Ph:08933 229556, Email: president.bcbs@gmail.com.

Post on 27-Dec-2015

225 views 0 download

Transcript of Ph:08933 229556, Email: president.bcbs@gmail.com.

Ph:08933 229556, Email: president.bcbs@gmail.com

1

2

3

Lo

ca

tio

n

4

J962

I

229

H 935 G 350F 385

M

63

0

302

502

E

AB 151

198

Q3712

200P9

6020

1466

1920

948

C2

420

148

225

215

N158 O

2963

225

789

489

489

585

P1 S1

203

L349M3

166

K3 423

J3

206 235

I3H3 733 G3

394 210F3 E3

314

D3470

C3

A3305 425 26

1

1038

Z2 Y2X2

W2505 V2

300

M2N2

O2

P2

H2J2

K2L2

55

3

444

SCALE: 1 CM = 2 ½ CHAINS5

SIT

E D

RA

WIN

GS

ite

Dra

win

g

6

Ph

oto

gra

ph

s

7

Ph

oto

gra

ph

s

8

Ph

oto

gra

ph

s

9

Ph

oto

gra

ph

s

10

10

11

La

nd

Av

ail

ab

ilit

y

12

12

13

La

yo

ut

Re

qu

ire

me

nts

14

14

- Adequate

- Clean and Clear

- Potable

- 24 Hours Supply

- Tap Running Water

WATER SUPPLY

15

Am

en

itie

s

- Ground water

- Municipal water

- Independent near by Water source

- Desalination of sea water

exploration OF WATER SOURCE

Desalination of sea water Ground waterGround water16

Am

en

itie

s

- 24 Hours Uninterrupted Supply

- Three Phased

- Stable

- Underground Cable Supply

POWER SUPPLY

17

Am

en

itie

s

SOURCES OF POWER- State Electric Supply- Wind Power- Solar Based- Diesel Generated- Wastage Based- Stand by System

Wind PowerWind Power Solar basedSolar based Wastage basedWastage based18

Am

en

itie

s

SEWAGE- Underground

- Update

Technology

- Recycling

19

Am

en

itie

s

Garbage and WastageDisposal System

20

Am

en

itie

s

Telecommunications

21

Am

en

itie

s

Security

22

Am

en

itie

s

Open Spaces

23

Am

en

itie

s

Crz area development

24

Am

en

itie

s

25

26

Civ

il I

nfr

as

tru

ctu

re

27

*

***********

****

28

Infr

as

tru

ctu

re F

ac

ilit

ies

29

30

Ho

us

ing

31

32

Es

tim

ate

d C

os

t

33

Sl.No

Item Description

Expected Dev. charges per Sq.yard (in Rs.)

Minimum Maximum

1 Land conversion fee to the Govt. 20 20

2 CRZ Study and Approval 20 20

3 Land Survey and Site Plan 20 40

4 Layout Plan Study and Preparation 20 60

5 VUDA Approval for the Layout 60 60

6 Compound Wall 100 100

7 Civil Works (Leveling, Roads, Drains etc.) 500 700

8 Water Supply 250 250

9 Power Supply 250 250

10 Sewage System 375 375

11 Essential Amenities (Telecommunications, Security, Horticulture)

100 100

12 Infrastructure Facilities (Community Hall, Office Building, Recreation Centre etc.)

500 740

13 Temple 60 60

14 Maintenance Fund (Refundable) 200 200

15 Contingency provision 25 25

Total 2500 3000

Members pay only the actual cost incurred in proportion to the Plot size. The indications are rough estimates to be firmed up by the Consultants first and Work Order thereon. The indications are at current price level and applicable to old Members only.

34

Co

st

Da

ta S

he

et

35

Re

lati

ve

Co

sts

36

37

Me

tho

do

log

y

38

Me

tho

do

log

y

39

40

Mo

nit

ori

ng

41

42

Fin

an

ce

Co

mm

itte

e

43

Fin

an

ce

Co

mm

itte

e

44

Ap

pro

va

ls

Ph:08933 229556, Email: president.bcbs@gmail.com