13 January 08 - old hospital13 January 08 - old hospital will become a research will become a research

centercenter

13 January 08 - new hospital13 January 08 - new hospital

13 January 08 – workers 13 January 08 – workers officesoffices

20 January 08 – the walls go20 January 08 – the walls go upup

7 February 08 – and up7 February 08 – and up

7 February 087 February 08

6 March 08 – starting to take6 March 08 – starting to take shapeshape

9 March 089 March 08

16 March 08 - “It's going to rain”16 March 08 - “It's going to rain”

16 March – just bales on 16 March – just bales on walls . . .walls . . .

30 March 08 – then they are 30 March 08 – then they are renderedrendered

30 March 0830 March 08

3 April 08 – view from zoo 3 April 08 – view from zoo carparkcarpark

3 April 08 - insulation3 April 08 - insulation

17 April 08 – out back is a 17 April 08 – out back is a mess mess

17 April 0817 April 08

17 April 0817 April 08

17 April 08 – looking through17 April 08 – looking through from the from the

outsideoutside

17 April 08 – around reception17 April 08 – around reception

17 April 08 – the public area17 April 08 – the public area

17 April 08 – conference room17 April 08 – conference room

17 April 08 – turtle window17 April 08 – turtle window

17 April 08 – Hall ceiling17 April 08 – Hall ceiling

17 April 08 – main surgery17 April 08 – main surgery has rammed has rammed

earth wallsearth walls

27 April 08 – coming along 27 April 08 – coming along

8 May 08 – the drain out front8 May 08 – the drain out front

8 May 08 – walls go up 8 May 08 – walls go up

8 May 08 – turtle picture on a 8 May 08 – turtle picture on a straw balestraw bale

8 May 08 – bamboo walls &8 May 08 – bamboo walls & rammed-earth rammed-earth

wallswalls

8 May 08 – Gail & John's 8 May 08 – Gail & John's office office

8 May 08 – looking down hall8 May 08 – looking down hall

8 May 08 – Necropsy room8 May 08 – Necropsy room

8 My 08 – volunteers room

8 May 08 – straw ceiling slats8 May 08 – straw ceiling slats

8 May 08 – laundry8 May 08 – laundry

8 May 08 – out the back once8 May 08 – out the back once moremore

12 June – outside public area12 June – outside public area

12 June 08 12 June 08

12 June 08 – side12 June 08 – side

12 June 08 – ambulance 12 June 08 – ambulance drivedrive

12 June 08 – loading bay12 June 08 – loading bay

26 June 08 26 June 08

26 June 08 – laying bitumen26 June 08 – laying bitumen

29 June 0829 June 08

3 July – new ambulance drive3 July – new ambulance drive

10 July 08 – concrete being10 July 08 – concrete being pumpedpumped

10 July 08 10 July 08

10 July – out the back once 10 July – out the back once moremore

17 July 08 – wire fence is 17 July 08 – wire fence is gone gone

17 July – air conditioning 17 July – air conditioning units units

17 July 08 17 July 08

3 August – the walkway goes 3 August – the walkway goes in in

3 August 08 - wheelie bin 3 August 08 - wheelie bin areaarea

3 August 08 – the completed 3 August 08 – the completed ambulance drive ambulance drive

3 August 08 – outside 3 August 08 – outside volunteer,volunteer, bird & reptile bird & reptile areas areas

14 August 08 14 August 08

14 August 0814 August 08

- design on - design on doorsdoors

14 August 0814 August 08

- Gail's - Gail's handshands

holding a holding a possumpossum

joeyjoey

14 August 08 – the bushes 14 August 08 – the bushes getget

removed . . . removed . . .

14 August 08 14 August 08

14 August 08 – and a garden14 August 08 – and a garden goes in goes in

21 August 08 – going in the21 August 08 – going in the front door front door

21 August 0821 August 08

- lizard door - lizard door handleshandles

21 August 08 - reception21 August 08 - reception

21 August - looking into 21 August - looking into surgerysurgery

21 August 08 – and the 21 August 08 – and the nurserynursery

21 August 08 – bamboo ceiling21 August 08 – bamboo ceiling in public areain public area

21 August 08 – conference 21 August 08 – conference roomroom

21 Augus08 – Theatre21 Augus08 – Theatre

21 August 08 – staff room21 August 08 – staff room

21 August 08 - neocropsy21 August 08 - neocropsy

21 August – a bit of painting 21 August – a bit of painting

21 August 08 – volunteers 21 August 08 – volunteers roomroom

21 August 08 - pathology21 August 08 - pathology

21 August 08 – looking into 21 August 08 – looking into public areapublic area

21 August 08 – that air-21 August 08 – that air- conditioningconditioning unit unit

21 August 08 – the old sign is 21 August 08 – the old sign is removed,removed,

and . . .and . . .

28 August – a new sign goes 28 August – a new sign goes upup

28 August 08 – the back is 28 August 08 – the back is ready for turf ready for turf and a fenceand a fence

28 August - the turf gets laid28 August - the turf gets laid

28 August 08 – the front is 28 August 08 – the front is fertilized . . .fertilized . . .

28 August 08 – then turfed28 August 08 – then turfed

31 August 08 – the giant31 August 08 – the giant handshands

31 August 08 – front entrance31 August 08 – front entrance

11 September – and again11 September – and again

11 September – Red-back in11 September – Red-back in garden-bed garden-bed

11 September - surgery11 September - surgery

11 September – animal food11 September – animal food preparation roompreparation room