Ontario auto parts distribution centre with link

Post on 02-Dec-2014

272 views 0 download

Tags:

description

sma

Transcript of Ontario auto parts distribution centre with link

Ontario Auto Parts Distribution Centre

Lower your safety costs

Cambridge, Ontario

Location, location, location

Support from Cambridge Mayor

Why we need this DC?

• To help Ontario auto parts manufacturers• To help all car owners to lower their

maintenance costs• Create 100 local jobs• Attract foreign investments - 30 million C$

Ontario auto parts manufacturers – challenge facing

• timely delivery, • labor rates, • product quality, • and demands for cost cuts from the customer

Ontario auto parts manufacturers – we can help

• timely delivery, - we can help• labor rates, - less warehouse moving wastes• product quality, - we trace the products and

know which is bad• and demands for cost cuts from the customer

– that is why we are here

Smart warehousing technology – high efficiency, accuracy

• Real time inventory report without manual scan

• Gate monitoring – automatically generate report for auto parts in/out

• Gate alert – when wrong parts move out of the gate

• Mini GPS – show the best route to the shelf which the parts sit

Technology Integrator

• Chongqing Jundun Ontario Company• www.jundun.biz

3D sale terminal

Why 3D?

• No more guess, turn and see the side or internal structure, verify before order

• Take it apart and put them back• No waste time for wrong parts ordered• No return for wrong parts shipped

3D technology we have

• The following video will show you how our technology will help your client to get a 360 view of what you want to show them

Smart phone purchase

• Our solution is better than the one show in the video, buyer scan from the terminal screen not from the wall, so the content is dynamic

Video to show smart phone purchase

• Next video will show the process of smart phone scan and purchase process

Smart phone purchases

• http://www.youtube.com/watch?v=0HQ9D5kG7tk

After the order is placed

• We need to fulfill the order with efficiency and accuracy

• We have the technology to help

We can help the forklift driver for efficiency and accuracy

• 3D map of the warehouse• Show the best route on handheld• Guide to the 1st free spot• No need to move

3D warehouse map - handheld

Show my way

Mini GSP – show me best route

Digital map technology

• Our next video will show the technology of our digital map

Now it is time to deliver the goods

• We have the following solutions• Our system will track your fleet• Deliver to the drop station at night time

Verify the order when through gate

• When the delivery truck through the gate, the system will verify the items for all the orders

• Any discrepancy between what actually in the truck with the order will trigger the alert and the security will be noticed and stop the driver

Gate monitoring

Delivery truck GPS tracking• Real time GPS location

• Out of route alert, speed alert, emergency alert

• Customer smart phone tracking of their orders

eBox + BufferBox

• To business, we use eBox • To individual, we use BufferBox

BufferBox

Why deliver at night?

• No traffic at night

By 8 AM Delivery

What is a drop station?

Drop Station

Where we can ship to?

• Phase One, Ontario

Network Coverage

Phase Two

• International

Ship to world

Inventory visibility

• Check the real time inventory online

What if we have low inventory for specific items?

Our system will give you low inventory alert

• And place orders for those items in low inventory

• When the items arrive, we will unload to store them in the warehouse

• Then you will see our another technology – our system will guide the forklift driver to the first free spot

When we have the container coming from our supplier

• We do not do manual scan• We use gate monitoring, and all the items will

be in our system when the container pass the gate

Gate monitoring

No wasting time wondering, guide me to the 1st free spot near the gate

No need to move

• Our smart warehouse system knows all the locations of the parts, you do not need to move the pallets or reusable boxes to specific area, that save you lots of the forklift movements

Smart phone track

• Use your smart phone to scan and trace the lifespan of each part

• You know if the part is certified by us• We know who made the bad part

We care environment

• Best truck route – less CO2• Less forklift usage• Smart lighting – energy saving• Solar panel on the roof – generate green

power

Construction financing from Mann Engineering

• Mann Engineering has unrivaled engineering capability, technical expertise and the intellectual depth needed to design and implement efficiency, productivity and financial performance.

• Since 1988, Mann Engineering has conducted energy conservation programs in hundreds of buildings across Canada. We are a unique professional engineering company specialized in the energy management market. A leader in the energy management industry, Mann Engineering supplies technologies and engineering and construction services in commercial, institutional and industrial processes nationwide.

Our people – 100 local jobs

Revenue

• Membership fee• Sales through us• Provide our solutions to other

warehouses/business

Return on Investment

Company Structure

10 investment companies for phase one

• 3-4 foreign investors for each company• 3.5 to 4 million Canadian dollar investment for

each company

10 Company List

• OAPDC Tire Company• OAPDC Electric Parts Company• OAPDC Body Parts Company• OAPDC Engine Parts Company• OAPDC Brake Parts Company• OAPDC Transmission Parts Company• OAPDC Light and Signal Parts Company• OAPDC Trailer Parts Company• OAPDC Suspension Parts Company• OAPDC Warehouse Management Company

Thank You!

• Business inquiry please contact• Steve Xing • Phone 1-519-496-3078• Email cbp.info@gmail.com