Post on 12-Oct-2015
5/21/2018 Parallel Session 1
1/2
Parallel Session 1
(30.10.2013)
Session S.No. Title Author
Track
and
Infrastructure
1 Alignment Design Criteria forDedicated High Speed Railway Lines
Mr. Arbind KumarDirector Projects
RITES Ltd, India
Mr. Amrendra Jha,
GM (Track and Survey)
RITES Ltd, India
2 A study for development of low cost
train digital communication network
for high speed rail travel for Indian
Railways.
Mr. Akhilesh Misra
Director Motive Power (EC)
RDSO, India
Mr. Sachinder Mohan Sharma,
Director Mechanical Engineering
(Efficiency & Research),
Railway Board ,India
3 High Speed OHE of Indian Railways
Issues, Challenges and Options
Mr. Jayendra Nath Lal,
Senior ED/TI,
RDSO,India
4 Fastenings for High Speed Track. Mr. Vipul KumarED/Track
RDSO,India
5 Optimising The Speed Potential Of
Curves: Increase In Permissible Cant
Deficiency- Feasibility And Challenges.
Mr. S.K.Pandey
Ex. Director/Track-I
RDSO, India
Mr. Ajay Kumar
Director/Track-II
RDSO, India
6 Rolling contact fatigue and its
management through rail grinding.
Mr. Pradeep Garg,
Chief Engineer,
Central Railway,
Mumbai, India
7 High speedTurnout actuation,
locking and detection devices
Cost efficient service proven
solutions.
Mr. Mayank Tripathi,
Director of Sales and Marketing,
Vossloh Cogifer , France
5/21/2018 Parallel Session 1
2/2