PIM Test DXB0372 Emirates Park Hotel Analysis and summery
- The process of testing start with Initial Full Sector test to determine the root cause of the PIM, For the site DXB0372,there are 3 sector altogether, we found several faulty Hybrid Coupler, faulty connections and jumps. The process of correction started with changing faulty component, and move on gradually to combiner testing, and diplexer testing, and so on till All DAS testing.
- The process of testing each sector involves numerous, and continuous testing, and retesting, of all sector stages. At this stage we will provide as much details as possible for all testing screen shots, we will make sure to confirm in clear screen shots successful pass of each sector components.
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 3
PIM Test DXB0372 Emirates Park HotelTesting layers
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 4
PIM Test MOP :
PIM≤-90dBm OK
Test the whole system from the
output port of BTS
Test the low jumper
PIM≤-90dBmChange the low jumper
Test the jumper+main feeder
PIM≤-90dBm
Test the low jumper+main
feeder+up jumper
PIM≤-90dBm
Test the low jumper+main
feeder+up jumper+antenna
PIM≤-90dBm
Connectors rectification
Change the up jumper
Change antenna
Yes
NO
Yes
NO
Yes
NO
Yes
NO
YesNO
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 5
Screen shots
LTE initial full sector RTF testing for sector 1
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 6
Screen shots
LTE initial full sector RTF testing for sector 2
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 7
Screen shots
LTE initial full sector RTF testing for sector 3
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 8
Screen shots
LTE DU DAS part RTF testing of sector 1 after rectifications
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 9
Screen shots
LTE DU DAS part RTF testing of sector 2 after rectifications
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 10
Screen shots
LTE DU DAS part RTF testing of sector 3 after rectifications
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 11
Screen shots
The DU DAS part PIM testing result of sector 1
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 12
Screen shots
The DU DAS part PIM testing result of sector 2
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 13
Screen shots
The DU DAS part PIM testing result of sector 3
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 14
Screen shots
LTE ETISALAT DAS part RTF testing from PORT1
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 15
Screen shots
LTE ETISALAT DAS part RTF testing from PORT2
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 16
Screen shots
LTE ETISALAT DAS part RTF testing from PORT3
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 17
Screen shots
LTE ETISALAT DAS part RTF testing from PORT4
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 18
Replaced component pic
Before After
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 19
Replaced component pic
Before After
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 20
Testing on site
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 21
Testing on site
Tapping point
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies
Page 22
BOQ needed
BOQ 1- Hybrid coupler quantity = 22- ½ Flexible connector quantity = 2 3- ½ Flexible cable quantity=1.5M
Resources needed
2 Technician Installation Kaelus PIM Analyzer Testing Tool Testing Engineer A additional Combiner type for confirmation Additional Diplexer Better quality jumpers
HUAWEI TECHNOLOGIES CO., LTD.
Huawei TechnologiesHuawei TechnologiesHuawei Technologies Replaced Equipments on site :
Page 23
As arrow shown in the left draft, for the site DXB0701,we total replaced 1 jumper, 2 Hybrid Coupler(HC).
diplexe
r
LTE BTS
diplexe
r
diplexe
r
diplexe
r
HC HC
2s
HC HC HC HC
DU and ETISALAT tapping point