAVAZUJC NA SMUTEN S A SYMBOLIZUJE PROSTOR, KDE DUE POZSTALHO ME SPOINOUT.
12345678
SMUTEN SVNITN VESTIBULKRYT PEDPROSTORMSTNOST PRO VYSTAVEN RAKVEMSTNOST PRO NEJBLI POZSTALMSTNOST PRO SETKN PO KONDOLENCIPROSTOR PRO SETKN/ODVOZ NEBOTKAWC
910111213141516171819202122
MSTNOST PRO JEDNN S POZUSTALMIKANCELZZEM KANCELE/SKLAD/KUCHYKA/WCGARE VKLAD POHEBNCH VOZKRYT PROSTOR PRO VJEZD DO GARKOMUNIKACECHLAZEN SKLAD ZEMELCHPPRAVNA ZEMELCHKLIDOV KOMORASKLADATNASTROJOVNA TZBSKLADSKLAD ODPADK
1
6
72
3
45
910
8
11
12
18 17
13
14
151619202122
IR VZTAHY 01
WORKS No architect can rebuild a cathedral of another epoch embodying the desires, the aspirations, the love and hate of the people whose heritage it became. Therefore the images w have before us of monumental structures of the past cannot live again with the same intensity and meaning. Their faithful duplication is unreconcible. But we dare not discard the lessons these buildings teach for they have the common characteristics of greatness upon which the buildings of our future must, in one sence or another, rely. LOUIS KAHN (Louis I Kahn, :)
I consider that the responsibility of architects is to find a solution that combines the splendor of the past, the benefits of modern technology and the personal creativity and aspirations of the architect. As each proposal represents a sort of legacy for the future, we should insist on our attempts to find certain harmony between modern and ecological results without eliminating the functionality of the building. The coexistence of aesthetic values and the requirements of the users is fundamental to achieve a high-quality result. Thus, it is possible to state that modern technology and the genius loci are the answers for the design of the buildings of the future.
reconstruction, extension
Brno/Czech republicFAMILY HOUSE The original building is situated in the city of Brno at Horova Street. This part of the city is a calm neighbourhood with family houses and some gardens. The investor decided to reconstruct the original building by adding a new residential part. The shape of the parcel, its slant and orientation to the south were decisive aspects for the design of the new residential part. In my proposal, the new residential part is divided into few different levels according with the slant of the parcel. The fact that the narrow parcel in which the residential area should be built up is orientated to the south complicated the lighting of the rooms. Therefore, I decided to create a central hall and to connect the rooms with atriums that will allow the entry of the exterior light. To improve lighting in corridor and offer views to garden, the east facade is designed from parts panels. These panels change their position in turns
regarding to the corridor. Two different positions of panels allows to make vacancy between them. This allows to get in more light and offer views to garden. The structure of the house is made up of cast-in-situ concrete and some parts are proposed as tilt-up constructions.
design
Znojmo/Czech republicFAMILY HOUSE This house is situated in the city of Znojmo. The historical center of the city includes few valuable historical monuments. One of the most important landmarks of Znojmo is the rotunda of Saint Katerina. The designed house is not placed in the city center, but it is situated in the south part of the city next to a park. The investor has asked for the design of family house for four members including a private space in his plot of land. The creation of a private space was a big challenge since the parcel is surrounded by high blocks of flats. In order to provide the house with certain privacy, my proposal uses the entrance corridor to the kitchen and the garage as a sort of shield against the lack of privacy caused by the blocks of flats and the presence of a road next to the house. Those rooms destined to the whole family and visitors are placed at the ground floor adjacent to the entrance. At the end of the ground floor we can find the rooms for children and a bathroom. In the first floor there is a spacious bedroom with bathroom and a cloakroom. Next to the bedroom there is an enclosed terrace that keeps the privacy of the room and offers an exterior sheltered space.
urbanism, design
Brno-Lisen/Czech republicNEW RESIDENCE AREA The investor decided to build up a new residential area in a part of Brno called Lisen. The new residential area was supposed to contain a series of comfortable family houses. However, the slant of the terrain complicated the design of the residential area. Besides, the area should include a series of different house types with different levels of comfort and price. The variations in the styles of the houses avoid the monotony of a residential area with an unique patter for all the buildings. The final proposal contains different kinds of houses with different designs and diverse prices. The most comfortable houses are situated on the
north part of the land next to road in BLOCK II. These houses contain an atrium that can be adjusted according with the specifications of the investor. The houses at the south side in BLOCK I have a lower price since the residences are smaller. Nevertheless, these houses also include a small garden. Besides, a part of the roof is converted into a terrace. BLOCK III includes houses which have one floor made from wood. The specific slant land there causes the terraced lay-out of these houses. The new residential area includes a green park with trees and a playground.
design
Astana/KazakhstanSKYSCRAPER ASTANA I participated on this project during my short term collaboration in atelier SHCA in London. This skyscraper is in Astana, capital city of Kazakhstan. I worked together with a group of architects and designers and our task was to provide other workgroup with visualizations, D models and animations. I also
cooperated as a consultant of mass and space arrangement of all the implied functions. The retail is located at low level and arranged to provide primary and secondary routes through the development to help orientation while encouraging a unique sequence of spaces of differing scales. Winter Gardens on the roofs are heavily planted, providing break out spaces from the mid level lobbies and linking the retail areas. The design of the retail with primary and secondary circulation routes provides maximum flexibility for the letting strategy and allows units to be combined and subdivided to respond to market conditions. Each of the uses is accessed through dedicated private space. A necklace lobby space at level will provide access to the towers for office and residential. This area will also link to the Wintergardens, and connect down to the retail bellow.
design
around the WorldVISUALIZATION, GRAPHIC..... One of my hobbies is to work with D models, visualizations and animations. As I consider that every experience is good to develop our skills I decided
to cooperate with a few ateliers in order to help them to develop their ideas and to improve my abilities. The collaboration I offered to the different studios involved the selection of materials and the development of new products. Thus, I collaborated on the elaboration of basic drafts for new projects, on the creation of the D model and on the making of photo-realistic images and physical models. My experience collaborating with different architecture studios
was quite gratifying since people were satisfied after checking how I was able to represent their ideas in a clear, realistic and comprehensive way.
structural plans, technology
Czech RepublicPROJECT DOCUMENTATION In order to be able to give shape to a project according to his ideas, an architect requires to have a good knowledge of structural engineering, structural analysis, geology and chemistry among others. Not only because my design and graphic skills are appropriate, but also because I have studied four years of Civil Engineering at a specialized high school and I have graduated from the Brno University of Technology in Architecture and Urbanism, I consider I am able to offer to my customers a detailed project of a given building from the first sketches to each structural detail. Besides, my experience as a site engineer has helped me to understand the constructions in a more precise way and to be aware of the workflow involved in the construction of a building.
D-02Detail
302 SVAEN U .12
K3
T19
K1
K2
K4
K5
K6
K7
100
120
150
754
175
250
230
35
6010
0905
225
150
4 02
567
52
280
180
250
280
360
3040
752
665
295
95
3 42
585
512
022
5
130
130
300
850
100
1 05
02
850
2 05
0
420
550
500
500
500
1 85
0
1 25
0
200
150
460
1 80
0
290 1
000
820
2 20
0
200 35
0
2 28
0
250
460
3 75
0
1 00
048
0
1 41
515
0
150
130
5020
010
080
300
520
54%
16x156x288
3%
ABC
D
E
F
GH
-1,200
-3,505
-2,685
-0,305
+0,1500,000
+2,815
+4,175
+3,425+2,700
0,000
+5,185
+2,665
+5,755
+3,110
-0,345
-0,650
-0,150
+0,350
+3,215
EZ AA
-0,800
+4,175
-0,205
-2,5
05
-1,050
D1
D2 D3 D4
D5
1
2
12
1
3
4
4
5
6
98
7
10
10
11
380
625
625
625
625
625
625
625
625
625
625
625
625
625
500
345
300
8 75
030
0
9 35
0
232 24 x 250 233
115 6 250 100
300 5 865 300
6 465
115 6 250 180 625 625 625 625 625 625 625 500 2 915 625 625 465
6 360 5 140 4 550
300 13 700 300 1 450 300
16 050
300
20 x
250
300
175
5 25
017
5
5 00
030
03
450
300
300
5 60
03
750
445
600
250 4 030
200
150
3 81
030
02
300
300
1 70
0
6 000 300 3 285
1 000
70
70
70
70
70
5 950 150 5 150 2 655 1 545
160
70
1 93
0
3 895
3 42
0
590
360
300
B B
A
A
-1,550 -1,550
150
2 66
530
050
010
0460
250
230
100 1
20
855
345
2 81
525
01
110
150 7
52
665
150
10023
090
100
400
605
120
950
1140
500
3002
5023
075
010
054
015
0
300
855
120
150
2 75
025
023
01
171
79
250
150
2 37
530
048
015
0025
0
2 30
5
2 20
5
1 20
512
0150
75
230
6010
0
900
2 67
5
855
120
150
752
675
755
100
270
2 75
0
150
75
350
530
120
1 01
0
100
280
OKA
POV
CHO
DNK
OPLECHOVN ATIKY
OMTNUT ST ATIKY
OPLECHOVN ATIKY
OMTNUT ST ATIKY
KARI SI 100x100MM 8MM
-1,200
-3,505
-0,345
0,000+0,150
+5,185
+2,815
+4,175
+2,675
BA
D
D D
I I
+3,065 +3,155
+5,185
+4,250
-2,685
-1,200
-0,445
0,000
-0,225
+2,815+2,665
+2,165
13,5%
-1,200
+2,515
EZ BB
D1
D2 D3 D4
D5
1
2
12
1
3
4
4
5
6
98
7
10
10
11
380
625
625
625
625
625
625
625
625
625
625
625
625
625
500
345
300
8 75
030
0
9 35
0
232 24 x 250 233
115 6 250 100
300 5 865 300
6 465
115 6 250 180 625 625 625 625 625 625 625 500 2 915 625 625 465
6 360 5 140 4 550
300 13 700 300 1 450 300
16 050
300
20 x
250
300
175
5 25
017
5
5 00
030
03
450
300
300
5 60
03
750
445
600
250 4 030
200
150
3 81
030
02
300
300
1 70
0
6 000 300 3 285
1 000
70
70
70
70
70
5 950 150 5 150 2 655 1 545
160
70
1 93
0
3 895
3 42
0
590
360
300
B B
A
A
T2
2T
6T
T7
T1
T1
8 T9 T
9 T
T5
T3
T10
800
1970
+705
T10
12T
900
2675
T14
8001970
T14
800
1970
T13
8001970
11 T
7001970
T16
700
1970
T15
9002375
71 T
11001970
P9
P5
P2
P3
P4
P4
P2
P5
P5P
5
P5
800
1970
+705
P7
900
2665
900
2665
900
2400
+102
5
16x1
56x2
88
T19
101
102
103 104
105
106
115107108
109
011111 112
113
114
116
NIK
A PR
O N
DR
KU
WC
RO
ZM
RY
DLE
VR
OBC
E
0,000
+0,150
+0,150
0,000
0,000
0,000
+0,1500,000
+0,1500,000
P8
PVOD VZDUCHU KEKRBOV VLOCE
(2675)
(2675) 117
0,000
KAMENN OBKLADKAMENNOBKLAD
KAMENNOBKLAD
PODH
LED,S
DROK
ARTO
N (+2,
515)
P9
+0,150
P1
11001970
71 T
T4P
6
P11P10
118
D-01Detail
6 935 300 7 350 300 1 700 300
1 20
01
340
1 20
051
518
0067
020
0
9 33
030
020
0
200 300 6 750 300 9 535
17 585
1 30
01
400
1 20
080
01
100
300
5 00
030
020
04
330
300
2 29
030
01
700
8 92
0
65
1 000 300
6530
01
250
500
115
1 97
0
500
2 14
05 000
2 57
5
900
900200
1 700 1 300 1 765
4 40
0
3 500
2200
3 200
1 48
0
1 30
01
500
400
4 50
030
020
065
565
1 20
065
1 08
065
655
2 50
01
375
4 59
0
1 03
05030
050
1 7503 250
500
50
200475
65
300 4 725
75
800
140
770
4 26
0
2 065 115 900 65 2 220 65 900 65 540 115
65
300
115
1 50
011
52
410
2 84
0
652
330
1 20
0
200 300
200
3 20
5
190
400
1 03
060
0
65
1700
7 250 400 1 950
200
300 200
200
200
900
6 00
0
3 535
200
300
10 3
30
1 83
070
0
3 685 115 3 135 115 7 770 65
400
800
2 385
3 485
200 1 835 1 400
300 200
200
17 585
45
200
160
40
160
40
250 4 285
500
165 800 800
1 850 1 400
100
900
3 26
0
1 200
1100 65 900
590
615
210
1 10
0
2 000
700 400
KRBOV VLOKA ZEUS 407
PRVN OSADIT STAVEBNPOUZDRO, POTVYBETONOVAT PIL
100x100
2675 (0) 2675 (0) 2665 (0)
500
(192
5)
25402540
2 37
52050
2050
2050
2050
500
(192
5)50
0 (1
925)
500
(186
5)
A
A
2 05
02 42
5 (0
)
3 425
B B
500
(186
5)
2 05
0
C
C
E E
D D
577,000 M.N.M
Souadn systm: JTSKVkov systm: BpV
0,000=
5013
65 120 80 25
100
120
530
120
4040
200
2030
015
415
1555
755
900
75 10
7010
910
730
1555
50 13 300 15
D
EV
N
O
KNO
S T
RO
JIT
M T
EPEL
N
IZO
LA
NM
ZA
SKLE
NM
TALOV HMODINKA S KOVOVM HROTEM DL. 260MM
VOLN
SP
RA
KAM
ENN
HO
OBK
LAD
U W
ILD
STO
NE
D
EV
N
D
ESKA
TL.
15M
M
. 100
MM
P
IDR
UJ
C T
I
KAM
ENN
O
BKLA
D W
ILD
STO
NE-
TP
AN
PSK
OVE
C T
L. 5
0-60
MM
LEP
C T
MEL
PR
O K
AMEN
N
OBK
LAD
Y W
ILD
STO
NE
ZDIV
O Z
CP
TL. 6
5MM
NA
MC
MIN
ERL
N V
LNA
RO
CKW
OO
L AI
RR
OC
K SL
TL.
120
MM
MIN
ERL
N V
LNA
RO
CKW
OO
L AI
RR
OC
K SL
TL.
80M
MD
E
V
N
OBK
LAD
Z P
ALU
BEK
TL. 2
5MM
. 1
20M
M
KAM
ENN
O
BKLA
D W
ILD
STO
NE-
TP
AN
PSK
OVE
C T
L. 5
0-60
MM
LEP
C T
MEL
PR
O K
AMEN
N
OBK
LAD
Y W
ILD
STO
NE
ZDIV
O K
ERAT
HER
M T
L. 3
00M
M, M
VCVN
IT
N O
MT
KA M
VC
TEN
KOVR
STV
LE
CH
TN
O
MT
KA P
RO
BAR
VEN
S
VST
UN
OU
SO
VIN
OU
EXPA
ND
OVA
N
FAS
DN
PO
LYST
YREN
TL.
200
MM
OM
TKA
MVC
TL.
20M
MZD
IVO
KER
ATH
ERM
TL.
300
MM
VNIT
N
OM
TKA
MVC
20 300 15 200 5
205
320
100
1223
812
20 300 15 200 120 535 120 85 25
2534
0
50
170
2015
4020
015
OC
ELO
V P
P
ON
KA T
L. 2
MM
OCELOV PRPONKA TL. 2MM
D
EV
N
O
KNO
S T
RO
JIT
M T
EPEL
N
IZO
LA
NM
ZA
SKLE
NM
OCELOV PRPONKA TL. 2MM
OHBAN PSOVINA 3MM, . 60MMPSOVINA TL. 5MM, . 60MMPIVAEN K I NOSNKMPO 500MM
VLCOVAN NOSNKY I . 32
LEPEN DEVN NOSNKY
DEVN ZKLOP Z PRKEN TL. 15MMMINERLN VLNA AIRROCK TL. 200MMEXTRUDOVAN POLYSTYREN TL. 40MMDEVN PODBIT Z PRKEN TL. 15MMVNITN OMTKA MVC
POJISTN HYDROIZOLACE Z MODIFIKOVANHO ASF. PSU TYPU SHYDROIZOLACE Z MKENHO PVCOPLECHOVN Z TITANZINKOVHO PLECHU TL. 0,6MM
TEN
KOVR
STV
LE
CH
TN
O
MT
KA P
RO
BAR
VEN
S
VST
UN
OU
S
OVI
NO
U
EXPA
ND
OVA
N
FAS
DN
PO
LYST
YREN
TL.
200
MM
OM
TKA
MVC
TL.
20M
MZD
IVO
KER
ATH
ERM
TL.
300
MM
VNIT
N
OM
TKA
MVC
HLAVN ARCHITEKT VYPRACOVAL
INVESTOR
ZODP.PROJEKTANT
577,000 M.N.M
Souadn systm: JTSKVkov systm: BpV
0,000=
Dostlovi
Rodinn dm DOSTLOVI
JOSEF POSPIL JOSEF POSPIL Doc.Ing. Maixner Csc
FORMT
DATUM 26.LEDNA 2009
5013
65 120 80 25
2510
012
053
012
0
4040
200
2030
015
415
1555
755
2540
63 12037 40
25
900
350
2575 1
0
7010
910
730
1555
50 13 300 15
SAMOEZN VRUT 4MM, DL. 40MM
OHBAN PSOVINA 3MM, . 60MM
D
EV
N
O
KNO
S T
RO
JIT
M T
EPEL
N
IZO
LA
NM
ZA
SKLE
NM
TALOV HMODINKA S KOVOVM HROTEM DL. 260MM
VOLN
SP
RA
KAM
ENN
HO
OBK
LAD
U W
ILD
STO
NE
D
EV
N
D
ESKA
TL.
15M
M
. 100
MM
P
IDR
UJ
C T
I
KAM
ENN
O
BKLA
D W
ILD
STO
NE-
TP
AN
PSK
OVE
C T
L. 5
0-60
MM
LEP
C T
MEL
PR
O K
AMEN
N
OBK
LAD
Y W
ILD
STO
NE
ZDIV
O Z
CP
TL. 6
5MM
NA
MC
MIN
ERL
N V
LNA
RO
CKW
OO
L AI
RR
OC
K SL
TL.
120
MM
MIN
ERL
N V
LNA
RO
CKW
OO
L AI
RR
OC
K SL
TL.
80M
MD
E
V
N
OBK
LAD
Z P
ALU
BEK
TL. 2
5MM
. 1
20M
M
KAM
ENN
O
BKLA
D W
ILD
STO
NE-
TP
AN
PSK
OVE
C T
L. 5
0-60
MM
LEP
C T
MEL
PR
O K
AMEN
N
OBK
LAD
Y W
ILD
STO
NE
ZDIV
O K
ERAT
HER
M T
L. 3
00M
M, M
VCVN
IT
N O
MT
KA M
VC
TEN
KOVR
STV
LE
CH
TN
O
MT
KA P
RO
BAR
VEN
S
VST
UN
OU
SO
VIN
OU
EXPA
ND
OVA
N
FAS
DN
PO
LYST
YREN
TL.
200
MM
OM
TKA
MVC
TL.
20M
MZD
IVO
KER
ATH
ERM
TL.
300
MM
VNIT
N
OM
TKA
MVC
20 300 15 200 5
205
320
100
1223
812
20 300 15 200 120 535 120 85 25
2534
0
50
170
2015
4020
015
OC
ELO
V P
P
ON
KA T
L. 2
MM
OCELOV PRPONKA TL. 2MM
D
EV
N
O
KNO
S T
RO
JIT
M T
EPEL
N
IZO
LA
NM
ZA
SKLE
NM
OCELOV PRPONKA TL. 2MM
OHBAN PSOVINA 3MM, . 60MMPSOVINA TL. 5MM, . 60MMPIVAEN K I NOSNKMPO 500MM
VLCOVAN NOSNKY I . 32
LEPEN DEVN NOSNKY
DEVN ZKLOP Z PRKEN TL. 15MMMINERLN VLNA AIRROCK TL. 200MMEXTRUDOVAN POLYSTYREN TL. 40MMDEVN PODBIT Z PRKEN TL. 15MMVNITN OMTKA MVC
POJISTN HYDROIZOLACE Z MODIFIKOVANHO ASF. PSU TYPU SHYDROIZOLACE Z MKENHO PVCOPLECHOVN Z TITANZINKOVHO PLECHU TL. 0,6MM
TEN
KOVR
STV
LE
CH
TN
O
MT
KA P
RO
BAR
VEN
S
VST
UN
OU
S
OVI
NO
U
EXPA
ND
OVA
N
FAS
DN
PO
LYST
YREN
TL.
200
MM
OM
TKA
MVC
TL.
20M
MZD
IVO
KER
ATH
ERM
TL.
300
MM
VNIT
N
OM
TKA
MVC
EDUCATION A man is always greater than his works because he can never trully express his aspirations. To express oneself in music or architecture, one must employ the measurable means of composition or design. The first line on paper is already a measure of what cannot be expressed fully. The first line
on paper is less. LOUIS KAHN (Louis I Kahn, :)
Since the moment in which I became immersed in the study of architecture I
was concerned with the idea of finding a way of expressing the
immeasurable and represent on paper the designs conceived in my mind. As
the previous quotation by Kahn indicates, one of the main problems of the
architect is to overcome the restrictions imposed by our technological
limitations; architecture can only be represented by the measurable means of composition and design. However, I was determined to use my knowledge of
civil engineering together with my creative imagination in order to establish a
sort of communion between my works and society and to transcend the
restrictions of design. After several experiences, I came to understand that in
order to provide with meaning a certain proposal, the architect should take
into account not only his personal aspirations, but also the idiosyncrasy of the
place in which the proposal will be set. By considering the place, time and
circumstances connected with each of the proposals one will be able to
become near to perfection and to provide the next generations with a
marvelous legacy.
urbanism proposalOLD CITY BRNO Originally, the old part of the city of Brno was an industrial area. In the course of time, the industrial factories were removed and one of the most
important squares - Mendel square - was adapted to serve as traffic junction of the public transport. The adjustments made in order to readapt its
function caused considerable damages in the original face and purpose of the square. The new function of the square restricted the potential uses of
the public space since pedestrian uses were limited by the different bus and tram routes crossing the square. Cultural events and free time activities
could not take place in a square whose main purpose was to serve as traffic junction.
The new proposal solves the problem with public transport and offers a new urbanism master plan for the Mendel square. The solution for the
transport junction is derived from the city plan of the old part of Brno.
The current traffic solution uses one wide road crossing Mendel square for both directions. Consequently, the road takes the strain of a heavy
volume of traffic. Conversely, the new proposal separates the different directions to individual roads on the west and east sides of the Mendel square.
The new city is supposed to grow up in an area where there was a large factory. However, in the new proposal this area is destined to shops,
offices, hotels and entertainment facilities. It is remarkable to highlight that the height regulation allows building up higher edifices in the new part of
the city. The new proposal reduces the amount of traffic to a minimum. Thus, pedestrian areas are made primary and a public garden is included in order to
give priority to leisure activities.
city Brno
PDF Created with deskPDF PDF W
riter - Trial :: http://www.docudesk.com
874/1
874/10874/11874/12874/13874/14874/15874/16874/17874/18874/19874/20874/21874/22874/23
768
769 767/1
878/1
878/2878/3
192/2
764/1
764/2 763765
766
922/1922/2
923
924
925
926
927928
929
930
931932
933
934
935936
937/1937/2
938
939
874/36874/33874/37874/38874/39874/31874/32874/40
767/2
701
725
726727728
729 730
731 732
733 734
735 736
737 738
739740
741742/1 742/2
743/2
743/3
743/4743/5
746/1
747
748749
750
751
752
753
754
755
756
757/1
757/2
757/3
757/4
757/5
757/6 757/7757/8
757/9757/10757/11
758
759/1
760
761762
744743/1
757/12
759/2
746/2
940
941
942
943/1944
943/2
945
946
947
948
949 950
951
952953
954
955956/1
957
958959
960
961 962/1
962/2962/3
963
964 965
966
967/1
967/2967/3
968
969
970
971/1972
973
974
975976
977
978/1979
981
982
983984
985
684/2971/3956/2
971/2
978/2980
901
686 685
640/13687/1
688/1688/2688/3
688/4688/5689
690
691
692
693/1
694695696
697/1
698
699
700
703/1702
703/2
703/3
703/4704 705706 707708709
710/1711/2712713 714715 716 717
718719
720721
722723/1724
693/3
693/2
687/2
697/3
710/2711/1
723/2697/2
660
661/1661/2
666/1666/2666/3
667
668
669670 671/1
672
673
674
675
676/1677
679
681
682
683
676/2
671/2
666/4
424
425
426
427
428/1
430
431
640/2
640/3
640/4
640/5
640/6
420/3
420/4
420/1
420/2
428/2
429
418421
432/1432/2
640/7
412413/1
419/1419/2 413/2
414zakl.skola
Polni
Kamenna
Kamenna
L.Konecne
Taborskeho nabrezi
Kamenna
Videnska
Svratka
Svratk
a
Svratka
Kamenna
Taborskeho nabrezi
Kame
nna
nemocnice
kostel sv.Leopolda
klaster milosrdnych bratri210
1382/1
1428/6
1428/7
1448/1
1523
1524
1525
1527/2
1527/3
1527/4
1528
1529/1
1529/2
1531
1532
1533
1544
1546
1547/1
1548/1
1549
1550
1558
1547/2
1547/3
1547/4
1548/2
1526/2
1739
1740/1
1741
1742
1743
1740/21740/3
1740/4
1744/11744/2
1589
1590
1591
1592
1593/3
1594/3
1595/1
1595/21595/31595/4
1596/1
1596/2
1596/3
1596/4
1598/1
1598/2
1626
1627
1628
1629/11629/2
1630
1631
1632
1633
1634
1635
1636
1637
1638
1639
1640
1641
1642
1643
1644
1645
1646/1
1596/5
1595/5
1595/6
1593/1
1594/1
1593/5
1646/2
1595/7
1734
1735/1
1735/2
1737
1759
1760
1765
1735/3
1736/7
1736/6
1736/8
1736/5
1736/9
1736/4
1736/3
1736/10
1736/1
1736/2
1736/11
1736/12
599
601
640
642
643/1
643/2 643/3
644
645
646/1
646/2
647
648 649
650
600/1
600/2
651
652
653
654
678
679/1
679/2
680
681
682
683
686
687
688
689
755
756/1757
758
759
760
761
756/2
813/1
934/1
934/2
935/2
936/2 937/2
938
939940
941
942/2
943
1717/2
1717/1
1718
1719/1
1720/2
1721
1723
1724/1 1725
1726
1727
1728
1730
1729
1731/2
1732
1733
942/1
942/3
942/4
942/5
942/6
1719/2
1720/1
1720/5
1720/4
1720/3
1722/2
1722/1
1722/3
1722/4
1722/5
1722/61722/7
1724/2
1731/1
813/2
813/3
813/4
813/5
814
815816
817/1817/2
817/6
818
819
821
824/1
825
826/2
826/3
826/4
827
902/1
902/2
902/3
902/4
902/5
902/6
902/7
902/8
902/9
902/10
902/11
902/12
902/13
902/14
902/15
902/16
902/17
902/18
902/19
902/20
902/21
902/22
902/23
933
817/7
817/8817/3817/9
824/2
845/1
845/2
846
847
848
849/1
849/2
849/10
849/11
849/12
849/13
849/14
849/15
849/16
849/17
849/18
849/19
850/1
850/2
851
854
763
764
765
766
767
768/1
768/2
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786/1
786/2
787
788
789
790
911
762
809/3
809/4
809/6
811/2811/1
813/6 813/7
945/2
945/1946/2
806/1
805
808
812
809/1
809/5
946/1
947
948
949
950
951
952/1
953/1
954/3
954/1
954/2954/4
955
806/2
952/2
952/3
953/2
954/5
954/6
954/9
954/10
954/7
954/8
954/11
954/12
946/3
946/4
754
751/3
751/4
751/6
751/7
791
792/1792/2
792/3
793794
795796
798/1
798/2
799
800
801
802
803
804/1
804/2
810
833/1
833/2
834
835/2
835/1
836/1
836/2
837/1
837/2
837/3
837/4
837/5
837/6
837/7
837/8
837/9
838
840
841
842
844
826/1
828
829
830
831/1831/2
831/3
832843
839/1
839/2
839/3
839/4
839/5
871/1
871/2
872
877/1
877/2
878/1
879/1
879/2
879/3 879/4879/5 879/6
880
881
882
883
884886
885
887/1
887/2
887/3
888
889/1
889/2
890
891
892
893
889/3
875/1
875/3
876/1
876/8
876/9
876/2
876/7
876/3
878/2
894
895
896/1
897
898/1
900/15
896/2
896/4
899/3
900/5
900/9
900/8
900/11
900/7
900/2
900/1
900/3
900/4
900/16
900/14
901/4
901/2
901/3
901/1
901/6
901/8
900/19
900/20
901/7
904
905/1
905/2
905/3
905/4
906/1
906/2
907
908/1
908/2
909/1
910/1
910/2
911
912
913
914/2
914/3
906/3
914/1914/4916/4
905/5
909/2
908/3
920
922
923
924
925
926
927
928/1
929/1
930/1
931
932
928/2
929/2
930/2
1409
1413
1418/1
1419/1
1419/2
1419/3
1419/4
944
956
957
1757/1
1757/2
1757/3
1761
1762
1764
1755
1756
1758
1685
1686
1687
1688
1689
1690
1691
1692/1
1693
1694
1695
1698
1696
1697/1
1699
1692/2
1692/3
1700
1697/2
1647
1648
1649
1650
1651
1652
1653
1654
1655
1656
1657
1658
1659
1660/1
1661
1662
1663
1664
1665
1666
1667
1668
1669
1670
1671
1672
1673
1675/1
1675/2
1676
1680/1
1681/2
1681/1
1682
1683
1684
1660/4
1660/5
1680/2
1677
1678
1701
1702/1
1702/2
1703
1704
1705
1706
1707
1708
1709
1710
1711 1712
1713
1714
1715
1716
1095/11095/3
1096/1
1096/2
1097
1098
1100
1101
1102
1103
11041105
1106
1107
1108 1109
1110
1111
1116
1095/8
1095/11
1095/12
1095/13
1095/14
1096/3
1096/4
1096/5
1099
1745
1746/1
1746/2
1752/1
1752/2
1754
1752/3
1581
1580
1579
1578
1577
1576
1575
1574
1573
1572
1571/1
1570
1569
1568
1567
1566/1
1565
1564
1563
1562/1
1561
1560
1559
1557
1556
1555
1554
1553
1552
1551
1582
1583
1584
1585
1586
1587
1588
1566/21566/3
1566/4
1566/5
1571/2
1562/2
1456
1599
1600
1601
1602/1
1603
1604
1605
1606
1607/1
1608
1611
1612
1613
1614
1615
1616
1617
1618/1
1618/2
1618/3
1618/4
1619/1
1620
1621
1622/1
1623
1624
1625
1619/2
1619/31602/2
1609/21609/3
1607/2
1607/3
1609/1
1609/4
1609/5
1610/1
1610/21610/3
1610/4
1610/5
1610/6
1610/7
1619/4
1619/5
1619/6
1619/71619/8
1619/9
1622/21622/3
restaurace
Vaclavska
Hybesova
Hybesova
Annenska
Leitnerova
posta
Kridlovicka
Kridlovicka
Kridlovicka
Kridlovicka
Ypsilantiho
Krizova
Krizova
Nadvorni
Naplavka
Vystav
ni
Zednikova Rybarska
Belidl
a
Porici
Porici
Porici
Veletrzni
Rybarska
Rybarska
Rybarska
Veletrzni
Veletr
zni
Vystav
ni
Hlinky
Hlinky
Hlinky
Mendlovo nam.
Mendlovo nam.
Vaclavska
Kridlovicka
Naplavka
Nadvorni
Porici
Porici
Porici
Krizova
hala RONDO
Mendlo
vo nam
.
Zahradnicka
Mendlovo nam.
Fakultni nemocnice u sv.Anny
mat.skola
zakladni skola
OLD CITY BRNOANALYSISheliport
tram
bus
trolleybus
COMPLETED BLOCKS PUBLIC SPACE FUNCTIONS
PUBLIC TRANSPORT
IMPORTANT PARTS GREEN PARTS
NOISE ANALYSIS
HEIGHT ANALYSIS HISTORICAL MAP 1922
HISTORICAL MAP 1815
HISTORICAL MAP 1400
1
2
2
3
45
6
7
8
12345678
_exhibition center_brewery_monastery, cathedral_hospital_Mendel square_parcels of previous factory_production facilities, shops_river Svratka
Ke spracovnn urbanistickho nvrhu tak problemtatick casti jako je star cast mesta Brno bylo nutnspracovat a obstarat si analyzy jednotlivych aspektu vstupujicich do usporadani hmot a komplexnho fungovntto casti Brna. Dve oblasti se ve stare casti vyzadovali zvysenou pozornost pri jejich reseni. Jednim byla oblast Mendlovanamesti, kterou bylo nutne resit ve dvou rovinach - urbanisticke usporadani v souladu s dopravnim resenim.Druhou casti byla oblast byvaleho tovarniho arealu nabizejici moznost rustu moderniho centra ve stare castimesta Brna. Dulezitym faktorem ovlivnujici cele reseni bylo dopravnim reseni protoze oblast Mendlova namesti tvoriladulezity dopravni uzel.
c. e. 359
c. e. 360
c.e. 363
c. e.3 65
c. e. 368
c.e .373
c.e. 375
c. e.70 4
c.e .377
c.e .38 2
c. e. 393
c. e.40 8
c.e. 409
c. e.4 12
c. e.4 17
c. e. 418
c.e. 419
c.e. 864
c.e. 865
c. e. 911
c.e. 932
c.e. 938
c.e. 939
c.e .942
c.e .943
c. e. 956
c.e. 1
c. e.3
c. e.5
c.e. 7
c. e.8
c. e. 11
c.e .12
c. e. 18
c.e. 19
c. e.20
c. e. 22
c. e.23
c. e.24
c. e. 27c. e. 30
c. e.30
c.e. 31
c. e. 33
c. e.3 5
c. e. 38
c. e. 40
c. e.4 1
c.e .44
c.e. 45
c. e.4 7
c.e .49
c.e. 50
c. e. 53
c. e. 56
c.e .62
c.e. 63
c. e.6 7
c.e. 67
c.e .72
c. e. 75
c.e .76
c.e. 77
c. e. 78
c.e .79
c.e .80c.e .83
c. e.8 4
c. e. 86
c.e. 87
c.e. 93
c. e.9 8
c. e.1 03
c.e. 115
c.e .116
c. e. 122c. e. 124
c. e. 124
c. e. 125
c. e. 128
c. e. 131
c.e .132
c.e. 135
c.e. 136
c. e. 140
c.e. 142c.e. 147
c. e. 147c. e. 148
c. e.1 48c. e.1 50
c.e. 150c.e. 152
c. e. 152
c.e. 154
c. e. 156
c. e. 164
c. e. 168
c.e .169
c. e.17 0
c.e .171
c.e. 173
c. e. 174
c.e. 177
c. e. 178
c. e. 179
c. e. 181
c.e .185
c. e.1 92
c. e.1 94c. e.1 95
c. e.1 95c. e.1 96
c. e. 196c.e .199
c.e. 206
c. e.2 07
c. e.2 09
c. e.21 0
c.e. 212
c. e. 213
c.e. 214c. e.21 5
c.e. 222
c.e .223
c.e .230
c. e.23 4c. e.23 6
c. e. 236
c. e. 237c. e. 238
c.e .238
c. e. 240
c. e. 241
c. e. 248
c. e. 250
c. e.2 51c. e.2 52
c.e. 252
c.e .256
c. e. 254
c. e.25 5
c. e. 263
c. e.27 2
c. e.27 5
c.e .27 6c. e.27 8c. e. 279
c. e. 280c. e.28 2
c. e. 285
c. e. 287c. e.28 8c.e. 290
c.e. 295
c.e. 297c. e.3 01
c.e. 311
c.e. 315
c.e .316
c. e. 317
c. e.33 2
c. e.33 4
c.e .336
c. e. 338
c. e.34 6
c.e. 352
c. e. 354
c.e. 357
ORIGINAL STRUCTURE OF BLOCKS
exhi
biti
on c
ente
r
rive
r Svr
atka
villa
Mis
trov
skyc
h
hotel
offic
e, s
hop,
en
tertai
nmen
tp
arki
ng h
ouse
media
teca
bre
wer
y
mona
stery
shop
ping c
enter
shop
ping c
enter
spa
sport
cente
r
office
exte
nsio
n of
hos
pita
l
cathe
dral
GA
LER
Y- o
rigin
ally
fact
ory
PROPOSAL OF STRUCTURE OF BLOCKS
ELEVATION STRUCTURE
PROPOSAL FOR TROLLEYBUS
current roadsproposed roads
current tracks
proposed tracks
proposed buildingsproposed buildings
current brewery and cathedral
current buildings
urbanism proposal
old city BrnoMENDEL SQUARE
The new design of the Mendel square solves the problem with traffic and offers a new urbanism conception. The traffic flow of cars is reorganized in
two individual roads situated at the east and west sides of the square. A tunnel placed at the west side of the square connects it (the square) with the upper
part of the Uvoz Street. The public transport services are centralized in the south part of the square. Therefore, the north part of the square remains free
for pedestrians and this makes possible the reorganization of the urbanism structure. The new urbanism structure allows the creation of three new squares
surrounded by new buildings that insulate the square from the traffic noise of the nearby roads. Besides, two of these squares are also surrounded by
some historical buildings that improve the aesthetics of the square.
proposal of vacant lot
Mendel squareKRIZOVA STREET
The complicated situation of the vacant lot at Krizova Street made from the design of the place a sort of challenge for the architect. On the one hand,
the traffic of the street is quite heavy. On the other hand, the street is connected with a series of streets that make the reorganization of the urbanism a bit
difficult. Besides, we should take into account the presence of private parcels and houses that could not be rearranged and the existence of an entrance
to a private yard inside a block of flats.
The changes made by my proposal are in accordance with the surrounding buildings. The project respects the proportions of the existing buildings,
but for their construction modern materials and technology are used. The vacant lot was divided into four different parts in order to avoid the monotony of
a single huge house and to respect the disposition of the adjacent buildings. Each of the four parts is appointed to fulfil a specific function in accordance
with its position in relation to the Mendel Square. Thus, some office buildings and a hotel are placed next to the Mendel Square. Modern materials that fit
with the function of the buildings are used. In opposition to these service buildings, I have design a number of blocks of flats that are situated in a distant
position from the square. Traditional materials were used in order to decrease the price of these blocks of flats. Each of the blocks of flats includes a shop
or a restaurant in the ground floor. They also provide a solution for the problem existing with the entrance to the yard.
Inside the block there is designed a block of flats with better privacy. Glassed-in walls were designed in order to get in more sunlight. The ground floor
is not used for flats, but it is a free open space. The next floors are supported by columns; this design allows us to use to use ground floor for leisure
activities and it works as a shelter in case of rain. The garages are designed with a lift system and without long ramps
parterrefunctions
possible development of blockfunction scheme
office
hotel
flatdevelopment of houseinside the block
vertical way
vertical way
view from hotel's restaurant distribution food in hotel
transport food by lifts tosixth floor with restaurant
New urbanism proposeadjusted Krizova street as apedestrin zone. Only publictransport is allowed there. The vacant lot was dividedinto four different parts in orderto avoid the monotony of asingle huge house and torespect the proportion of theadjacent buildings. Theproportion used for the partshelps integrate new hi-techfacades into historical buildings. Each of the part includesspecific function. A allocation ofthe functions is made accordingwith profitability of the parts. Theparts near to Mendel squarecontain a office building andhotel. A further parts containblocks of flats. Facades were designaccording with the function ofthe building. Each function hasdifferent aesthetic andtechnological criteria. The officebuilding and hotel have facadefrom modern materials andtechnologies suitable to theirfunction. The blocks of flats usetraditional, cheaper materialsand technologies in order to beprofitable.
view inside the courtyard
new block of flats in courtyard
section of block flats section of hotel
section of block flats
elevation from Krizova street
design, landscape architecture
KromerizFLORAL GARDEN
The gardens of Kromeriz are declared patrimony of the humanity by the UNESCO. The landscaped area is divided into two different parts: a baroque
garden known as the Floral Garden and a large manor house garden used liked a landscape park during the th c. The North-eastern part of the Floral
Garden was strongly damaged during the last century and the intention of this project is to find a solution to solve the deterioration of the garden.
It is important to bear in mind that for the reconstruction of the gardens the architect should take into account a series of circumstances. First of all, the
proposed changes should be in accordance with the character of the garden. Secondly, my intention was to create an area trough which the visitors could
walk around the garden. This area would offer a series of facilities for the access to the garden.
The proposal keeps the original geometrical subdivision of the Floral Garden. However, three sections have been divided into smaller parts also
following a geometrical pattern. The borders between the three sections are linked with the axes of the Floral Garden. Each of the sections has a
particular design in accordance with its specific function. Thus, the northern section offers a sort of gallery and floral exposition. The middle section is
occupied by a restaurant placed at a higher level than the water tank. The restaurant is surrounded by a line of trees which would offer shadow during
summer. The southern part contains several glasshouses.
In the project the original wall bordering wall of the garden has been removed in order to open the garden to the city. Instead of the wall, I have
decided to limit the garden from the street by creating a water area with two small bridges.
The proposal also includes the reconstruction of the central head-office building. Besides, a new center for garden and landscape architecture is
created. At the southwest part of the garden, new facilities buildings such as glasshouses and an aviary have been added. At this area of the garden a
labyrinth has been created in order to increase the beauty of the natural landscape.
master plan
plans of new design current building
plan of floral garden
sections and elevations of caffee
plan and section of galery
A.01.1 Diplomka 1.PDFA.01.1 Diplomka 1
A.01.3 Krizova 1.PDFA.01.3 Krizova 1
A.01.4 Krizova 2.PDFA.01.4 Krizova 2
A.01.2 Krizova 3.PDFA.01.2 Krizova 3