Installation of Ormonde and Other Offshore Wind Farms

Mike Hulton- Project Manager

ode

1. Ormonde – Foundations

2. Ormonde – Cables

3. Ormonde – Making It Fit

4. Other UK Wind projects

5. Experience and Knowledge Transfer

6. America

Installation of Ormonde and Other Offshore Wind Projects

ode Overall Project Timeline: Ormonde UK

ode 1. Ormonde: Foundations

Finish it. Lift it. Barge it.

ode 1. Ormonde: Foundations

Design for Transportation and Installation

ode 1. Ormonde : Foundations

Design the Installation

ode

Safety. Engineering. Environment. Consents. Stakeholders. Contractors.

2. Ormonde: Export Cable

ode

Safety. Design. Logistics. Installation.

2. Ormonde: Inter Array Cables

ode

Safety. Neighbours. Switch On.

3. Ormonde: Integration

ode 3. Ormonde : Integration

A triumph of Integration

ode 3. Ormonde : Integration

Electrical Topsides Foundatn

Specify

Design

Supply

Install

Commissn

od

e

= By Project Manager ode

= By Electrical Contractor

= By Fabrication Contractor

= By Installation Contractor

N/A

od

e

od

e

od

e

od

e

od

e

od

e

od

e

od

e

od

e

N/A

N/A

N/A N/A

od

e

od

e

It starts with the procurement strategy.

ode

3. Ormonde: Integration

Design the Transportation…

ode 3. Ormonde: Integration

And then do it…

ode

3. Ormonde: Integration

3 major contractor interfaces…

ode 3. Ormonde: Integration

Wind and Weight Interfaces…

ode 4. Other UK Wind Projects

Southern North Sea

30 x 2MW Turbines

Project Management Contract

ode 4. Other UK Wind Projects

Solway Firth

60 x 3MW Turbines

Project Management

ode 5. Benefit of Experience

0

20

40

60

80

1 2 3 4 5 6 7 8

Cycle

Tim

e

Cost of learning new operation

Cost Saving on Next Project

ode

• 40 years experience in the Energy Sector.

• Head Office in London

• Hands-on experience

• Lessons Learned.

• Assign experienced engineers to American projects.

5. Knowledge Transfer

ode 5. Knowledge Transfer

Region Number of Wind Farms

UK

55

Europe 3

North America 2

ode

FEED

• Wind farm layout

• Export cable route

• HVDC link

• Turbine structures

• O & M Philosophy

• Support for Permits

& Consents

• CAPEX cost estimate

• OPEX cost estimate

6. North America: Naikun Wind - Canada

ode 6. North America: Baryonyx - Texas

• Layouts

• Power Export

• Schedule

• Cost Estimate

• Structure types

ode Who to contact

Mike Hulton [ode UK]

Tel : +44 (0) 208 481 4275

Cell: +44 (0)7795 074 813

Email : mike.hulton@ode-ltd.co.uk

Daniel Woodman [ode USA]

Tel : 1 720 542 9955

Cell : 1 303 330 6902

Email : daniel.woodman@ode-ltd.co.uk

www.ode-ltd.co.uk