Firstly we login desktop PNMT Icon then OK

User name: admin User name: admin then PNMT(USB) then login then PNMT(USB) then login

When connect IDU then we go to When connect IDU then we go to configuration then equipment setupconfiguration then equipment setup

At first maintenance onAt first maintenance on

From equipment setup we From equipment setup we go to setup then configurego to setup then configure

TX-Power setup hereTX-Power setup here

Put Frequency herePut Frequency here

Capacity ,modulation, frame id Capacity ,modulation, frame id setup heresetup here

Receive level show –Receive level show –process-1process-1

Tx-power and receive level Tx-power and receive level show-2show-2

Port check-1Port check-1

Port check-2(enable and Port check-2(enable and disable)disable)

IP-File configureIP-File configure

User InterfaceUser Interface

NTFS setupNTFS setup

LAN Port UsageLAN Port Usage

At last antenna alignment Mode At last antenna alignment Mode On before start alignmentOn before start alignment

INSTRUCTION SHOULD FOLLOW INSTRUCTION SHOULD FOLLOW BEFORE & AFTER ALIGNMENTBEFORE & AFTER ALIGNMENT

• After complete commissioning must ‘antenna alignment mode ON’

• During alignment IDU should not switched Off.

• After complete alignment then must be ‘Alignment mode OFF’

•THANK YOU