ERECTION of Pelton Turbine

ubansiri PGR-6 - 22/01/2013 - P 2

We reserve all rights in this document and in the information contained therein.

Reproduction, use or disclosure to third parties without express authority is strictly forbidden.

ubansiri PGR-6 - 22/01/2013 - P 3

Agenda

1. Lower Housing

2. Spiral Distributor

3. Roof Cover

4. Pit Liner

5. Lower Cone

6. Nozzles

7. Runner wheel

8. Guide Bearing

9. MIV

ubansiri PGR-6 - 22/01/2013 - P 4

ubansiri PGR-6 - 22/01/2013 - P 5

General view

ubansiri PGR-6 - 22/01/2013 - P 6

Runner removal platform

ubansiri PGR-6 - 22/01/2013 - P 7

Turbine Housing

ubansiri PGR-6 - 22/01/2013 - P 8

Distributor Part 1

ubansiri PGR-6 - 22/01/2013 - P 9

ubansiri PGR-6 - 22/01/2013 - P 10

Distributor Part 2

ubansiri PGR-6 - 22/01/2013 - P 11

Distributor Parts 1 & 2

ubansiri PGR-6 - 22/01/2013 - P 12

Lowering Distributor Part 3

ubansiri PGR-6 - 22/01/2013 - P 13

Distributor Parts 1 , 2 & 3

ubansiri PGR-6 - 22/01/2013 - P 14

Lowering Distributor Part 4

ubansiri PGR-6 - 22/01/2013 - P 15

Distributor Parts 1 , 2 ,3 & 4

ubansiri PGR-6 - 22/01/2013 - P 16

Welding holder

ubansiri PGR-6 - 22/01/2013 - P 17

Defects in parent metal

ubansiri PGR-6 - 22/01/2013 - P 18

Parent Metal defects

ubansiri PGR-6 - 22/01/2013 - P 19

Heating Arrangements

ubansiri PGR-6 - 22/01/2013 - P 20

DPT

ubansiri PGR-6 - 22/01/2013 - P 21

Welding

ubansiri PGR-6 - 22/01/2013 - P 22

Erection of distributor Flange Cones

ubansiri PGR-6 - 22/01/2013 - P 23

Housing Roof on service Bay

ubansiri PGR-6 - 22/01/2013 - P 24

Lowering of Housing Roof

ubansiri PGR-6 - 22/01/2013 - P 25

Lowering of Housing Roof

ubansiri PGR-6 - 22/01/2013 - P 26

Housing roof

ubansiri PGR-6 - 22/01/2013 - P 27

Housing Roof Installed

ubansiri PGR-6 - 22/01/2013 - P 28

Distributor & Housing Roof

ubansiri PGR-6 - 22/01/2013 - P 29

Blank flange for Pressure Test

ubansiri PGR-6 - 22/01/2013 - P 30

Blank flange for Pressure Test

ubansiri PGR-6 - 22/01/2013 - P 31

Distributor Pressure Test

ubansiri PGR-6 - 22/01/2013 - P 32

Distributor Pressure Test

ubansiri PGR-6 - 22/01/2013 - P 33

Embedded Pips

ubansiri PGR-6 - 22/01/2013 - P 34

Cone Support

ubansiri PGR-6 - 22/01/2013 - P 35

Central Cone

ubansiri PGR-6 - 22/01/2013 - P 36

Central Cone

ubansiri PGR-6 - 22/01/2013 - P 37

Lowering of central cone and Cone support

ubansiri PGR-6 - 22/01/2013 - P 38

Central cone and Cone support

ubansiri PGR-6 - 22/01/2013 - P 39

Central cone and Cone support stored in Pit

ubansiri PGR-6 - 22/01/2013 - P 40

Concreting

ubansiri PGR-6 - 22/01/2013 - P 41

Concreting

ubansiri PGR-6 - 22/01/2013 - P 42

PH general View

ubansiri PGR-6 - 22/01/2013 - P 43

PH general View

ubansiri PGR-6 - 22/01/2013 - P 44

Turbine Housing

ubansiri PGR-6 - 22/01/2013 - P 45

Horizontality of Bearing Support

ubansiri PGR-6 - 22/01/2013 - P 46

Adjusting Horizontality of Bearing Support

ubansiri PGR-6 - 22/01/2013 - P 47

Turbine Guide Bearing (Shell Type) in 2 Parts

ubansiri PGR-6 - 22/01/2013 - P 48

Bearing Assembly with Bearing support

ubansiri PGR-6 - 22/01/2013 - P 49

Guide Bearing and Bearing Support

ubansiri PGR-6 - 22/01/2013 - P 50

Turbine Shaft

ubansiri PGR-6 - 22/01/2013 - P 51

Tilting of Turbine Shaft

ubansiri PGR-6 - 22/01/2013 - P 52

Lowering Guide bearing for trial assembly

ubansiri PGR-6 - 22/01/2013 - P 53

Leakage Test of Rotating Sump ( Oil Tank)

ubansiri PGR-6 - 22/01/2013 - P 54

Turbine Guide Bearing

ubansiri PGR-6 - 22/01/2013 - P 55

Bearing and Shaft assembly

ubansiri PGR-6 - 22/01/2013 - P 56

Lowering Turbine shaft and bearing assembly

ubansiri PGR-6 - 22/01/2013 - P 57

Turbine shaft being lowered in to Pit.

ubansiri PGR-6 - 22/01/2013 - P 58

Turbine Shaft In the Pit On special supports.

ubansiri PGR-6 - 22/01/2013 - P 59

Turbine Shaft In the Pit On special supports.

ubansiri PGR-6 - 22/01/2013 - P 60

Horizontality of Turbine Shaft By CAYERE Method

ubansiri PGR-6 - 22/01/2013 - P 61

Preparation for Nozzle adjustment.

ubansiri PGR-6 - 22/01/2013 - P 62

Dummy Nozzle

ubansiri PGR-6 - 22/01/2013 - P 63

Adjustment of Nozzles.

ubansiri PGR-6 - 22/01/2013 - P 64

Nozzle adjustment

ubansiri PGR-6 - 22/01/2013 - P 65

Machining of False Flange

ubansiri PGR-6 - 22/01/2013 - P 66

Nozzle Erection

ubansiri PGR-6 - 22/01/2013 - P 67

Nozzle Erection

ubansiri PGR-6 - 22/01/2013 - P 68

Checking Real Nozzle

ubansiri PGR-6 - 22/01/2013 - P 69

Pinning of False Flange

ubansiri PGR-6 - 22/01/2013 - P 70

Support for Magnetic base Drilling Machine

ubansiri PGR-6 - 22/01/2013 - P 71

Pelton Runner

ubansiri PGR-6 - 22/01/2013 - P 72

Lowering of Runner

ubansiri PGR-6 - 22/01/2013 - P 73

Servomotor for Runner Erection

ubansiri PGR-6 - 22/01/2013 - P 74

Runner Erection servomotor

ubansiri PGR-6 - 22/01/2013 - P 75

RUNNER ERECTION

ubansiri PGR-6 - 22/01/2013 - P 76

Runner Erection

ubansiri PGR-6 - 22/01/2013 - P 77

Hydraulic diagram for Runner erection servomotor

ubansiri PGR-6 - 22/01/2013 - P 78

Runner installed

ubansiri PGR-6 - 22/01/2013 - P 79

Removal of Runner lifting Disc

ubansiri PGR-6 - 22/01/2013 - P 80

Nozzle and Runner

ubansiri PGR-6 - 22/01/2013 - P 81

Nozzle and Runner

ubansiri PGR-6 - 22/01/2013 - P 82

view of Nozzle from U/S in the direction of flow

ubansiri PGR-6 - 22/01/2013 - P 83

Turbine shaft and bearing

ubansiri PGR-6 - 22/01/2013 - P 84

Break jet alignment

ubansiri PGR-6 - 22/01/2013 - P 85

Rotor In Pit

ubansiri PGR-6 - 22/01/2013 - P 86

Tur and Gen Shaft Coupling

ubansiri PGR-6 - 22/01/2013 - P 87

Checking residual elongation of Studs

ubansiri PGR-6 - 22/01/2013 - P 88

Shaft Line Run out

ubansiri PGR-6 - 22/01/2013 - P 89

Turbine Pit

ubansiri PGR-6 - 22/01/2013 - P 90

Tur pit and piping