Mission:On order, 377th TSC deploys an Early Entry Command Post (EECP) within ninety-six hours to a designated contingency area within the USSOUTHCOM AOR, in support of CONPLAN 6120 or 6150, to provide Mission Command of assigned joint logistical forces, provide an initial assessment of requirements and an initial operational capability for sustainment in support of (ISO) Unified Land Operations (ULO).
EECP Mission
EECP Key Tasks:
1. Provide Manning Foundation for JTF
2. Be the Sustainment experts for USARSO:• Conduct initial Reception, Staging, and Onward movement (RSO) operations and establish accountability of DoD
personnel, equipment and materiel flowing into area of operations• Establish the initial theater distribution plan for the contingency operation• Establish asset visibility and maintain the Logistical Common Operating Picture (LCOP)• Conduct materiel and distribution management operations in support of Unified Land Operations (ULO)• Facilitate establishment of initial contracting support
3. Provide Mission Command of subordinate logistics units
4. Conduct operations with our Joint Interagency International Multi-national (JIIM) partners
(377th TSC + ARSOUTH)
377th TSC
MCP
JTF
SOUTHCOM
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
Plan - Link - Sustain
EECP Task Organization
EECP OICCOL Baginski
G1 PLANS OFF (x1)
CPT Stewart
G2 (x2)INTEL
SFC Sanderford SPC Collins
EECP NCOIC (x1)
SGM Bishop
OPS NCOIC(x1)
VACANT-NCO
Duty Status
AC/ AGR
24TPU
21TBD
6
CHOPS(x1)
LTC Garcia
G6 (x3)CW2 Harris
SSG PolehonkaSPC Smith
Surgeon OFF/ NCO (x2)
MAJ WhitmoreMSG Edwards
G4 (x2)SSG Lara
SSG Walton
SJA (x1)LTC
Beaverstock
PAO(x1)
LTC Perez
HHC Mechanic (x2)VACANT-NCO
VACANT
Total: 51 + 2 Linguists
EECP CDRBG Ives
Linguist(x2)
CA AFFAIRS NCO (x1)SGT Fox
CIVIL AFFAIRS OFF
(x1)CPT Kemna
LOGISTICS / CONTRACT
OFF (x1)MAJ Dunbar
MAT MGMT OFF/ NCO (S&S) (x2)
CPT WeissenfluhSFC Rousell
MOB TRANS/AIR
OFF (x1)MAJ Cheatham
MOB OFF/TRANS
(x1) CW2 Blackman
TRANS SEA/TERM
OFF/NCO (x2)VACANT-OFF
TRANS LAND OFF/NCO (x2)
MSG Denson
DMC/DIB CHIEF
(x1)LTC Hunt
JTF LNO (x1)VACANT
SUPPORT OPS
CL III (P) / WATER OFF / NCO (x2)
MAJ Martinez
MOV MNGT
CONTAINER MANAGER
(x1)SFC Dukes
LOGISTICS OPS NCO (x1)
SFC Beatty
310 HRSC (x4)LTC Blankenship
SGM CieutatCPT WrateeSFC Schmidt
SASMO/INFO SYS OP (x2)SFC PowellSPC Gore
SFC BogleMSG Mikell
BTL NCO (x2)MSG Ulmer
VACANT
BTL CPT (x2)
CPT Pacheco
CPOF OPERATOR
(x1)SPC Benjamin
469 FM (x2)1LT Ongondi
MSG Bowman
OPERATIONS
CHAPLAIN(x2)
LTC SpencerSSG Ruffin
SPC Davis
MAJ Gill
VACANT- NCO
VACANT- OFFVACANT- OFF
VACANT- OFF
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
3 Sep
DEPEX ROCDRILL
14 Sep(BA) Load plans
Commo SystemsTest and updated
EECP/DEPEX Milestones
EECP focused training
DEPEX12-17 NovNAS JRB
to Camp Shelby
Exercise alert roster
Pre stage equipment
Conduct rolloutIAW N hour sequence
Comms layout
and check
Deployment brief
Drivers TrainingFull time Personnel
4
11 Nov
IPR/WGCofS
4 Sep
22-24 Oct (BA)DEPEX
Rehearsal/SRP
IPR/WGROC Drill
Setup
11 Sep
EECP/ DEPEX
WG
Finalize load plans
COL Snead ARSOUTH
DCOEquipment layout
EECPCofS IPR
EECPCofS IPR
21 Oct EECP Set-up
DEPEXFinal IPR
EECP/DEPEX
WG
EECP/ DEPEX
WG
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
Plan - Link - Sustain
EECP TY14 Training
BA (MUTA 6: 18-20 Apr) Gunnery 4 – COA and Decision Brief
BA (MUTA 4: 11-12 May) Gunnery 5 –TSC Warm Start to CPX-S; SRP EECP Personnel; Individual TCERT Training
PANAMAX 14Road to Readiness FY14
Jul 13
Jan 14
BA (MUTA 6: 19-21 Jul) – Focus: SRP EECP Personnel; JHOC - 40 pax; Individual TSIRT Training; Equipment layout
BA (MUTA 4: 17-18 ) Strategic Enablers Briefing: DLA; DST Training and Air Load Training
BA (CANCELED) (MUTA 4: 19-20 Oct) ARSOUTH DCO COL Snead visit; DEPEX rehearsal; APAN and DCO Training; EECP Set-up; Final Load Validation
Aug 13
DEPEX - EECP deploys to Camp Shelby; Gunnery 1 - EECP/ MCP COMMEX w/ ARSOUTH (7 days AT 12-17 Nov) BA (MUTA 6: 15-17 Nov)
LCOP Development w/ SPO Leaders; JHOC 35 pax
Feb 14
USSOUTHCOM AOR Hurricane Season Ends
BA (MUTA 4: 14-15 Sep) DEPEX ROC Drill, Loan Plan Development; Palletizing Training
Mar 14
Apr 14
May 14
BA (MUTA 4: 14-15 Dec) ARSOUTH 101; SOUTHCOM J4/DLA LNO Visit; AOR Familiarization Brief; Individual TSIRT training
CPX w/ARSOUTH(EECP CTE)
USSOUTHCOM AOR Hurricane Season Starts
Jun 14
Sep 13
Oct 13
Nov 13
Dec 13BA (MUTA 4: 11-12 Jan) Gunnery 2 – Mission Analysis and Brief;
BA (MUTA 6: 21-23 Mar) Gunnery 3 – EECP/MCP STAFFEX
Aug 14
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
Plan - Link - Sustain CSJFTC Landing Strip
Base Support Installation CP Shelby, MS
EECP Set-up Site
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
Contact Number: xxxxxxxxxxxxxMission. The EECP deploys to Camp Shelby IOT validate load plan, establish communications with MCP, and conduct internal training.
CAMP SHELBY
OIC’s Intent. To deploy the EECP IOT validated equipment and load plan. We will utilize this exercise to practice our processes and procedures and identify and procure equipment shortages IOT maintain a deployable EECP. End State: Deployment Plan and Communications Equipment is validated and EECP personnel redeploy to Belle Chasse safely.
Supported METL. 55-9-4804: Conduct Deployment Activities; 55-9-4805: Conduct Pre-deployment Activities; 55-2-4801: Perform Deployment Alert Activities; 55-9-4873: Plan Deployment; 63-2-4007: Occupy Area of Operations; 63-2-4012: Setup a Unit Command Post; 63-2-4040: Provide Communications; 11-6-8021: Establish a Local Area Network
Key Tasks. T: Deploy Early Entry Command Post (EECP)P: To identify EECP equipment & personnel, prepare load plans, and deploy into Area of OperationsT: Setup Early Entry Command Post (EECP)P: To Setup EECP equipment and ensure that all equipment is operating properly under field conditions.T: Establish CommunicationsP: Validate our communications capabilities with MCP and identify the EECP shortfalls.
Concept of Operations. This exercise will be divided in four phases; I. Preparations and loading of EECP equipment: DST will have the lead & supported by EECP II. Movement to Camp Shelby: EECP will have the lead and supported by HHC. III. EECP Set-up/Training: EECP will have the lead and supported by HHCIV. Redeployment: EECP will have the lead and supported by HHC.
EECP TRAINING
EECP Location
ALT. EECP Location
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
EECP MOVEMENTEQUIPMENT DENSITY
HVAC
Additional Sections Requirements • G1 = 1 x tuff box• G2 = 2 x tuff boxes• G3 = No additional equipment• G4 = No additional equipment• G6 = 4 x cases + 2 x tuff boxes• SPO = pallet w/office supplies (chem. lights,
engineer tape, batteries, markers, paper, etc) • Surgeon = 1 x tuff box• SJA = No additional equipment• Chaplain = No additional equipment• 469th Finance = Safe• HRSC = No additional equipment
EECP Requirements • 1 X MTV• 3 X HMMWV’S• 1 X 15K GENERATOR• 2 X HVAC• 1 X ELAM w/ VSAT & SNAP• Tents: 1 x 600 Series w/floor (Dome) 1 x 200 Series w/floor (Conf Room) 2 x 100 Series w/floor (Entrance & EECP OIC) 4 x 300 Series w/floor (Sleeping Tents)
HVAC
Start Point: NAS JRB New OrleansEnd Point: Camp Shelby, MSDistance: 124 Miles
Driver: SPC CollinsTC: SFC SanderfordLOAD:
Driver: SPC Gore TC: SFC PowellLOAD:
Driver: SPC SmithTC: LTC GarciaPassenger: SGM BishopLOAD: COL Hunt
HQ 31-5/SN-BT107739BGLS
HQ 81/ SN675587 15KW GEN
HQ 82/ SN575609
HQ 83/ SN575297
EECP Equipment
ELAM 5
Driver: MSG UlmerTC: CPT PachecoLOAD:
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
EECP TRAINING TIMELINE
Aircraft and Trans Company Thursday/ 14 NOV
2013 Line Haul Friday/
15 NOV 2013Air Movement Friday/ 15 NOV
2013 Saturday/16 NOV 2013 Sunday/17 NOV 2013
Aircraft and Trucks Arrive 1200hrs
Formation 0600hrs Formation0530hrs
Setup 0530 Accountability Formation
Load Aircraft or Trucks 1400-1700hrs
Weapons Draw 0700hrs
POV/Weapons Draw 0530-0630hrs
Setup 0600-0700 BreakfastClear Barracks
Aircraft or Trucks Staged 1700hrs
Personnel Staged 0800hrs
Breakfast0630-0650
Setup All Equipment and Personnel Prepared to depart AO NLT 0745hrs
Wheels Up 0900hrs
Final Formation0700
NLT 1200hrs All Rolling Stock Uploaded, Hitched and Staged
EECP Equipment & Personnel Depart CP Shelby, MS 0800hrs
EECP Arrival 1230hrs
Load Buses0715
Desired Endstate for DEPEX reached between 1200hrs-1500hrs
EECP Equipment & Personnel Arrive at BC 1100hrs
Setup Begins 1300hrs Arrive Airfield0730 TOC and Sleep Tent Teardown begins
NLT 1200hrs
Wheels Up 0930hrs
All Vehicles and Equipment Loaded and prepared to Redeploy to BC
1700hrs
1st Chalk Arrives 1100hrs
Clear Airfield/CP Shelby, MS
Setup Begins 1200hrs
Move to Barracks1730hrs
Aircraft Departs CP Shelby 1200hrs
1800hrs Chow in the DFAC
Arrives at BC 1300hrs
2nd Chalk Departs BC 1130hrs
Arrives at CP Shelby 1600hrs
H Hour Seq. Begins upon arrival of 1st Chalk
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
NOVEMBER CALENDAR
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
Veterans DayEECP/MCP/DST Alert
- 100% Acct.- TPU/AC/AGR Rep. - Stage Equip/SRP- Begin POV Storage
- Equip. WT/Staged- Manditory Trng- Crosslevels- ISOPREP
- TRK & Aircraft Arrives- EECP Equip. Loaded- Personal Affairs- Vehicles Staged
- EECP Est.- EECP Commo - Equip Teardown- Equiip. Staged
- MCP Reports- MCP Ops Up- EECP SP- EECP Est.
- EECP Redeploy- EECP Conduct SRP- Recovery- 100% SI Inventory
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
TASKS
Task Lead Suspense
MHE Request EECP/DST
Lodging Request EECP/DST
EECP Drivers Lic. EECP/DST
Publish Packing List EECP/DST
Develop a Training Plan EECP/DST
Prepare Convoy Plan/Briefing/Risk Assessment
EECP/DST
Load Vehicles EECP/DST
Conduct EECP Risk Assessment EECP/DST
Coordinate Motor Pool Keys with HHC
EECP/DST
Coordinate Toll Tickets EECP/DST
Coordinate weapons draw with Supply Sergeant
EECP/DST
Prepare ELAM for movement EECP/DST
Prepare Convoy Briefing EECP/DST
Load CPOF Computer EECP/DST
Prepare and bring 310 HRSC briefing slides
EECP/DST
Task Lead Suspense
Conduct PMCS (dispatch vehicles and install radios on ( HQ 20 &
EECP/DST
Prepare and bring EECP Info Flow Review Briefing
EECP/DST
Prepare and bring Battle Drills Briefing
EECP/DST
Prepare and bring Concept of Support Briefing
EECP/DST
Load Concertina wire on HMMWVs EECP/DST
Prepare TPU Orders EECP/DST
Stage Vehicle EECP/DST
Bring Maps/Boards EECP/DST
Upload tuff boxes EECP/DST
EECP Set-up EECP/DST
Conduct Internal Training EECP/DST
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
SET-UP TEAMS
TOC Team
CPT Kemna, Robert Team OIC
MSG Denson, Darrell Team NCOIC
LTC Garcia, Jose
LTC Hunt, Gary
MAJ Dunbar, Gregory
SFC Sanderford, Christopher
MAJ Gill, Myles
SFC Rousell, Thomas
MSG Ullmer, Boyce
MSG Mikell, Eric
CPT Stewart, Susan
CPT Ongondi, Henry
SFC Beatty, Michael
CPT Pacheco, Alberto
SFC Bogle, Robert
Sleeping Tents
CPT Martinez, Raymond Team OIC
MSG Bowman, Tyrone Team NCOIC
MAJ Cheatham, Marcus
CPT Weissenfluh, Ingrid
LTC Beaverstock, Jeff
LTC Perez, Michael
LTC Spencer, James
SSG Lara, Ricardo
CPT Wratee, William
SSG Walton, Stanley
SSG Corbitt, Samantha
ELAM
CW2 Harris, Timothy Team OIC
SFC Powell, Terry Team NCOIC
CW2 Fisher, Paul
SSG Polehonka, Aaron
SPC Gore, Donald
SPC Smith, Lester
Security Team
CW3 Blackman, Alvin Team OIC
SFC Schmidt, Jennifer Team NCOIC
SSG Ruffin, Simone
SPC Collins, Brian
SPC Benjamin, Lance
SPC Davis, Elizabeth
MSG Edwards, Johnny Medic
NOT GOING ON DEPEX
MAJ Whitmore Medical Officer
SSG Fox
BG Ives, JonathanCOL Baginski, TheresaSGM Bishop, Jefferey L.
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
EECP Personnel
G1
CPT Stewart
G2
SFC Sanderford
SPC Collins
G3
LTC Garcia
MAJ Gill
MSG Ullmer
VACANT
VACANT
G4
SSG Lara
SSG Walton
G6
CW2 Harris
CW2 Fisher
SGT Polehonka
SPC Smith
Surgeon
MAJ Whitmore
MSG Edwards
469 FM
CPT Ongondi
MSG Bowman
SJA
MAJ Beaverstock
310 HRSC
LTC Blankenship-
Jones
SGM Cieutat
CPT Wratee
SFC Schmidt
SGT Corbitt
Chaplain
LTC Spencer
SSG Ruffin
HHC
SPC Davis
VACANT
SPO
COL Baginski
SGM Bishop
LTC Hunt
MAJ Cheatham
MAJ Dunbar
MAJ Martinez
CPT Kemna
CPT Pacheco
CPT Weissenfluh
CW3 Blackman
MSG Denson
MSG Mikell
SFC Beatty
SFC Bogle
SFC Dukes
SFC Powell
SFC Rousell
SSG Fox
SPC Benjamin
SPC Gore
VACANT
VACANT
VACANT
EECP CDR
BG Ives
PAO
LTC Perez
Soldiers in Red denotes not attending DEPEX
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
Plan - Link - Sustain
Plan - Link - Sustain
UNCLASSIFIED
UNCLASSIFIED
“Can Do!, Anytime, Anywhere!”
MAJ Gregory Dunbar, gregory.a.dunbar.mil@mail.mil x5625
Plan - Link - Sustain
OIC Work
Area
MC4
SAMS-E
TC-AIMS II
PBUSE
BFT Workstation
Finance
NIPR
VOIP
PRINTER
SIPR
PRINTER
BCS3
Ent
ry C
ontr
ol
Poi
nt
GU
AR
D
LEGEND
SJASURGCHAP PAO
MAINTG4G1 469 FM
LSD
HR
SC
HR
SC
JTF
LNO
VIP/Briefing
BTL CPT
LAN
D
OPS NCOIC OPERATOR
SE
A
DIB
/DM
C
CH
IEF
BTL N
CO
G2
CHOPS
TR
AN
S/A
IRM
OB
/ T
RA
NS
EECP NCO
IC
CA
CLIII/W
TR
VSATSNAPBGAN
Smart Tables
15K GEN
HVAC
EECP Layout