Outage Management System
Customer Partnership Group
November 2017
Customer Partnership Group
Scope and Objective
• Created in response to customer’s request to have more
involvement in the planning, design and usability validation phases
of ISO application development
• Provide an open interactive partnership forum to identify potential
opportunities to improve the overall customer experience
• Share ideas, opinions and provide feedback
• Discuss issues and concerns, and answer customer questions
• All ideas are welcome and will be considered based upon feasibility,
prioritization and timeline constraints. Not all ideas may be feasible
to implement
• Meetings vary in frequency to review progress, provide feedback on
design and usability and discuss implementation approaches
• Active participation is critical to the CPG success and to improve our
customer’s experience interacting with ISO applications
Page 2
OMS Customer Partnership Group
Agenda
• Production Performance – Request for Action
– Generation: Removal of unchanged values and
unused resources
– Generation: Limiting outage to one year
– All: Acceptable Use Policy
• Schedule/roadmap update
• Generation web service changes
• Transmission web service changes
• Transmission Outage Report discussion
Page 3
OMS Customer Partnership Group
Performance Concerns – Background
Generation Outages:
CAISO has observed many factors impacting OMS performance and growth.
Results show a couple findings:
• Participants are submitting values for resource availability on an hourly
basis with a Nature of Work ‘Ambient not due to temperature’ when the
values are not changing. This has a significant impact on the number of
records in OMS and transferred to our downstream systems (Markets, EMS,
etc).
– ISO has considered OMS options to collapse contiguous availability
points, but each option does not solve the performance problem for
OMS.
• Participants are continually trying to retrieve resources for which they are no
longer the scheduling coordinator (1,000+ attempts per day). These fail
based on our security, but this adds load to the system.
• Long-running outages with many availability points take a long time to open
and act on.
Page 4
OMS Customer Partnership Group
Performance Concerns – Action Requested
In response to these issues, the CAISO is taking steps to improve the product
performance and scalability, but we need your help with good housekeeping.
Action Requested:
• CAISO requests that participants ensure that availability points are only
submitted when they have changed.
• CAISO requests that participants actively remove resources that have
changed ownership.
• CAISO requests that participants limit generation outages to a duration no
longer than one year.
Page 5
OMS Customer Partnership Group
Acceptable Use Policy
For service consumption, the ISO has the following acceptable use agreement.
For each identity and service, the consumer shall invoke the service no more often
than once every 5 seconds. ISO production services may only be consumed for
production purposes.
• Limited to OMS API Retrieves only
– Not API Submits and not UI traffic
• The enforced limit is at the resource or outage ID level every 5 seconds
(Certificate/User/Resource or Outage ID)
• If a resource or outage is not being queried, enforcement will be by transaction, per
certificate, per service every 5 seconds
Next Steps:
• CAISO has enabled AUP in MAPStage; Proposed production date is January 2,
2018.
Page 6
OMS Customer Partnership Group November Release
Page 7
Type of Change Short Description
All CIDI 190963 Malformed Standard Output payload
All Deactivation of TLS 1.0
All Improvements to Outage Summary procedure
All Addition of 'NOW' button for the Actual Date/Time selection pop-up.
All Outage view getting deformed after modifying an Outage when Created from Duplicating an Outage.
Generation Improve performance for querying for overlapping outages
Generation Adding Additional Resource Type for Pump-Aggregate
Generation Ability to enter outages for resources prior to the participant/resource relationship start date
Generation Modify Nature of Work UNIT CYCLING to 'TECHNICAL LIMITATIONS NOT IN MARKET MODEL‘ (See slide 6)
Generation Add RA and EIM validations for applicable Natures of Work (See slide 6)
Generation Improve performance of the Retrieve Generation Outage Change Request Service
Generation Improve performance for Resource Availability Display
Generation Retrieve Registered Resource Outage service payload should not include other past requests
Transmission Existing Equipment – Ownership change or new owner (Transmission Owner)
Transmission State Transition Only Processing needs to allow Update to Switch End dates
Transmission Improve performance of B2B Retrieve Transmission Outage Service
Transmission Duplicate not working for Transmission Outages
TransmissionThe Switch Hop data for ALL OTHER pieces of equipment are End Dated when users uses the Equipment Reference
Modify display to edit a piece of equipment
OMS Customer Partnership Group
Roadmap
Page 8
Roadmap Item Description Target
Generation: MasterFile Ramp
Rate Changes
MF ramp rate changes should make invalid
only outages with NoW or RAMP_RATE.
January
Generation: Overlapping
Ancillary Service (AS) outages
Allow overlapping AS outages, the current
validation that restricts a user to not allow
overlaps will be removed.
January
Transmission/Generation:
Request is for a new "Data
Range"
Update the Outage Summary, Outage Request
Summary, and Warning Summary to include an
option in the Date Range dropdown called
“Yesterday, Today & Next Day.”
January
Transmission/Generation:
Broadcast version updates
CAISO to broadcast when an outage is
updated and a new version is created within the
OMS system.
TBD
Transmission: Trumping Allows the system to apply the switch
configuration of an outage if its priority trumps
one or more existing outages.
TBD
Generation: Overlapping PMIN
Cards
Allow overlapping PMIN rerates TBD
OMS Customer Partnership Group
Generation Functional Changes
Summary
• The Nature of Work (NoW) Entry display and NoW Summary display will
have two (2) new flags added: “RA Resource Only” and “EIM Only.”
Functionality Changes
• When an outage is entered using a Nature of Work that has the “RA
Resource Only” flag set to “Yes,” a validation will be added to verify that the
resource is Resource Adequacy (RA) designated at the start time of the
outage. If it is not, an error will be returned stating “The Nature of Work
selected can only be used with RA resources.” This validation will occur at
outage entry and outage modification.
• When an outage is entered using a Nature of Work that has the “EIM Only”
flag set to “Yes,” a validation will be added to verify that the participant’s
Organization Type is set to EIM. If it is not, an error will be returned stating
“The Nature of Work selected can only be used with an EIM participant.”
This validation will only occur at outage entry.
Page 9
OMS Customer Partnership Group
Generation Web Service v2
Summary
• Nature of Work (NoW) now has CONTINGENCY RESERVES
MANAGEMENT for EIM entities, and UNIT CYCLING is changed to
'TECHNICAL LIMITATIONS NOT IN MARKET MODEL‘.
Web Services Impacted – Minor Change
• SubmitRegisteredResourceOutage_V2,
SubmitRegisteredResourceOutageChangeRequest_V2,
RetrieveRegisteredResourceOutage_v2,
RetrieveRegisteredResourceOutageChangeRequest_v2,
RequestResourceOutage_V2, and
Action: Generation users who use the Unit Cycling NoW and EIM entities who
need to use Contingency Reserves Management must update to the new
service as soon as possibly and no later than February 1, 2018.
Page 10
OMS Customer Partnership Group
Transmission Web Service v2
Background: V2 of the transmission submit and retrieve services now has the
ability to submit and retrieve many equipment rating changes. To ensure data
integrity, TOs must retrieve transmission outages with all equipment rating
changes in order to submit any changes to the outage. This ensures that any
ISO entered ERCs are not overwritten. This is similar to how the switch data is
managed today.
V2 also has Resource Interconnection Management System NoWs that are
used by CAISO for network model promotions.
Action: TOs must update to the V2 transmission web services by February 1,
2018 to resolve the single versus multiple equipment rating change (ERC)
issue.
Issue – Payload structure does not easily distinguish between equipment that
is out of service versus a equipment rating change. This will be resolved in V3
to be released for fall 2018.
Page 11
OMS Customer Partnership Group
Transmission Web Service v2
Page 12
OMS Customer Partnership Group
Generation Outage Report
Summary
• The Generation Outage Report is currently posted daily at 3:15. A request
has been made to move this to the morning prior to 10:00 A.M.
Action
• CAISO is seeking feedback on the timing of this report.
Page 13
Page 14
OMS Customer Partnership Group
Wrap Up
• Open Topics Q&A