Planning & Delivering Safe Work
10 point plan overview
P&DSW
Planning & Delivering Safe Work
Simpler communications, Clearer responsibilities
Work Team
Manages Railway Operational Risk
Manages Worksite / Task Risk
APPR
OVE
/ IS
SUE
WO
RKPE
RMIT
S &
CER
TIFI
CATE
S
APPR
OVE
/ IS
SUE
RAIL
WAY
CERT
IFIC
ATES
TechnicalAuthorities
ProtectionTeam
Team Leader / Foreman
Route Control (Area Authority)
Signaller ECO
Safe Work Leader
► Creation of Safe Work Leader Role • Controlling mind for safety of task and
Worksite • Network Rail or Principle Contractor
employee • Responsible for Planning, Delivery &
Hand back
3 levels of SWL
•Level 1 - simple issue as possible ( e.g. patrollers) part time SWL (team leaders)
•Level 2 – empowering the SWL to design the safe work system – multi discipline sites (full time job) expected to come from a permanent way
•Level 3 – Bespoke to the job / task required. Different permits depending on task (bespoke appointment)
Simple Worksite – 1 SWL 1 work item
Protection ( if required )
SWL
Worksite
SWL appoints lookouts and takes line blockages directly with
Signaller if planned
Gang
Signaller
Pro
tect
ion
arra
ngem
ents
Multiple Worksites with one Protection Controller providing the
operational protection
Signaller
ProtectionController
(can be one of the
SWL’s )
gang gang gang
SWL SWL
Pro
tect
ion
arra
ngem
ents
Line Blockage
Worksite WorksiteWorksite
1 worksite with multiple sites of work
WORKSITE
PICOP
Safe Task
Leader
SWL
Blocking team-Protected
Worker or Safe Task Leader
appointed
Blocking team
Site of work 1 Site of work 3Site of work 2
gang
WS MB
WS MB
Agent
gang
Safe Task
Leader
gang
Safe Task
Leader
Signaller
Draft permit to work process
Now Day 1 of SWL implementation
Final
Protection Controller
Protection Controller
Protection Controller
COSS on open lines
Safe Work Leader (COSS)
Safe work Leader
ES Safe Work Leader (ES)
Safe Work Leader
COSS within worksite
Safe Task leader (COSS)
Safe Task Leader (STL)
Role and responsibilities changes
Proscient role
Proposed Role alignment Description
Label
Performing Authority
Planner/ Safe work Leader
PA
Verifying Authority
Safe Work Leader VA
Area Authority
Section Manager / Engineer
AA
Issuing Authority
Planner IA
Release Authority
A person with the competence to change the state of the permit to Live / Suspend / Amend / Job Complete & Incomplete
RA
Responsible Manager
Responsible Manager
RM
Planner Planner PL
Admin
Planning & Delivering Safe Work
Technology - ePermitting
10
ePermitting:
• A single hub for putting people to work safely
• Existing permits (e.g. permit to dig, confined space entry, electrical isolations etc.,) will not be part of the ‘Proscient’ permit system however it is proposed that they will be control points prior to the issue of the SWL permit.
• The system includes a visual map showing worksite and railway infrastructure
The RATs! • System is ICON and Prompt Driven
• System provides Improved Risk and Hazard controls management
• Differentiates Task risk and Operational Risk
• Grouped by Hazards e.g. Work on or near the line etc.,
• Proposed that all Tasks that take place on Network Rail line side infrastructure (fence to fence line incl.) will require a valid permit to work to be in place
• Modifiable by Safe Work leaders
• Cyclical templates will be available
• RAT Selection drives permit type
• Can be centrally updated / controlled so risk templates can be amended very quickly
Key Milestones LNE/EM & Scotland go-live = 31st October
LNW, Western & Wales go-live = 30th November
Wessex, South East go-live = 6th Jan 2015
Rule Book changes = Dec 2014
Proposed Training requirements for permit system
•Planner (Issuing Authority) – 3 days
•SWL (Performing Authority) – 4 days
•Responsible Manager (Area Authority) – 5 days