Pictures of old and new Grit Chamber 2009 · 2012-10-18 · Moving line from Pre-Aeration tank that...

Post on 23-Jul-2020

0 views 0 download

Transcript of Pictures of old and new Grit Chamber 2009 · 2012-10-18 · Moving line from Pre-Aeration tank that...

Pictures of old and new Grit Chamber 2009

Grit Auger

Auger Motor and shaft

Old Clarifier Drive March 2010

Set up for removal of bridge

Moving line from Pre-Aeration tank that discharged into Primary Effluent to the Primary Influent

New pre-aeration tank discharge

Intermediate Tank Rehab 2009

Intermediate Tank Rehab 2009

Removal of old Alum tank 2010

Removal of old Alum tank 2010

Removal of old Alum tank 2010

Air line before and after painting 2009

Air line before and after painting 2009

Concrete around plant

Catwalk over old concrete

Concrete around plant

Concrete around plant

Catwalk to # 3 digester 2011

Catwalk to get around return line 2011

Final clarifier rehab 2010

Final clarifier rehab 2010

Final clarifier rehab 2010

Northwest Lift station 2010

Northwest lift station 2010

Northwest lift station 2010

Northwest lift station 2010

Conference room old and new 2011

Conference room new 2012

Conference room new 2012

Conference room new 2012

Construction of new lab 2011

Construction of new lab 2011

Construction of new lab 2012

New Lab construction 2012

New Lab construction 2012

New Lab construction 2012

Removal of old lab trailer 2012

Removal of old lab trailer 2012

Removal of old lab trailer 2012

Area to grit chamber 2012

Stairs to grit chamber 2012

Area to Nitrification Towers 2012

Sidewalk to Nitrification Towers 2012