Post on 14-Jun-2020
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26377
RESOLVED That the Design Commission, having considered designs for the installation of
retail signage, 8509 5th Avenue, between 85th Street and 86th Street, Brooklyn, submitted by
the Department of Citywide Administrative Services and the Department of Transportation,
represented by exhibits 7334-A, B, C & D of record in this matter, hereby gives to the same
unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26378
RESOLVED That the Design Commission, having considered a proposal for the installation of
Along Woodhaven Boulevard by Priscila de Carvalho, Woodhaven Boulevard at the intersection
of 101st Avenue and Rockaway Boulevard, Queens, submitted by the Department of Cultural
Affairs' Percent for Art Program and the Department of Transportation, represented by exhibits
7328-A, B, C & D of record in this matter, hereby gives to the same unanimous conceptual
approval with the understanding that, when this project returns for preliminary review, the
submission should include elevations showing the layout of art and non-art panels in relation to
the locations of ticket machines, benches, bus shelters and any other streetscape elements.
Conceptual approval is conditioned upon submission of this project for preliminary review and
approval before November 13, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26379
RESOLVED That the Design Commission, having considered a proposal for the installation of
Woodhaven in Motion by Robert Hickman, Woodhaven Boulevard at the intersection of
Jamaica Avenue and 91st Street, Queens, submitted by the Department of Cultural Affairs'
Percent for Art Program and the Department of Transportation, represented by exhibits 7328-
E, F, G & H of record in this matter, hereby gives to the same unanimous conceptual approval
with the understanding that, when this project returns for preliminary review, the submission
should include elevations showing the layout of art and non-art panels in relation to the
locations of ticket machines, benches, bus shelters and any other streetscape elements.
Conceptual approval is conditioned upon submission of this project for preliminary review and
approval before November 13, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26380
RESOLVED That the Design Commission, having considered designs for the construction of
streetscape improvements, Hart Place, West 16th Street, Surf Avenue, Mermaid Avenue, and
Neptune Avenue, Coney Island, Brooklyn, submitted by the Department of Design and
Construction and the Department of Transportation, represented by exhibits 1170-KP, KQ &
KR of record in this matter, hereby gives to the same unanimous preliminary and final approval
with the understanding that DOT will return with a proposal for a bike lane following a traffic
study.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26381
RESOLVED That the Design Commission, having considered designs for the installation of
windows, Old Administration Building, Newtown Creek Water Pollution Control Plant, 329
Greenpoint Avenue, Greenpoint Avenue between Humboldt Street and Russell Street,
Brooklyn, submitted by the Department of Environmental Protection, represented by exhibits
2421-FV, FW, FX & FY of record in this matter, hereby gives to the same unanimous
preliminary and final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26382
RESOLVED That the Design Commission, having considered designs for the construction of a
covered artificial turf field and comfort station (FC Harlem), adjacent to the North River
Wastewater Treatment Plant and Riverbank State Park, West 145th Street and the Henry
Hudson Parkway, Manhattan, submitted by the Department of Environmental Protection,
represented by exhibits 3534-CB, CC, CD & CE of record in this matter, hereby gives to the
same unanimous final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26383
RESOLVED That the Design Commission, having considered designs for the construction of an
academic building, 28th Street between Seventh Avenue and Eighth Avenue, Fashion Institute
of Technology, Manhattan, submitted by the Department of Education and the Fashion
Institute of Technology, represented by exhibits 3126-CG, CH & CI of record in this matter,
hereby gives to the same unanimous final approval. Commissioner Nielsen recused herself.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26384
RESOLVED That the Design Commission, having considered designs for the installation of a
short range charging mast as part of a pilot of an electric bus program (“All Electric Bus”), East
41st Street at the 1st Avenue Viaduct, Manhattan, submitted by the Department of
Transportation, represented by exhibits 2762-R, S, T, U & V of record in this matter, hereby
gives to the same unanimous final approval with the understanding that (1) the designer will
closely oversee the fabrication of the mast to ensure all elements match the approved
drawings and notify the Public Design Commission if any changes are required; (2) a design
will be developed for all of the system-wide mechanical enclosures, consistent with the
enclosures approved for the Williamsburg Bridge Plaza; (3) the enclosure design will be
developed to allow for modification in the future, when smaller equipment becomes available;
and (4) DOT will submit revised proposals for the short and long range masts and the
enclosures prior to full deployment of the electric bus program. Approval is also given with the
recommendation that the mast graphics only utilize colors that are in the MTA standard palette,
in the event that the branding of the electric buses changes.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26385
RESOLVED That the Design Commission, having considered designs for the construction of a
prototypical comfort station and adjacent site work, Scarangella Park, West 13th Street,
Avenue U, Avenue V, and Stillwell Avenue, Brooklyn, submitted by the Department of Parks &
Recreation, represented by exhibits 1911-Q, R & S of record in this matter, hereby gives to the
same unanimous preliminary approval with the understanding that, prior to final review, DPR
will submit (1) a list of maintainable glazed brick colors for comfort stations and (2) alternative
colors within this palette for this comfort station.
Preliminary approval is conditioned upon submission of this project for final review and
approval before November 13, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26386
RESOLVED That the Design Commission, having considered designs for the reconstruction of
a plaza, performance space, pathways, and adjacent site work as Phase II of the
reconstruction of St. Mary's Park, St. Ann’s Avenue, East 149th Street, Jackson Avenue, and
St. Mary’s Street, Bronx, submitted by the Department of Parks & Recreation, represented by
exhibits 2169-DJ, DK & DL of record in this matter, hereby gives to the same unanimous
preliminary approval with the understanding that, before this project returns for final review, a
prosal will be submitted with the following revisions: (1) at the performance space, (a) the
orientation of the stage will be restudied so that it is parallel to the seating and (b) the ramps
will be redesigned so that railings are not required; (2) the dark paving materials will be revised
to a lighter color; (3) the park-side fence at the recreation center parking lot will be lowered;
and (4) Black Walnut will be removed from the plant list.
Preliminary approval is conditioned upon submission of this project for final review and
approval before November 13, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26387
RESOLVED That the Design Commission, having considered designs for the reconstruction of
ballfields, a dog run, and promenade as Phase I of the reconstruction of St. Mary's Park,
Jackson Avenue and East 143rd Street, Bronx, submitted by the Department of Parks &
Recreation, represented by exhibits 2169-DM, DN, DO & DP of record in this matter, hereby
gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26388
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the Children's Playground, Carl Schurz Park, East End Avenue between East 84th Street and
East 86th Street, Manhattan, submitted by the Department of Parks & Recreation, represented
by exhibits 1351-BU, BV & BW of record in this matter, hereby gives to the same unanimous
preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before November 13, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26389
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the tot lot, Travers Park, 34th Avenue between 77th Street and 78th Street, Jackson Heights,
Queens, submitted by the Department of Parks & Recreation, represented by exhibits 6493-X,
Y & Z of record in this matter, hereby gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before November 13, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26390
RESOLVED That the Design Commission, having considered designs for the construction of a
composting facility and adjacent site work, Lower East Side Ecology Center, East River Park,
Jackson Street, Cherry Street, and the FDR Drive, Manhattan, submitted by the Department of
Parks & Recreation, represented by exhibits 2144-CO, CP & CQ of record in this matter,
hereby gives to the same unanimous final approval. The Commission notes that coordination
with the Eastside Coastal Resiliency project is critical to providing a seamless park experience
and that DPR should be sure to address all adjacencies around this area, as grade changes will
affect plantings and the stored compost. Per standard procedure, if any revisions to the project
are necessary, DPR should notify the Commission immediately.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26391
RESOLVED That the Design Commission, having considered designs for the construction of an
ADA ramp and canopy, Yankee Stadium, 1 East 161st Street, Bronx, submitted by the
Department of Parks & Recreation, represented by exhibits 4052-EL & EM of record in this
matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26392
RESOLVED That the Design Commission, having considered designs for the construction of an
adult fitness area and adjacent site work, Colucci Park, Hutchinson River Parkway between
Wilkinson Avenue and East 196th Street, Bronx, submitted by the Department of Parks &
Recreation, represented by exhibits 7315-D, E & F of record in this matter, hereby gives to the
same unanimous final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26393
RESOLVED That the Design Commission, having considered designs for the reconstruction of
a playground and athletic courts, Richman Park (formerly Echo Park), East Tremont Avenue,
Valentine Avenue, and East Burnside Avenue, Bronx, submitted by the Department of Parks &
Recreation, represented by exhibits 5317-G, H, I & J of record in this matter, hereby gives to
the same unanimous final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26394
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Audubon Playground, including a comfort station, adjacent to P.S. 128, Audubon Avenue
between West 170th Street and West 169th Street, Manhattan, submitted by the Department
of Parks & Recreation, represented by exhibits 3450-F, G, H, I & J of record in this matter,
hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26395
RESOLVED That the Design Commission, having considered designs for the reconstruction of
basketball courts and a skate park, Rudd Playground, Bushwick Avenue and Aberdeen Street,
Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 1953-K,
L, M & N of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26396
RESOLVED That the Design Commission, having considered designs for the reconstruction of
basketball courts and construction of a skate park as Phase I of the reconstruction of Betsy
Head Park, Blake Avenue, Bristol Street, Dumont Avenue, and Thomas S. Boyland Street,
Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 781-
CZ, DA, DB & DC of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26397
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Playground 134, East 133rd Street between St. Ann’s Place and Cypress Avenue, Bronx,
submitted by the Department of Parks & Recreation, represented by exhibits 2559-P, Q, R & S
of record in this matter, hereby gives to the same unanimous final approval with the
understanding that DOT will include two crosswalks near the playground when the bike lane is
installed.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26398
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Playground 174 (formerly Bronx River Houses Playground), East 174th Street between Ward
Avenue and Manor Avenue, Bronx, submitted by the Department of Parks & Recreation,
represented by exhibits 4896-M, N, O & P of record in this matter, hereby gives to the same
unanimous final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26399
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the West 181st Street Pedestrian Bridge over the Amtrak rail lines as Phase ID of the
reconstruction of Riverside Park north of West 135th Street, Fort Washington Park, and Inwood
Hill Park west of the Amtrak rail lines, Manhattan, submitted by the Department of Parks &
Recreation and the Department of Transportation, represented by exhibits 741-DA & DB of
record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26400
RESOLVED That the Design Commission, having considered designs for the reconstruction of
an education center, Queens Zoo, 55-51 111th Street, Flushing Meadows Corona Park,
Corona, Queens, submitted by the Department of Parks & Recreation and the Wildlife
Conservation Society, represented by exhibits 2103-AND, ADO, ADP & ADQ of record in this
matter, hereby gives to the same unanimous preliminary approval with the understanding that,
prior to returning for final approval, the team will submit: (1) a sample of the shake roof to
understand the texture and color; (2) alternative shades of red HardiePlank siding, noting that a
lighter shade of red is preferred to the ‘Country Lane Red’; and (3) photographs of the existing
barn siding with the proposed HardiePlank colors held up to it for comparison.
Preliminary approval is conditioned upon submission of this project for final review and
approval before November 13, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26401
RESOLVED That the Design Commission, having considered designs for the construction of a
garage, Brooklyn Community District 3, 559 Park Avenue, Brooklyn, submitted by the
Department of Sanitation, represented by exhibits 7277-F & G of record in this matter, hereby
gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before November 13, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26402
RESOLVED That the Design Commission, having considered designs for the installation of
antennas, Pier 6, 20 South Street, Manhattan, submitted by the Economic Development
Corporation, represented by exhibits 2549-AI, AJ, AK & AL of record in this matter, hereby
gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26403
RESOLVED That the Design Commission, having considered designs for the construction of a
residential and retail tower as Phase III of the construction of CityPoint, Gold Street,
Willoughby Street, Flatbush Avenue, Fleet Street, and Albee Square, Brooklyn, submitted by
the Economic Development Corporation, represented by exhibits 5587-IG, IH, II & IJ of record
in this matter, hereby gives to the same unanimous final approval with the understanding that
the streetscape improvements will be submitted separately. Commissioner Nielsen recused
herself.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26404
RESOLVED That the Design Commission, having considered designs for the rehabilitation of
Engine Company 227, including the installation of vents and rooftop photovoltaic panels, 423
Ralph Avenue, Brooklyn, submitted by the Fire Department, represented by exhibits 232-H, I, J
& K of record in this matter, hereby gives to the same unanimous preliminary and final
approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Ethel Sheffer, Mary Valverde, Commissioners
November 13, 2017
CERTIFICATE 26405
RESOLVED That the Design Commission, having considered designs for the installation of
rooftop mechanical equipment, 45th Precinct Police Station, 2877 Barkley Avenue, Bronx,
submitted by the New York City Police Department, represented by exhibits 898-AE, AF, AG &
AH of record in this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before November 13, 2019 and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on November 13, 2017.
Justin Garrett Moore
Executive Director