Post on 22-Jan-2018
Network Basics Infrastructure setup
About Me
• Electronics and Telecommunication Engineer from Symbiosis, Pune
• Internship for six months with a SP
• Third Party Network Operation Manager at HDFC Bank Ltd.
• Cisco Certified Network Associate
Packet flow for Ping Command
Network Architecture of Telecom Operators
Construction Team
• Tower structure and quality
• Types of towers:-
1. Roof Top Tower (RTT)
2. Roof Top Pole (RTP)
3. Ground Based Tower (GBT)
4. Ground Based Mast (GBM)
Fiber Team
• Road walk survey
• Trenching and Ducting
• Manhole installation
• DIT – Duct Integrity Test
• Fiber Blowing
• Splicing
• Optical Testing
Microwave Team
• Connectivity from the
nearby tower
• Works at microwave range
of frequencies around 6 to 8 GHz and
12 to 18 GHz
(Type 1 and Type 2)
• Horizontal and Vertical
propagation
Router Team
• Configuring
• Update
• Troubleshooting
BTS Team
BTS Team ATP-11B
• Speed testing for all 3 sectors,
alpha, beta and gamma.
O&M Team-Utility
O&M Team-Maintenance
• HOTO sites maintenance
• LSMR software for tower status monitoring
• Fiber Team
• Technicians for issues
Presented by: RAHUL RATNAKAR