PHED SIVASAGAR DIVISION

Public Health Engineering Department, the Nodal Department of implementation of Water Supply and Sanitation programme in the rural area has been rendering very sincere service in the district since its inception i.e 1979 when the Sivasagar PHE Division was created. Sivsagar PHE Division carries out aforementioned activities in rural areas of the District thorough -

Two centrally sponsored flagship programmes namely

(i) NRDWP (National Rural Drinking Water Programme) and

(ii) Swachh Bharat Mission(Gramin) {SBM (G)}

Externally Aided Programme like World Bank aided project.

Water Supply :

National Rural Drinking Water Programme (NRDWP)

The National Rural Drinking Water Programme (NRDWP) is a centrally sponsored Scheme aimed at providing every person in rural India with adequate safe water for drinking, cooking and other domestic needs on a sustainable basis by pipe water supply scheme (PWSS) and spot sources such as Hand Tube wells, Tara Hand Pump, Singer hand pump etc. Safe water is to be readily and conveniently accessible at all times and in all situations and therefore , the scheme focuses on the creation of the infrastructure operating of drinking water supply schemes in rural areas. Piped Water Supply Scheme under Sivasagar PHE Division as on 20.07.2018:

Total Nos. of PWSS : 183 Nos.

Completed Scheme : 159 Nos.

Ongoing PWSS : 24 Nos.

Functioning PWSS : 125 Nos.

Defunct PWSS: 34 Nos.

A/A received for restoration of defunct PWSS 23 Nos.

Proposal for restoration of 11 Nos. of defunct scheme have already been sent to higher authority for necessary approval.

Activities : Availability of portable drinking water remains challenge in rural areas in several parts of the country. District Level Water Testing Laboratory (DLL) & Sub-Divisional Level Water Testing Laboratory (SDLL) do the water testing through Departmental source and Private source such as Hotels, Tea Gardens, Schools etc. Mobile Laboratory Van plays an important role in rural areas for water testing during flood. Mobile Water treatment Plant which helps in disaster management such as during flood by purifying the water and provide packeting safe Drinking water in the necessary areas.

Sanitation :

Swachh Bharat Mission (Gramin) (SBM)G

To accelerate the efforts to achieve universal sanitation coverage and to put focus on safe sanitation, the Prime Minister of

India launched the Swachh Bharat Mission on 2nd October, 2014. The Mission aims to achieve a Swachh Bharat by

2nd October,2019 as a fitting tribute to Mahatma Gandhi on his 150th birth anniversary. Swachh Bharat shall mean improving

the levels of cleanliness through Solid and Liquid Waste Management activities and making Gram Panchayats Open

Defecation Free (ODF). The Swachh Bharat Mission (Gramin) is not only about constructing toilets but aims at behavior

change of the masses to adopt better sanitation practices. Therefore, Information, Education and Communication

(IEC) strategies, planning and their effective implementation is the key to the success of Swachh Bharat.

The major function of SBM is to provide low cost individual household latrine (IHHL) in rural areas. To enable the provision

of low cost financing to individual households for the construction of household latrines and to leverage the network of NGOs

and SHGs identified by agencies and other financial institutions.

Sivasagar PHE Division Profile as on 20.07.2018: (Sanitation District)

Total Nos. of LACs : 4 Nos.

Total Nos. of Blocks : 5 Nos.

Total Nos. of GPs : 79 Nos.

Total Nos. of Villages : 518 Nos.

Total Nos. of Tea Gardens : 16 Nos.

Total Rural Households : 128225 Nos.

Total Rural Households identified as without toilet: 64400 Nos.

Household Covered with sanitary toilet till date : 128225 Nos.

Total Nos. of Community Sanitary Complexes (CSC) Constructed : Completed : 2 Nos. Ongoing : 2 Nos.

Construction of Public Toilets under Mukhyamantri Anamay Achoni : 4 Nos. (All ongoing)

Total Nos. of GPs achieved ODF status : 79 Nos.

Total Nos. of Village achieved ODF status : 518 Nos.

IEC Activities:

1. IPC Interpersonal Communication (House to House visit)

2. Awareness meeting

3. Cleanliness Drive

4. Plantation Drive

5. Sanitary Mela

6. Exhibition

7. Celebrating Global Hand Washing Day, World Toilet Day

8. Awareness During Flood

9. Convergence with ICDS, NRHM, SSA, Bazar Committee

10. IEC in Schools

11. Street Play

12. IEC through IEC van

13. Hoarding, Banner,Postering,distribution of leaflet, D.O. letter of D.C. Dibrugarh

14. Cycle Rally, Bike Rally

Externally Aided Programme like World Bank aided project.

Neer Nirmal Pariyojana

NEER NIRMAL PARIYOJANA

DPMU, SIVASAGAR

THE GREATER AMGURI AND GAURISAGAR INTEGRATED

WATER SUPPLY SCHEME

Over View of Project Area Map

INTRODUCTION:

• The Ministry of Drinking Water and Sanitation (MoDWS) and the World Bank

have jointly developed the Neer Nirmal Pariyojana – Rural Water Supply and

Sanitation Project for Low Income States (RWSS-LIS) with an objective to

improve piped water supply and sanitation services for selected rural

communities in the target states through decentralized service delivery systems.

The RWSSP-LIS is being implemented in the four states namely Assam, Bihar,

Jharkhand, and Uttar Pradesh. In Assam Rural Water Supply & Sanitation

Project for Low Income States has been taken in seven Districts of Assam in

two batches during the period 2014-2020.

Fund sharing pattern:

• World Bank = 50.00%

• Govt. of India (NRDWP) = 44.50%

• Govt. of Assam = 4.50% • Govt. of Assam = 4.50%

• Community Contribution = 1.00% (General: Rs. 450/- and SC/ST: Rs. 225/-)

Component wise share (as per PIP):

• Infrastructure: 91%

• Project Management: 3%

• Capacity Building and Sector Development: 6%

INTRODUCTION:

Project Implementation Period:

• Construction Period = 3 Years.

• O&M Period = 5 Years.

Date of Commencement of the Project:

• In Sivasagar District the pre planning phase started

from September /2016.

• Batch I Districts: Jorhat, Kamrup (M) and Hailakandi.

• Batch II Districts: Sivasagar, Bongaigaon, Morigaon and Sonitpur.

Design period: The project is designed for a period of 30 years

BASIC OBJECTIVE OF

NEER NIRMAL PARIYOJANA

1. TO PROVIDE CLEAN AND SAFE DRINKING WATER

TO EACH HOUSE HOLD AND INSTITUTES UNDER THE

PROJECT AREA.

2. TO BRING AWARNESS AMONG THE PEOPLE,

REGARDING USE OF SAFE DRINKING WATER, PROPER DISPOSAL OF SOLID LIQUID WASTE AND SANITATION etc.

3. TO MAKE THE VILLAGEs CLEAN AND DISEASES FREE

PROJECT PROFILE

NAME OF DISTRICT SIVASAGAR

SOURCE RIVER/INTAKE RIVER DIKHOW

Nos. OF DEV. BLOCK

COVERED

2 Nos.

NAME OF THE DEV.

AMGURI & GAURISAGAR BLOCKS

AMGURI = 10 Nos.

Nos. OF GP COVERED GAURISAGAR = 15 Nos.

TOTAL = 25 Nos.

PROJECT PROFILE

NAME OF GPs UNDER AMGURI NAME OF GPs UNDER

DEV. BLOCK GAURISAGAR DEV. BLOCK

(10 Nos.) (15 Nos.)

AMGURI BORUAPUKHURI

BHUYAN HAT CHARING

BORAHIBARI DEORAJA

BORBAM DIKHOWMUKH

BORSILA DIKSU

BORUAH ALI HAFALUTING

LALIM CHAPORI HATIGHULI

NAMTI ALI KAWOIMARI

NAMTI DOL KHONAMUKH

PENGERA MOGORAHAT

MOMAITAMULI

MORABAZAR

RONGPUR

RUDRASAGAR

SOLOGURI

PROJECT PROFILE

Nos. OF VILLAGES TO BE COVERED

UNDER AMGURI DEV. BLOCK 60 Nos.

UNDER GAURISAGAR DEV. BLOCK 101 Nos.

TOTAL 161 Nos.

Nos. OF HABITATIONs TO BE COVERED

UNDER AMGURI DEV. BLOCK 283 Nos.

UNDER GAURISAGAR DEV. BLOCK 336 Nos.

TOTAL 619 Nos.

Nos. OF ARSENIC AFFECTED HABITATIONs

UNDER AMGURI DEV. BLOCK 23 Nos.

UNDER GAURISAGAR DEV. BLOCK 8 Nos.

TOTAL 31 Nos.

INSTITUTIONAL ASPECT OF NEER NIRMAL

PARIYOJANA

Govt of India (Ministry of Drinking Water &

Sanitation

Govt. Of Assam ( Public Health Engineering

Department)

State Project Management Unit

District Project Management Unit

Gaon Panchayat Water &

Sanitation Committee

National Project

Management Unit

State Water & Sanitation Mission

Multi Village Water & Sanitation Committee

9

Constitution of MVWSC & GPWSC

MVWSC

Chairperson Zilla Parishad President

Vice

ZP, CEO/Administrator

Chairperson

Member EE (PHE) of Project Execution

Secretary Division

Chairperson from project GP

Members

Members of AP

Members of ZP

GP Secretary

Selected

SHG/ Youth/ Citizen Group

Members (2 )

GPWSC

Chairperson President of respective GP

Vice

Vice President of respective GP

Chairperson

Member Sectional Officer (AE/JE) PHE

Secretary

President of Village Level

Member Health & Sanitation Committee

of NHM

Member Anchalik Panchayat Member of

the GP

Member All ward members of the GP

Member President(s) of VWSC under the

GPWSC

Member Secretary(s) of VWSC under the

GPWSC

Member Secretary of respective GP

Member ASHA/Anganwadi Workers

within the GP

Member Swachhata Doot of the GP

BASELINE SURVEY

Baseline Survey Status Completed

Nos. of HH Survey 36,200 nos.

Nos. of Institutional Survey

1,320 nos. conducted

Population count 1,66,967 nos.

SC HH 3,316 nos.

ST HH 857 nos.

General HH 32,027 nos.

The Baseline Survey

The Baseline survey was proposed

toundertake to commence the Neer Nirmal

Pariyojana operations in the project areas.

The survey was undertaken using web-

basedsoftware through Tablet (hand held

computer).

Pre-requisites for Baseline Survey

Prior start of – Baseline Survey:

Identification of Enumerators

Collection of necessary documents and information from respective GPs

Orientation /training programme

Hand over of “Tablets”

Awareness Meeting with respective GP Presidents /GPWSC Members

Preparation of Micro-plan

During – Baseline Survey:

Constant Monitoring and Guidance:

Refresher training and Reviews:

Block Coordinator and District Team

Data Flow /Architecture

NPMU

/WB

Features & Advantages of Tab-Based Survey

Android based application with UIs for Tablet and Smart phones.

For authorized users only

Geo tagging and time stamping of all the data collected

Feature for offline data collection and synchronization on availability of

GPRS connectivity

Real time data capture

Real time Monitoring of data

Elimination of human errors

No scope of manipulation as GIS coordinates and time stamping is there

Performance analysis at each level of execution (Enumerator /GP

/DPMU etc.)

Survey Entry Module (Tab-Based)

1. Click on the Icon

Icon of the application

(Under the issues Tablet )

Login Page

Home Page

2. Enter User name &

Password and click

“Login” button

17

Survey Monitoring Module (Web-Based)

Login Page

Icon of the application

(Under NNP Website)

18

Monitoring Module - Record View

INITIATIVES DURING BLS

• DISCUSSION WITH THE GP PRESIDENT, WARD MEMBERS,

REGARDING Nos. OF HH AND POPULATION WITHIN THE

GP

• TALLY THE NNP SURVEY DATA WITH CENSUS, SMB, GPDP

AND CIRCLE OFFICE DATA.

• PUBLICITY AND SUPPORT SOUGHT FROM VARIOUS

NAMGHAR, MASJID, CULTURAL CENTRE

• DISCUSSION WITH THE MUNICIPAL OFFICE REGERDING

Nos. OF HH TRANSFERRED TO MUNICIPAL AREA

• RANDOM VISIT BY DPMU STAFF TO SOME REMOTE AREA

HHs.

• MID TERM ASSESMENT

Enumerator Review Meeting HH survey by Enumerator

Meeting at GP office regarding secondary

Field visit and onsite survey by M&E data and CM Selection

CAPACITY BUILDING

Nos. of Ward level meeting conducted :- 375 nos.

Nos. of Habitation/village level meeting conducted :- 1962 nos.

Nos. of GPWSC Training conducted :- 25 nos.

Nos. of GPWSC meeting Conducted : - 200 Nos.

Nos. of Community Mobilizers :- 42 nos.

Nos. of GPWSC Bank a/c opened :- 25 nos.

MID TERM IMPACT ASSESMENT REPORT (MTIA)

Particulars YES (%) NO (%)

Awareness on Benefits of the Project 83.14 14.59

Awareness on Community Contribution 85.61 13.20

Awareness on User Charges (OPEX) 82.02 15.77

Baseline Survey Conducted 98.96 1.04

104 Nos. of HH responded as Survey Not conducted out of 10,000 HH

MONTHLY REVIEW MEETING OF CM

SLWM AWARNESS BY

HABITATION LEVEL AWARNESS CAMP

AWRNESS AMONG MOTHR GROUP

COMMUNITY CONTRIBUTION STATUS

Name of

CC Target

CC CC CC OT

District Collected PERCENTAGE updated

Sivasagar 1,53,51,075 15,38,847 10.02% 10,01,475

General HH @ Rs. 450/- per HH

SC/ST HH @ Rs. 225/- per HH

STATUS OF CC COLLECTION

TARGET CC

CC CC

SL NO GP NAME COLLECTED PERCENTAGE (Rs.)

(Rs.) (Rs.)

SL NO GP NAME TARGET CC

(Rs.) CC COLLECTED

(Rs.)

CC PERCENTAGE

(Rs.)

1 Amguri 8,81,325 85,950 9.75

2 Bhuyanhat 7,33,950 57,375 7.81

3 Borahibari 5,76,450 36,000 6.24

4 Borbam 3,95,100 1,10,700 28.01

5 Borsilla 9,32,625 46,575 4.99

6 Boruah Ali 6,74,775 31,950 4.73

7 Lalim Chapori 4,36,050 1,19,700 27.45

8 Namtiali 7,04,475 1,65,150 23.44

9 Namtidol 4,61,700 50,625 10.96

10 Pengera 5,46,975 1,02,600 18.75

STATUS OF CC COLLECTION

SL NO GP NAME TARGET CC CC COLLECTED

CC

PERCENTAGE

SL NO GP NAME TARGET CC CC COLLECTED CC PERCENTAGE

1 Boruapukhuri 6,92,775 34,650 5.00

2 Charing 4,99,500 80,550 16.12

3 Deoraja 5,87,475 2,57,850 43.89

4 Dikhowmukh 4,93,200 55,800 11.31

5 Diksu 6,77,475 94,275 13.91

6 Hafaluting 3,21,075 45,450 14.15

7 Hatighuli 6,38,100 80,100 12.55

8 Kawaimari 7,93,575 1,94,850 24.55

9 Khonamukh 7,41,375 64,350 8.67

10 Mogorahat 3,64,050 74,475 20.45

11 Momaitamuli 4,66,425 76,950 16.49

12 Morabazar 4,99,050 69,525 13.93

13 Rongpur 8,31,600 1,15,875 13.93

14 Rudrasagar 4,95,675 1,10,700 22.33

15 Sologuri 9,06,300 99,000 10.92

SANITATION, SEGREGATION & SOLID

LIQUID WASTE MANAGEMENT

Awareness in GPs/Habitation/Ward

Training of Community Mobilizers

IPC individual household

Schools Awareness campaign for Proper Hand washing ,

Sanitation, Segregation of waste (Dry and Wet) and

personal hygiene

GPWSC Meeting

CLTS activities

Event: Celebration of World Environment Day in Gaurisagar

Development block and mass rally from Gaurisagar High

School to Hawlating.

Distribution of dust bin in Gaurisagar weekly market area.

One Day Non Residential Training Of

Community Mobilizers on Sanitation and SLWM

SURVEY ON SOLID LIQUID WASTE

MANAGEMENT

• Name of Village: Miri Chutia Gaon and Baghjan Grant

• Habitation: 8

• Name of GP: Borbam

• Name of Block: Amguri

• Total no. of HH: 898nos.

• Only Solid portion was covered.

• Total quantity of wet (food) waste generate per

day: 34 kg/ day

• Total quantity of dry waste ( recyclable) waste

per day: 175kg/day

Borbam GP Map

SLWM Survey Photographs

Expected Outcome

• Behavioural change

• Used of toilet

• Proper hygiene and Environment clean

• Segregation of waste (dry and wet)

in individual household

• Used of dust bin

• Dry waste can sell to Kawariwala

• Wet waste can turn into compost/

vermi compost

TOPOGRAPHICAL SURVEY

• TROPOGRAPHICAL SURVEY

CONDUCTED IN ALL THE

PROJECT GPs. • TOTAL LENGTH FOUND: 1025.78 km.

LAND DETAILS

• LAND FOR WTP IS ALREADY HANDED OVER

TO THE PHED, SIVASAGAR

• LAND FOR THE ESRs ARE FINALISED.

• SOCIAL SCREENING OF THE WTP LAND,

INTAKE POINT AND THE ESR LOCATIONs

COMPLETED.

LAND FOR ESRs

PROPOSED Nos. OF ESRs 42 Nos.

Nos. OF ESRs FINALISED 32 Nos.

OUT OF THE TOTAL Nos. OF ESRs FINALISED

GOVT. LAND 12 Nos.

DEPARTMENTAL LAND 20 Nos.

SN Name of GP

Govt. Land (14 nos.)

Purpose of land

Total

land

Required

(in Ha)

Land Type

(Govt/ Pvt) Location

1 BORSILA ZONAL ELEVATED

RESERVOIR AT

BORSILA 900

Govt. land

(Revenue)

AT VILLAGE

THIPUK CHAH

BAGISHA Pahari Line

2 DIKHOWMUKH ZONAL ELEVATED

RESERVOIR AT

DIKHOWMUKH 900

Govt. land

(Revenue) AT VILLAGE

BHARALUWA Bharaluwa

3 KAWOIMARI ZONAL ELEVATED

RESERVOIR AT

KAWOIMARI 900

Govt. land

(Revenue)

AT VILLAGE

DECIAL DULIA

GAON

Near

Janajati

High School

at Nakatani

, Kalugaon

4 RUDRASAGAR

ZONAL ELEVATED

RESERVOIR AT

RUDRASAGAR

900 Govt. land

(Revenue) AT VILLAGE

RUPAHI BILL Near GP

office

RUDRASAGAR 900 Govt. land

(Revenue) AT VILLAGE

RUPAHI PATHAR

Near

Bongaon

High School 5

6 HATHIGHULI ZONAL ELEVATED

RESERVOIR AT

HATIGHULI 900

Govt. land

(Revenue)

AT VILLAGE

NO.1 KHULA

GRAZING

Khula

Grazing

7 CHARING ZONAL ELEVATED

RESERVOIR AT

CHARING 900

Govt. land

(Revenue)

AT VILLAGE

CHALIHA

KAKOTI

CHALIHA

KAKOTI

SN Name of GP

Govt. Land (14nos.)

Purpose of land Total land

Required

(in Ha)

Land Type

(Govt/ Pvt) Location

8 MORABAZAR ZONAL ELEVATED

RESERVOIR AT

MORABAZAR 900

Govt. land

(Revenue) AT VILLAGE

KHATUAL KHATUAL

9 BORAHIBARI ZONAL ELEVATED

RESERVOIR AT

BORAHIBARI 900

Govt. land

(Revenue)

AT VILLAGE

BOSASAYAK

DIBRUAL

BOSASAYAK

DIBRUAL

10 BARUAH

PUKHRI

ZONAL ELEVATED

RESERVOIR AT

BARUAH PIKHURI 900

Govt. land

(Revenue) AT VILLAGE

ABHOIPURIA ABHOIPURIA

11 RONGPUR ZONAL ELEVATED

RESERVOIR AT

MUMAI RONGPUR 900

Govt. land

(Revenue) AT VILLAGE

KURULA KOTIA KURULA

KOTIA

12 MUMAITAMULI ZONAL ELEVATED

RESERVOIR AT

MUMAI TAMULI 900

Govt. land

(Revenue) AT VILLAGE

BOGAGUHAIN BOGAGOHAIN

13 MUMAITAMULI

WATER

TREATMENT

PLANT AT MUMAI TAMULI

37500 Govt. land

(Revenue) AT VILLAGE

BOGAGUHAIN BOGAGOHAIN

14 Kawaimari Intake Point Govt. land

(Revenue) Namdongia

Bongali Gaon NAMDONGIA

BONGALI

SN Name of GP

Departmental Land

Purpose of land Total land

Required

(in Ha)

Land Type

(Govt/ Pvt) Location

1 NAMTI ALI ZONAL ELEVATED

RESERVOIR AT NAMTI

ALI

900 Departmental

Land SOMDAR

GAON SOMDAR

P.W.S.S.

2 NAMTI ALI 900 Departmental

Land LUNPURIA

GAON LUNPURIA

P.W.S.S

3 NAMTIDOLE ZONAL ELEVATED

RESERVOIR AT NAMTI

DOL 900

Departmental

Land AT VILLAGE

BAILUNG Namtidole

P.W.S.S

4 BARUAH ALI ZONAL ELEVATED

RESERVOIR AT

BARUAH ALI 900

Departmental

Land AT VILLAGE

BALIMARA

KARCHUWA

BALIMARA

P.W,S.S

5 BORSILA ZONAL ELEVATED

RESERVOIR AT

BORSILA 900

Departmental

Land

AT VILLAGE

BORSILA

GRANT

BORSILA

P.W.S.S

6 BORBAM ZONAL ELEVATED

RESERVOIR AT

BORBAM 900

Departmental

Land

AT VILLAGE

BAGJHAN

GRANT

BAGJHAN

GRANT

P.W.S.S

7 PENGERA ZONAL ELEVATED

RESERVOIR AT

PENGERA 900

Departmental

Land

AT VILLAGE

DULIA

CHARAL

DULIA

CHARAL

P.W.S.S

8 BHUYANHAT ZONAL ELEVATED

RESERVOIR AT

BHUYAN HAT 900

Departmental

Land

AT VILLAGE

BHUYAN

GAON

DHUNIA

BHUYAN

P.W.S.S

SN Name of GP

DEPARTMENTAL LAND

Purpose of land Total land

Required

(in Ha)

Land Type

(Govt/ Pvt) Location

9 BHUYANHAT ZONAL

ELEVATED

RESERVOIR AT

BHUYAN HAT

900 Departmental

Land

AT VILLAGE

BHUYAN

GAON

DHUNIA

BHUYAN

P.W.S.S

10 BHUYANHAT 900 Departmental

Land

CHAWDANG

GAON CHOWDANG

P.W.S.S.

11 DEORAJA

ZONAL

ELEVATED

RESERVOIR AT

DEORAJA

900 Departmental

Land

AT VILLAGE

RATANPURIA RATANPURIA

P.W.S.S

12 MOGORAHAT

ZONAL

ELEVATED

RESERVOIR AT

MOGARAHAT

900 Departmental

Land

AT VILLAGE

GAR

KAKHARIA

MOGARAHAT

P.W.S.S

13 HATHIGHULI

ZONAL

ELEVATED

RESERVOIR AT

HATIGULI

900 Departmental

Land

AT VILLAGE

BAMUN

MORAN

Bamu Moran

P.W.S.S.

14 KHONAMUKH ZONAL

ELEVATED

RESERVOIR AT

KHONAMUKH

900 Departmental

Land

AT VILLAGE

NO.1MOUT

GHAR

PHOLIA

MOUT GHAR

PHOLIA

P.W.S.S

15 KHONAMUKH 900

Departmental

Land

AT VILLAGE

BHITARUAL

NORA GAON

BHITARUAL

P.W.S.S

SN Name of GP Departmental land

Purpose of land Total land

Required

(in Ha)

Land Type

(Govt/ Pvt) Location

16 HOLOGURI ZONAL ELEVATED

RESERVOIR AT

HOLOGURI 900

Departmental

Land Salaguri

village SALAGURI

P.W.S.S.

17 RONGPUR ZONAL ELEVATED

RESERVOIR AT

RONGPUR 900

Departmental

Land NA ALI

CHRISTIAN

RANG

GHAR

CHARIALI

P.W.S.S.

18 DIKHSU ZONAL ELEVATED

RESERVOIR AT

DIKHSU 900

Departmental

Land AT VILLAGE

MOUT

MOUT

GAON

P.W.S.S

19 LALIMCHAPORI ZONAL ELEVATED

RESERVOIR AT LALIM

CHAPORI 900

Departmental

Land

AT VILLAGE

LALIMCHIGA

CHAPORI

LALIM

CHAPORI

P.W.S.S

20 HAFOLUTING ZONAL ELEVATED

RESERVOIR AT

HAFOLUTING 900

Departmental

Land AT VILLAGE

TEPOR CHARINGIA

P.W.S.S

21 AMGURI ZONAL ELEVATED

RESERVOIR AT

AMGURI 900

Departmental

Land HALUATING

GRANT

HALUATING

GRANT

P.W.S.S

POSTING AND VACANCY POSITIONS OF O/O THE

EXECUTIVE ENGINEER (PHE), SIVASAGAR DIVISION

AS ON 25.10.2019

POSTING AND VACANCY POSITIONS OF O/O THE EXECUTIVE ENGINEER (PHE), SIVASAGAR DIVISION

(i) Posting Position :

Sl.

No.

Designation Name of the Incumbent

1 Executive Engineer Sri Sanjib Kumar Bordoloi (i/c)

2 Assistant Executive Engineer Sri Sanjib Kumar Bordoloi

Sri Kumud Ranjan Hazarika

Sri Dilip Kumar Shyam (T/C)

3 Assistant Engineer Sri Jayanta Kataky

Md. Ahmadur Rahman

Sri Dilip Kumar Kalita

Sri Rajib Kumar Borpuzari

4 Accounts Officer Md. Gazibar Rahman Mandal

5 Deputy Accounts Officer Sri Zakiur Rahman

Sri Sanjay Hazarika

6 Assistant Accounts Officer Nil

7

Junior Engineer Sri Indra Kanta Nath

Sri Chumi Priya Bora

Sri Bibhuti Kumar Chetia

Sri Alokesh Kakoty

Sri Walson Bennet

Sri Dilip Kumar Gogoi

Sri Kalyan Chandra Borah

Sri Debajyoti Gogoi

Sri Nitu Borah

Sri Nabajit Dutta

8 Senior Assistant Nawab Miftahuz Zaman

Smti Monideepa Gogoi

Smti Lina Saikia

Sri Boikuntha Deka Baruah

9 Junior assistant Sri Jawahar Jyoti Changkakoti

Smti Rashmi Rekha Hazarika

10 Section Assistant Sri Trailukya Borah

Sri Jiban Konwar

Sri Tultul Kakoty

11 Driver Sri Moni Kanta Konwar

Sri Khirud Buragohain

12 Chowkidar Sri Ajit Hazarika

Sri Tepuram Handique

Sri Nandeswar Rajbonshi

13 Peon Sri Bipul Kumar Gogoi

Sri Ranjit Kol

Sri Porag Protim Goswami

(ii) Present Posting Position : As on 25.10.2019

# POST NAME PERMANENT TEMPORARY

Sanctioned Strength Vacancy Sanction

ed Strength Vacancy

1 EXECUTIVE ENGINEER (PHE) 1 0 1 0 0 0

2 ASSISTANT EXECUTIVE

ENGINEER 2 2 0 0 0 0

3 ASSISTANT EXECUTIVE

ENGINEER (PHE)(T.C) 1 1 0 0 0 0

4 ASSISTANT ENGINEER 5 4 1 0 0 0

5 JUNIOR ENGINEER 16 10 6 0 0 0

7 ACCOUNTS OFFICER 1 1 0 0 0 0

8 DEPUTY ACCOUNTS OFFICER 1 1 0 1 1 0

9 ASSISTANT ACCOUNTS OFFICER 1 0 1 1 0 1

10 SUB. ENGINEER GRADE-I 1 0 1 0 0 0

11 SENIOR ASSISTANT 4 4 0 0 0 0

12 JUNIOR ASSISTANT 6 2 4 0 0 0

13 SECTION ASSISTANT 6 2 4 5 5 0

14 TRACER 1 0 1 0 0 0

15 CHOWKIDAR 3 3 0 0 0 0

16 DRIVER 3 1 2 1 1 0

17 ELECTRICIAN 0 0 0 1 1 0

18 KHALASI 13 1 12 117 117 0

19 PEON 6 3 3 0 0 0

20 PLUMBER 2 0 2 0 0 0

21 PUMP OPERATOR 7 1 6 12 12 0

TOTAL 80 36 44 138 137 1