Out of the Mist Wind in the System EWEB’s experiences with bringing wind energy home (the short...

Post on 03-Jan-2016

216 views 0 download

Transcript of Out of the Mist Wind in the System EWEB’s experiences with bringing wind energy home (the short...

Out of the MistWind in the System

EWEB’s experiences with bringing wind energy home

(the short version)

Age of the Dinosaur

• 1992* Council Plan calls for renewables demo programs

• 1994* BPA issues RFP’s wind/geothermal• PCorp, EWEB, Kenetech (later SeaWest)

“win” wind solicitation• 1999 Foote Creek Rim Phase 1 goes

online

* If my memory is correct.

Foote Creek Rim

Long Story Shortened

• No realistic way to get from there to here, there being southeastern Wyoming and “here” being southern end of Willamette Valley (3 or 4 wheels depending on phase of the moon)

• No experience in Northwest with big wind

• So, PCorp decides to perform Major Magic (to keep project alive)

Major Magic - Defined

• Output will flow into the PCorp/Bridger transmission system and, “ta-da”, pop out on the west side of the Cascades 1 week later - flattened during the hour.

• We get a daily schedule, 168 hours delayed from actual generation.

• We’re still operating that way today.

Dawn of the Mammals

The Stateline Wind Project

Dawn continued …The Stateline Wind Project

• PCorp Power Marketing (PPM) grabs the whole Pizza;

• PPM offers, generously, to sell slices of Pizza;

• Slices seem to be “stuck” in Wallula Bubble because applying tariff rates, 2 wheels, etc. makes the pizza delivery box cost more than the pizza.

• PPM conjures up More Magic

More Magic - Defined

• PPM works with Seattle City Light, BPA, Gandalf, and others to arrange an interim hodgepodge stew* of “services” to get deliveries to Mid-C.

• Overall less expensive (?) than multiple wheels, outright purchase of services under existing tariffs, etc.

“More Magic” - Parameters

• Delivered energy is scheduled two months after generation;

• Month schedule at a time;• Flat amounts in HLH and LLH

portions of month;• Charges are dependent on many

factors.

Into the Future

Short Commercial Message

McNary to John DayTransmission Line

• 80 mile, 500 kV, $140 million, BPA own/operate;

• EWEB leading an effort to build this line with tax exempt financing;

• Partnering with City of Hermiston and the Port of Umatilla (will form an Oregon 190 Entity).

McNary to John Day

• Security for bonds relies on long-term Point to Point contracts;

• Seeking “subscribers”• For info or to sign-up contact

Scott Spettel at 541- 341- 8564