Post on 14-Aug-2020
PBN and the Cockpit Workshop
Regulatory and Certification Forum
EASA regulatory Solutions
Bryan Jolly ATM Rulemaking Officer,
18th October 2012
Single safety framework
(EASA) Performance
Human factors
Technology (SESAR)
Airport capacity
2
Single European Sky - 5 pillars
3
Total System Approach
Economic regulation
Performance regulation
EASA total aviation system approach
Safety regulation
Current Regulations
Initial Airworthiness
Continuing Airworthiness Air Crew
Basic Regulation (EC) No
216/2008
Airworthiness Flight Standards ATM/ANS
Air Traffic Controllers Licences
ATM/ANS Oversight
ANS Providers
AUR and ACAS II
23/10/2012 The EASA / EU system 4 4
5
Airworthiness Flight Operations
Airspace Design Navigation infrastructure
Enabling PBN
PBN Regulations
• Regulation (EU) No 748/2011 ( Formally (EC) No 1702/2003) – Part 21
Airworthiness
6
7
Flight OPS Rules
CAT (by aeroplane or helicopter)
SPO (= aerial work)
NCC = Non-Commercial Operators of “Complex” aircraft (e.g. business or corporate
aviation)
NCO= Non-Commercial Operators of “non-complex” aircraft (e.g. light and sport private
aviation)
Much larger scope than EU OPS
OPS – rule structure
8
Part-ARO Authority requirements air operations Part-ORO, Organisation requirements for commercial air operators and non-commercial air operators of complex motor-powered aircraft Part-CAT Technical requirements for commercial air transport operations of aeroplanes and helicopters; Part-SPA, Requirements for operations requiring a specific approval Part-NCC, technical requirements for non-commercial operations of complex motor-powered aircraft Part-NCO, technical requirements for non-commercial operations of other-than-complex motor-powered aircraft Part-SPO, technical requirements for specific operations, including commercial and non-commercial operations
9
Annex V (Part SPA)
SUBPART B — PERFORMANCE-BASED NAVIGATION (PBN) OPS SPA.PBN.100 PBN operations •Aircraft shall only be operated in designated airspace, on routes or in accordance with procedures where performance-based navigation (PBN) specifications are established if the operator has been granted an approval by the competent authority to conduct such operations •No specific approval is required for operations in area navigation 5 (RNAV5 (basic area navigation, B-RNAV)) designated airspace
Part SPA applies to all operators: CAT, SPO, NCC, NCO
10