2007 PICE NATIONAL CONVENTION

1

ONE-SIDE SLOPE ROAD: Alternative Scheme to Cut Cost

in Urban Road Projects

HENRY P. TURALDECollege of Engineering

Camarines Sur Polytechnic CollegesEmail: engineer_pluss@yahoo.com

Quotable Quotes

2007 PICE NATIONAL CONVENTION

2

“A man’s judgment is no better than his information”

- Bits and Pieces

Outline of the presentation

2007 PICE NATIONAL CONVENTION

3

Introduction The Typical Cross-section

Common Scheme : Cross Slope Alternative Scheme: One Side

Slope Designing the Storm Water Drainage

Using Box Culvert Using Pipe Culvert

Highlights on the Differences of the Common and Alternative Schemes

Conclusion

Introduction

2007 PICE NATIONAL CONVENTION

4

Land transportation Principal means of

transporting persons and goods

Road’s crucial role in economic development

Roads as priority infrastructure

Introduction

2007 PICE NATIONAL CONVENTION

5

THE PROBLEMCost – major

constraint in construction of road projects Materials Labor Equipments

Introduction

2007 PICE NATIONAL CONVENTION

6

Cost reduction considerations, one or combination as appropriate: Do away with non-essentials Eliminate duplicates Rid off redundant Reduce items of works Combine similar works Others

The Typical Cross Section

2007 PICE NATIONAL CONVENTION

7

slope slopeslope

slope

carriageway

drainage drainage

sidewalk sidewalk

Common Scheme:

Two-side slope or cross-slope

two drainage lines

The Typical Cross Section

2007 PICE NATIONAL CONVENTION

8

slope slopeslope

slope

carriageway

drainage drainage

sidewalk sidewalk

Common Scheme:

Two-side slope or cross-slope

two drainage lines

The Typical Cross Section

2007 PICE NATIONAL CONVENTION

9

slope

slope

slope

carriageway

drainage

sidewalksidewalk

Alternative Scheme:

One-side slope

one drainage line

(bigger)

Designing the Road’s Storm-Water Drainage

2007 PICE NATIONAL CONVENTION

10

where: Q = run-off rate C = coefficient of run-off I = average rainfall intensity Ad = drainage area

AdCIQ SRnv 21

32

)1(

where: v = flow velocity n = Manning’s roughness

coefficient S = slope R = hydraulic radius

)1( nQ Ac SR 2

13

2

where: Ac = cross-sectional area of flow

Designing the Road’s Storm-Water Drainage

2007 PICE NATIONAL CONVENTION

11

Ac = 0.7653 D2

P = 2.639 DR = Ac/P = 0.7653D2/2.639D = 0.29D

Ac = bd = 2d2 P = 2d + b = 2d + 2d = 4dR = Ac / P = 2d2 / 4d = ½ d

Using Box Culvert: Using Pipe:

Designing the Road’s Storm-Water Drainage

2007 PICE NATIONAL CONVENTION

12

Illustrative Example ApplicationGiven:

Length of the Road = 1000 m Width of the 2-lane road = 7 m

(consider 20 m including sidewalk, planting strip and other)

Distance between manholes = 50 m Coefficient of run-off = 0.85 Rainfall intensity = 224 mm/hr = 0.0622 mm/sec Roughness coefficient = 0.013 Slope = 0.005

Dimension of drainage linesUsing box culverts

13

Sta. up to Drain. AreaUse 2 culverts w/ dimension

(mm)Use 1 culvert w/ dimension

(mm)

km m2 b d b d

0 + 050 1,000 500 500 600 500

0 + 100 2,000 600 500 700 500

0 + 150 3,000 600 500 700 500

0 + 200 4,000 700 500 800 500

0 + 250 5,000 700 500 800 500

0 + 300 6,000 700 500 800 500

0 + 350 7,000 750 500 800 500

0 + 400 8,000 750 500 900 600

0 + 450 9,000 750 500 900 600

0 + 500 10,000 800 500 900 600

0 + 550 11,000 800 500 900 600

0 + 600 12,000 800 500 900 600

0 + 650 13,000 800 500 900 600

0 + 700 14,000 800 500 1,000 600

0 + 750 15,000 850 500 1,000 600

0 + 800 16,000 850 500 1,000 600

0 + 850 17,000 850 500 1,000 600

0 + 900 18,000 850 500 1,000 600

0 + 950 19,000 900 500 1,000 600

1 + 000 20,000 900 500 1,000 600

Using box culverts

Typical detail of box culvert excavation

O.D. + 0.6m

14

Dimension of drainage linesusing pipes

15Sta. up to Half-Q Diameter Use 2 pipes Full- Q Diameter Use 1 pipe

km m3/sec mm mm m3/sec mm mm

0 + 050 0.026 204 200 0.053 265 300

0 + 100 0.053 265 300 0.106 344 400

0 + 150 0.079 271 300 0.159 351 400

0 + 200 0.106 344 400 0.212 446 500

0 + 250 0.132 374 400 0.264 485 500

0 + 300 0.159 400 400 0.317 519 600

0 + 350 0.185 424 500 0.370 550 600

0 + 400 0.212 446 500 0.423 578 600

0 + 450 0.238 466 500 0.476 604 600

0 + 500 0.264 485 500 0.529 629 700

0 + 550 0.291 502 500 0.582 652 700

0 + 600 0.317 519 600 0.635 673 700

0 + 650 0.344 535 600 0.688 694 700

0 + 700 0.370 550 600 0.740 713 800

0 + 750 0.397 564 600 0.793 732 800

0 + 800 0.423 578 600 0.846 750 800

0 + 850 0.450 591 600 0.899 767 800

0 + 900 0.476 604 600 0.952 784 800

0 + 950 0.502 617 700 1.005 800 800

1 + 000 0.529 629 700 1.058 815 900

Using pipes

Typical detail of pipe culvert excavation

OD + 0.6m

16

Benefits of the Alternative Scheme

2007 PICE NATIONAL CONVENTION

17

slope

slope

slope

carriagewaysidewalksidewalk

Typical Cross-Section

One-Side Slope Road

Summary Comparison Quantities of drainage works

18

No. of Manholes = 2 [(1000/50) + 1] = 42

No. of Manholes = (1000/50) + 1 = 21

Manholes reduced = 42 -21 = 21 (50%)

For cross-slope:

For one-side slope:

2007 PICE NATIONAL CONVENTION

Benefits of the Alternative Schemeusing box culvert

2007 PICE NATIONAL CONVENTION

19

slope

slope

slope

carriageway

drainage

sidewalksidewalk

Typical Cross-Section

One-Side Slope Road

Summary Comparison Quantities of drainage works

20

USING BOX CULVERTS

2007 PICE NATIONAL CONVENTION

Excavation (m3) Backfill (m3) Concrete (m3) Steel (kg)

 Cross-slope 4,322.50 2,622.50 937.50 84,375.00

 One-side slope 2,493.13 1,428.25 562.88 50,658.75

Qty. Reduced 1,829.37 1,194.25 374.62 33,716.25

Reduced (%) 42.32% 45.54% 39.96% 39.96%

Benefits of the Alternative Schemeusing pipes

2007 PICE NATIONAL CONVENTION

21

slope

slope

slope

carriageway

drainage

sidewalksidewalk

Typical Cross-Section

One-Side Slope Road

Summary Comparison Quantities of drainage works

22

USING PIPES

2007 PICE NATIONAL CONVENTION

Excavation (m3) Backfill (m3) 

Cross-slope 2,256.00 1,827.96

 One-side slope 1,463.00 1,111.14 

Quantity reduced 793.00 716.82 

Reduced (%) 35.15% 39.21%

23

Diameter Cross-slope One-side Slope Reduction

(mm) Length (m) Length (m) Length (m) %200 100 - 100 100.00%300 200 50 150 75.00%400 300 100 200 66.67%500 500 100 400 80.00%600 700 200 500 71.43%

700 200 200 0 0.00%

800 - 300(300

addition) -

900 - 50 (50 addition) -Total 2000 1000 1000 -

Summary Comparison Quantities of drainage works

USING PIPES

2007 PICE NATIONAL CONVENTION

CONCLUSION

2007 PICE NATIONAL CONVENTION

24

One-side slope road as alternative scheme cuts down urban road project construction costs due to reduction of quantities of drainage works Excavation Backfill Manholes Conveyance materials

One-side slope road shortens project execution period Particularly underground works require extra

care Savings derived through this alternative scheme

Eventually be used to build other roads

Point to Ponder

2007 PICE NATIONAL CONVENTION

25

In time of scarcity, option is a luxury.

2007 PICE NATIONAL CONVENTION

26

THANK YOU.