Not ice of Intent (NOi) for coverage under Small MS4 General Permit Page 1 of 20
Part I: General Conditions
General Information
Name of Municipality or Organization: l._r _o_w_n_o_f_B_o_xf_o_rd _ ______________ _ __, State: '~M_A____~ EPA NPDES Permit Number (if applicable): IMA041184/MADEP
Primary MS4 Program Manager Contact Information
Name: IJohn Dold ITitle: IDPW Superintendent/Town Engineer Street Address Line 1: '~7_B_S_p_o_ff_o_rd_S_t_re_e_t________________________________~ Street Address Line 2:
City: lsoxford State:!~M_A____~I Zip Code: ! ~0_1_92_1_ _ ~ Email: ljdold@town.boxford.ma.us Phone Number: )(978) 352-6555
Fax Number: !(978) 352-5558
Other Information
Stormwater Management Program (SWMP) Location I t b f d(web add h . 11 . ·r I d d) www. own. ox or .ma.usress or p ysica ocat1on, 1 a rea y compIete : ~------ - --- -------------------'
Eligibility Determination
Eligibility CriteriaEndangered Species Act (ESA) Determination Complete? ~IY_e_s_~ (check all that apply): A DB [g]C Eligibility CriteriaNational Historic Preservation Act (NHPA) Determination Complete? Ives
~--~ (check all that apply):
[Z) Check the box if your municipality or organization was covered under the 2003 MS4 General Permit
MS4 Infrastructure (ifcovered under the 2003 permit)
E,t;mated Pe"ent ofO,tfall Map Complete? ~ If 100% of2003 ceq,;,ements oot met, eote,ao(Part II, Ill, IV or V, Subpart 8.3.(a.) of2003 permit)
0 estimated date of completion (MM/DD/YY): I I
Web address where MS4 map is published: lhttp://mvpc.maps.arcgis.com/apps/webappviewer/index.html?Ifoutfallmap is unavailable on the internet an electronic id=2fc91 befc6674005890d863dbe2e8f69 (for password contact John Dold by email)orpaper copyof the outfo/1 mop mu5I be included with I
NOi submission (see section Vfor submission options)
Regulatory Authorities (if covered under the 2003 permit)
Illicit Discharge Detection and Elimination (IDDE) Authority Adopted? EJ Effective Date or Estimated(Part II, Ill, IV or V, Subpart 8.3.(b.J of2003 permit) 105109106Date of Adoption (MM/DD/YY}: I Construction/Erosion and Sediment Control (ESC) Authority Adopted? EJ Effective Date or Estimated(Part 11,/J/,IV or V, Subpart 8.4.(a.) of2003 permit) 105109106Date of Adoption (MM/ DD/YY): IPost- Construction Stormwater Management Adopted? EJ Effective Date or Estimated(Part II, Ill, IV or V, Subpart 8.5.(a.) of2003 permit) 105109106Date of Adoption (MM/ DD/YY): I
Town of Boxford Page 2 of 20
Notice of Intent (NOi) for coverage under Small MS4 General Permit Part II: Summary of Receiving Waters
Please list the waterbody segments to which your MS4 discharges. For each waterbody segment, please report the number of outfalls discharging into it and, if applicable, any impairments.
Massachusetts list of impaired waters: Massachusetts 2014 List ofImpaired Waters- http://www.mass.gov/ eea/docs/dep/water/resources/ 07v5/l 4list2.pdf
Check off relevant pollutants for discharges to impaired waterbodies (see above 303(d) lists) without an approved TMDL in accordance with part 2.2.2.a of the permit. List any other pollutants in the last column, ifapplicable.
:rc c(ii,
Num ber of ,0 01 0. ..!.
0 -QI "' ::Ioutfalls into >< "' ..,Waterbody segment that receives flow from the MS4 >- 0 >, ·;; C "',0 ..::I V'I - .., QI
..c ,0 QI V'I 0 Other pollutant(s) causing impairments receiving water ~ C 0 >-Q. ii, ... QI .. I- .. ..,""0 ..c0 C,segment ·;: .. -> z! ,0 Cl Q. vi ~ 0 0 2 ~ V'I ..0 a1J "' "C ·- 0 .. QI.. 0 -·- J:I.. .., ....c ..c -~ 0 ..c 0 ::I Cu u 00 z 0 a. V'I I- u.i w
Ipswich River 4 Mercury in fisch tissue~ Mill River 2 Excess Algal Growth/ Non-native Aquatic plants
Parker River 2 low now alterations Chadwicks Pond Mercury in Fish Tissue
Fish Brook 6 No Impairment in 2014; Ecoli in 2016 303d listing ~ Penn Brook none
Bald pate Pond 5 Mercury in Fish nssue; Non-Native Aquatic Plants~ Lower Four Mile Pond 1 Non Native Aquatic Plants
Lowes Pond 4 Mercury in Fish Tissue; Non-Native Aquatic Plants Stevens Pond 2 Non-Native Aquatic Plants
Sperrys Pond 1 none Howes Pond 2 none Towne Pond 2 none
Four Mile Pond 3 none Pye Brook 2 nono
http:Waters-http://www.mass.gov
Town of Boxford Paae 3 o f 20
:r
-c
-ctNumber of Ill Q.1 en )( 0 41 "':,outfalls into >, >, C "':, uWaterbody segment t hat receives flow from the MS4 0 ·;; "'ftl Ill..c ... Ill >, u Other pollutant(s) causing impairmentsreceiving water 41 -0 :.! C 41 0 0C. ... I- ..."0 0 Ill :I 41 ..c usegment ·.:: ... -> .."' 0Cl C. -"' :a·- ...0 ~ VI ... c1l "0 ..c 41..c ..c ."!:: Vu u cc z 0 Q. Ill I- u.i wC .5! .5!
.!!? 0 "
..c"'0 =0 :,-
0 ...,
D
Click to lengthen tableII
Town of Boxford Page 4 of 20
Notice of Intent (NOi) for coverage under Small MS4 General Permit Part Ill: Stormwater Management Program Summary
Identify the Best Management Practices (BMPs) that will be employed to address each of the six Minimum Control Measures (MCMs). For municipalities/organizations whose MS4 discharges into a receiving water with an approved Total Maximum Daily Load (TMDL) and an applicable waste load allocation (WLA), identify any additional BMPs employed to specifically support the achievement of the WLA in the TMDL section at the end of part Ill.
For each MCM, list each existing or proposed BMP by category and provide a brief description, responsible parties/d epartments, measurable goals, and the year the BMP will be employed (public education and outreach BMPs also requires a target audience). Use the drop-down menus in each table or enter your own text to override the drop down menu.
MCM 1: Public Education and Outreach
Beginning BMP M edia/Category
(e nte r your own te xt to override the
d rop down menu) BMP Description Target ed Audience Responsible Department/Parties
(enter your own text to override the drop d o wn m enu) Measurable Goal
Year of BMP
lmple-mentation
Stormwater Informational
Displays/Posters/Kiosks
management system info displays at various public spaces/ Residents/Businesses/Developers
DPW/MVPC Merrimack Valley Stormwater Collaborative/Greenscapes
Posters & Display boards at locations to include Town
2018
events on pollution prevention
Hall, community building
2 messages over 5 years to each of the three targeted audience. (Note that Boxford does not
Brochures/Pamphlet, Public education print materials Residents/Businesses/ Developers
DPWIMVPC Merrimack Valley Stormwater Collaborative/Greenscapes have significant industry; targeted 2018
audiences are residents; commercial businesses & institutions; and developers.
Civic outreach events
Special Events/Festivals/fair< including display tables/info booth at Earth Day in Spring and Applefest in Fall
Residents Boxford Historical Society (Applefest event); Greenscapes, Board off 2 events per year B
Town of Boxford Paae 5 o f 20 1 day workshop
Incorporate annually to stormwater pollution elementary school School Curncula/Programs-Greenscapes Residents DPW/Grcenscapes Program/Spofford Pond School 2018 prevention education pupil audience @ into school curricula Spofford Pond
School
continuous PSA PSAs on stormwater
announcements Local Public Service Announcements DPW/Conservation Commission/Boxford Community Access lVpollution prevention Residents/ Businesses/Developers updated quarterly ason local cable access
needed G Continue Stormwater Committee meetings to guide policy Minimum of twoMeeting-Stormwater Committee DPW/Conservation & Planning/Health/Building Dept/fown Administ 2018Residents/Businesses/Developersupdates and SWMP meetings per year development & implementation
Post plans and stormwater resource
Update sitesinformation on townMerrimack Valley Stormwater website-Stori Residents/BusinessesDevelopers 2018 DPW/MVPC quarterly at and MVPC (construction)
minimummerrimackvalleystorm water.org website
Number of SitemapFocus on LID
views/ ResidentGreenscapes Social Media & WebPage Residents Greenscapes Program measures with Plans & testimonials on LID
Updates awareness G
I I I I I I I I I I I I I I I I I I I I
I I I I I I I I I I I I I
I I I I I
http:water.org
Town o f B oxfor d Paae 6 o f 20
I I I I I I1 1 1 1 I I I I I I
I I II I I I
Town ofBoxford
Notice of Intent (NOi) for coverage under Small MS4 General Permit Part Ill: Stormwater Management Program Summary (continued)
MCM 2: Public Involvement and Participation
Brief BM P Description BMP Categorization
Public Review
Public Participation
IPublic Participation
Public Review
Public Participation
I I I I I I
(enter your own text to override t he drop down menu)
ISWMP--
1
1Household haz. waste/used oil collection
!Catch Basin Stenciling/Markers
Bylaw Review and Update
Stream Clean Up Day/Earth Day
1 1
II 11
1 1
II II
Responsible Department/Parties (enter your own text to override the dropdown menu)
Stormwater Committee/DPW/MVPC
I Board or Health; Recycling CommiitteeII
I1DPW
StormwaterCommittee, Conservation Commission, Planning Board DPW, Board
DPW/Lakes Ponds & Streams Committee/Conservation Commission
1 1
II II II 1 1
11
Additional Description/ Measurable Goal
Allow annual review of stormwater management plan and posting of stormwater management p lan on website
1 town collection event
I each year at MASCO I Annual restenciling
operation
Allow public and departments opportunity to provide feedback on effectiveness of existing bylaw and potential update for compliance with new MS4 permit
Annual event with outreach opportunity to citizen volunteers in community day clean-up
Page 7 of 20
Beginning Year of
BMP lmple-
mentation
B I 2018 I I 2018 I
2019
B I
Town ofBoxfor d Paae 8 of 20
II I I I I I1 1 I I 1 1 I
II I I I I I I I
1 1 1 1 I I 1 1 I 11 1 I
I I
I I1 1 I !I I I I I I1 1
II I I1 1
Town of Boxford Page 9 of 20
Notice of Intent (NOi) for coverage under Small MS4 General Permit Part Ill:Stormwater Management Program Summary (continued)
MCM 3: Illicit Discharge Detection and Elimination (IDDE)
BMP Categorization (enter your own text to override the drop down menu)
550 inventory
Storm sewer system map
Written IDDE program
Implement IDDE program
Employee training
Conduct dry weather screening
Conduct wet weather screening
Ongoing screening
I I I
BMP Description
Develop 550 inventory in accordance ofpermit conditions
Create map and update during IDDE program completion
Create written IDDE program
Implement catchment investigations according to program and permit conditions
Train employees on IDDE implementation
Conduct in accordance with outfall screening procedure and permit conditions
Conduct in accordance with outfall screening procedure
Conduct dry weather and wet weather screening (as necessary)
I
I
I
Responsible Department/Parties (enter your own text to override the drop down menu)
IDPW/StormwlerCommittee
,~-IDPW with MVPC Stormwater Collaborative
1~-I
Beginning Year of
Measurable Goal BMP(all text can be overwritten)
Implementation
Complete within 1 year of ~
. effective date of permit ~ I
Update map within 2 years of Beffective date of permit and complete full system map 1 O 2019 years after effective date of
Ipermit Complete within 1 year of G the effective date of permit 2019
I. and update as required Complete 10 years after effect;,e date of pe,m;t
I G j Train annually
20, 9 1 1
Complete 3 years after effect;,e date of pe,m;t
I B I
Complete 10 years after effective date of permit
I Complete ongoing outfall screening upon completion
. of IDDE program
I I I
Town of 8oxford
I I I I I I I
ii I
I I
I II II II II I I I
I II I
I
I II I
I I I I I
I I I I I I
Paoe 10 of 20
IIIII
Town of Boxford
Notice of Intent (NOi) for coverage under Small MS4 General Permit Part Ill: Stormwater Management Program Summary (continued)
MCM 4: Construction Site Stormwater Runoff Control
BMP Categorization Responsible Department/Parties BMP Description (enter your own text to override the drop down m enu or entered t ext) (enter your own text to override the drop down menu)
Complete written Site inspection and enforcement of Erosion and Sediment procedures of site
DPW/Board ofHealth/ Building OepVCon,ervation Commission Control (ESC) measures inspections and enforcement procedures
Complete written procedures of site plan Site plan review OPW/ Board of Health/Building OepVComervation Commirnon review and begin implementation
Adoption of requirements for construction operators toErosion and Sediment Control DPW/Board of Health/Building Dept/Conservation Commission implement a sediment and erosion control program
Adoption of requirements to control wastes, including but not limited to, discarded Waste Control Budding Inspector building materials, concrete truck wash out, chemicals, litter, and sanitary wastes
I I l l I I I I I I I
Page 11 of 20
Beginning Year of
Measurable Goal BMP (all text can b e overwritten)
lmple-m entation
Complete within 1 year of the effective date of permit B Complete within 1 year of the effective date of permit B Complete within 1 year of the effective date of 2019 permit
Complete within 1 year of the effective date of 2019 permit
D D D D I I
Town of Boxford paqe 12 of 20
I I I I D I I I D I I I I D I I D
I I D i
I
I I I D II I D
Town of Boxford Page 13 of 20
Notice of Intent (NOi) for coverage under Small MS4 General Permit Part Ill: Stormwater Management Program Summary (continued)
MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment
Beginning Year of
BMP Categorization Responsible Department/ Parties Measurable Goal BMP Description BMP (enter your own text to override the drop down menu or entered text) (enter your own text to override the drop down menu) (all text can be overwritten)
lmple-mentation
The procedures to require submission of as-built drawings and Require submission of
As-built plans for on-site stormwater control ensure long term DPW/Boa,d ofHeallh/Building Dept/Conservation Commi,sion as-built plans for 2019 operation and completed projects maintenance will be a part of the SWMP
Identify at least 5 permittee-owned
Complete 4 years after properties that could be
effective date of permitTarget p roperties to reduce impervious areas modified or retrofitted DPW 2021 and report annually on
with BMPs to reduce retrofitted properties
impervious areas and update annually
Develop a report assessing existing local
Complete 4 years after regulations to determine
effective date of permitthe feasibility of makingAllow green infrastructure Planning Board/DPW/Conservation Commission and implement 2021green infrastructure
recommendations ofpractices allowable when
reportappropriate site conditions exist
Develop a report assessing requirements that affect the creation of impervious cover. The Complete 4 years after assessment will help effective date of permit
Street design and parking lot guidelines determine if changes to Planning Board/DPW and implement 2021 design standards for recommendations of streets and parking lots report can be modified to support low impact design options.
I
Town of Boxford Paae 14 of20
Ensure any stormwater controls or management Adoption, amendment, practices for new development and redevelopment meet or modification of a
Complete 2 years afterthe retention or treatment requirements of the permit regulatory mechanism to Stormwater Committc-c-/Conscrvation Commission/fown Meeting effective date of permitand all applicable requirements of the Massachusetts meet permit
Stormwater Handbook requirements B D
i D I I
I D D
I I D I D
D I D
I DI I D I D I
I
I D I D I D I D l D I D
Town of Boxford Page 15 of20
Notice of Intent (NOi) for coverage under Small MS4 General Permit Part Ill: Stormwater Management Program Summary (continued)
MCM 6: Municipal Good Housekeeping and Pollution Prevention
BMP Categorization (enter your own text to override the dropdown menu or entered t ext)
O&M procedures
Inventory all permittee-owned parks and open spaces, buildings and facilities, and vehicles and equipment
Infrastructure O&M
Stormwater Pollution Prevent ion Plan (SWPPP)
Catch basin cleaning
Street sweeping program
Road salt use optimization program
Responsible Department/Parties Measurable Goal BMP Description (enter your own text to override the drop down menu) (all text can be overwritten)
Create written O&M procedures including all requirements contained Complete and in 2.3.7.a.ii for parks and DPW implement 2 years after open spaces, buildings effective date of permit and facilities, and vehicles and equipment
IComplete 2 yeacs ofte, effect;ve dote of pe,m;tCreate inventory and implement annually
Establish and implement program for repair and IComplete 2 yeacs ofte,rehabilitation ofMS4 effechve dote of pe,m;t infrastructure
Create SWPPPs for maintenance garages, IComplete ond transfer stations, and ;mplement2 yeacsafte, other waste-handling effective date of permit facilit ies
Establish schedule for Clean catch basins on catch basin cleaning established schedule such that each catch
DPW and report number of basin is no more than catch basins cleaned 50% full and clean catch and volume ofmaterial basins on that schedule moved annually
Sweep all streets and Sweep all streets and permitee-owned parking permitee-owned lots in accordance with parking lots once per permit conditions I year in the spring Establish and implement Implement salt use a program to minimize optimization during the use of road salt I. deicing season
Beginning Year of
BMP Imple
mentation
2019
B BB
2019
2018
B B
http:2.3.7.a.ii
Town of Boxford paqe 16 0 f 20 Establish and implement Ilospectaad maiotaioInspections and maintenance of stormwater treatment inspection and trnatmeot st,uctu,es at1D~structures maitenance procedures
least annuallyand frequencies B
II l D I I I D I I I I I I I I D
II I I I I II I I I I I I I
I II
I I I I I I I I
Page 17 of 20Town of Boxford
Notice of Intent (NOi) for coverage under Small MS4 General Permit Part Ill : Stormwater Management Program Summary (continued)
Actions for Meeting Total Maximum Daily Load (TMDL) Requirements
Use the drop-down menus to select the applicable TMDL, action description to meet the TMDL requirements, and the responsible department/parties. Ifno options are applicable,
or more than one, enter your own text t o override drop-down menus.
Applicable TMDL Action Description Responsible Department/Parties
(enter your own text to override the drop down menu)
!Not Applicable for Town of Boxford I I I I I I
I I I
I I I I
I I I I
I I I I I
I I I
I I I I
I I I I
I I I I
I I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I
I I I I
I I I I
Town ofBoxford Page 18 of 20
Notice of Intent (NOi) for coverage under Small MS4 General Permit Part Ill: Stormwater Management Program Summary (continued)
Actions for Meeting Requirements Related to Water Quality Limited Waters
Use the drop-down menus to select the pollutant causing the water quality limitation and enter the waterbody ID(s) experiencing excursions above water quality standards for that pollutant. Choose the action description from the dropdown menu and indicate the responsible party. Ifno options are applicable, or more than one, enter your own text to override drop-down menus.
Responsible Department/PartiesPollutant Waterbody ID(s) Action Description (enter your own text to override the drop down menu)
I I I I I I I I I I I I I I I I I I I I I I I I II I Ii I I I
II I I II I I I I I I I I I I I I r I I
I I I I I
I
I
I
I
I
I
I
I
I
I
I
I
Notice of Intent (NOi) for coverage under Small MS4 General Permit Page 19 of 20 Part IV: Notes and additional information
Use the space below to indicate the part(s) of 2.2. 1 and 2.2.2 that you have identified as not applicable to your MS4 because you do not discharge to the impaired water body or a tributary to an impaired water body due to nitrogen or phosphorus. Provide all supporting documentation below or attach additional documents if necessary. Also, provide any additional information about your MS4 program below.
•screening Process for Effect on Historic Properties & Determination. See Letter attached
*USFWS Effects Determination. See letters attached.
Notice of Intent (NOi) for coverage under Small MS4 General Permit Page 20 of 20
Part V: Certification
I certify under penalty oflaw that this document and all attachments were prepared under my direction orsupervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry ofthe person orpersons who manage the system, or those persons directly responsible for gathering the information, I certify that the information submitted is, to the best ofmy knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility offine and imprisonment for knowing violations.
Name: 'Alan Benson Title: !Town Administrator
Date: IB-3t-/8I
Note: When prompted during signing, save the document under a new file name
TOWN OF BOXFORD Off ice of the Board of Selectmen
7A Spofford Road Boxford, MA 01921
www.town.boxford.ma.us Tel: (978) 887-6000 Ext. 502 August 28, 2018 Fax: (978) 887-5361
To: File
From: Alan Benson
Re: Documentation ofTown of Boxford' s Deterrn ination of"No Affect" on Endangered Species or Critical Habi tat of Boxford's MS4 Stonnwater Management Program
The Town of Boxford is planning an updated Storrnwater Management program for compliance with the
Municipal Separate Storm Sewer System (MS4) Permit issued by EPA and MassDEP effective July 20 I 8 for urbanized communit ies in the Commonwealth.
As part of the plann ing review of five-year activities, the Town of Boxford through its Storm water
Committee has reviewed resource lists provided by the U.S. Fish and W ildlife Service and has determ ined that the Town's Stormwater program meets Criteria C for coverage by the MS4 Perm it.
1) The Town's MS4 area contains the Northern Long-Eared Bat, o ne of the USFWS listed species; 2) The Town's Stormwater Committee in its program assessment has determined the stormwater
fac ilities managed under the permit are existing fac ilities authorized by the previous permit and that activities proposed under the Town' s MS4 management & maintenance program are not anticipated to impact endangered species or critical hab itat. EPA has documented consu ltation
on the Massachusetts MS4 Program by letter from the USFWS New England Field Office dated
January 8, 2018; and 3) The Town agrees that d uring the MS4 permit term, if the Town plans to install a structura l BMP
not identified in the Program Notice o f Intent, the Town will conduct an endangered species
screening for the proposed s ite and contact the USFWS if a proposed new activity "may affect" or
is " not 1 ikely to adversely affect 1 isled species or critica l habitat under the jurisdiction of the
USFWS.
Based on the Stormwater Comm ittee ' s review as documented in the NOi preparat ion, I certify on behalf of the Town of Boxford the e ligibility of the Town's MS4 Program Permit to use Eligibility Criterion C
ten or MS4 perm it coverage for Endangered Species Act Determination.
Alan J. Benson Town Admin i rator/CPO
TOWN OF BOXFORD Office of the Board of Selectmen
7 A Spofford Road Boxford, MA 01921
www.town.boxford.ma.us Tel: (978) 887-6000 Ext. 502 Fax: (978) 887-5361
August 28, 2018
To: File
From: Alan Benson
Re: Historic Properties Effect Determination of Boxford's MS4 Stormwater Management
Program
The Town of Boxford is planning an updated Stormwater Management program for compliance
with the Municipal Separate Storm Sewer System (MS4) Permit issued by EPA and MassDEP effective. July 2018 for urbanized communities in the Commonwealth.
As parl of the planning review of five-year activities, the Town ofBoxford through its Stormwater Committee has determined that stormwater facilities managed under the permit are existing fac ilities autho rized by the previous permit and that activities proposed under the Town's MS4 management & maintenance program are not anticipated to involve subsurface land
disturbance.
Based on the Committee' s review, I certify on behalf of the Town of Boxford the e lig ibility of the Town' s MS4 Program Permit to use Criterion A in our Notice of Intent for MS4 permit coverage, whereby municipal stormwater discharges do not have the potential to cause effects on
historic properties.
n Town A n inistrator/CPO
From: Ross Povenmire To: John Dold; Kozminski, Michelle Cc: Jerrard Whitten; jcosgrove@mvpc.org; Alan Benson Subject: RE: Small MS4 NOI submission - additional or corrected information required Date: Friday, September 28, 2018 9:22:31 AM
Hello John, Michelle,
In response to the EPA query below I offer the following:
1) Here is a hyperlink to the Boxford MIMAL program. On it you will find a "Drainage System" layer, make sure that is checked. You must zoom in to find the outfall icons. There are not many of them. An example is south of the three way intersection of Elm Street, Topsfield Road and Main Street: http://mimap.mvpc.org/map/index.html? viewer=Boxford
Please let me know if you cannot access the MIMAP program. The Merrimack Valley Planning Commission is working with us to make this available to the public without a password.
2) There are no structures identified as "discharges" per se on Chadwick's Pond. There are two equalizing culverts across Lily Pond Drive. One side of each of these culverts opens to Chadwick's Pond, the other side of these two culverts opens to ponded areas on the south side of Lily Pond Drive, and the culverts are partially submerged in normal conditions.
3) Penn Brook in no longer located in Boxford, despite what is shown on the USGS map (Ipswich Quadangle). Baldpate Pond has grown over time to encompass former wetland area as far as the power line ROW. The town boundary between Boxford and Georgetown was relocated in this area so that this portion of the pond is now in Georgetown (a fact not reflected on the USGS map). Penn Brook begins at the outfall of a culvert underneath the power line ROW. This outfall is located in the Town of Georgetown.
Ross
mailto:JDold@town.boxford.ma.usmailto:kozminski.michelle@epa.govmailto:jjwhitten@mvpc.orgmailto:/o=ExchangeLabs/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=usere85c74b4mailto:ABenson@town.boxford.ma.ushttp://mimap.mvpc.org/map/index.html?viewer=Boxfordhttp://mimap.mvpc.org/map/index.html?viewer=Boxford
MA_Boxford_NOI_8_31.pdfRE_ Small MS4 NOI submission - additional or co...