NEARS Class I Rail Network Capacity · 2015-10-23 · 4 There are 4 primary components to rail...

Post on 12-Apr-2020

0 views 0 download

Transcript of NEARS Class I Rail Network Capacity · 2015-10-23 · 4 There are 4 primary components to rail...

NEARSClass I Rail Network Capacity

2 October 2014

NEARSClass I Rail Network Capacity

2 October 2014

22

What is Capacity?

Capacity is the amount of stuff we can move between Origin and Destination

33

We can increase capacity by…..We can increase capacity by…..

Putting more trains on each route

Putting more stuff in each car

Putting more cars on each train

44

There are 4 primary components to rail system capacity:

— Locomotives— Equipment (cars)— People— Network (infrastructure)

These are tied together by processes

Capacity has to be a balanced approachCapacity has to be a balanced approach

CSXT has adapted a concept of “Network Capability”.

“Capability” incorporates the idea of capacity at a given service level.

55

CSXT’s Network is the network of rail lines and facilities over which CSXT can operate to provide serve to our customers.

The CSXT NetworkThe CSXT Network

66

The Network — Consists of very long term, fixed assets — Makes each railroad company unique

The Network determines where we go and whowe serve.

The capabilities and attributes of thecomponents of the Network determine theservice we can provide.

The CSXT NetworkThe CSXT Network

77

The CSXT Network The CSXT Network

New England

New Orleans

Memphis

Chicago

Mid-Atlantic

Miami

Montreal

Charleston

Serving 23 statesand two-thirdsof the U.S. population

88

The CSXT Network is part of the North American rail networkThe CSXT Network is part of the North American rail network

CSXT is one of 7 Class I freight railroads that operate in North America

50% of CSXT traffic interchanges with other railroad— 6 other Class I’s— 240 shortlines and regionals— Interline capabilities are critical to the total rail service

product

99

BNSF and NSBNSF and NS

Cincinnati

The CSXT Network is part of the North American Rail Network

UPBNSFCNKCS

CSXTNSCP

1010

U.S. rail freight route densitiesU.S. rail freight route densities

1111

The CSXT Network The CSXT Network

1212

Certain Core Routes Create Key Service CorridorsCertain Core Routes Create Key Service Corridors

Core Routes

The Water Level Route

I-95Corridor

Southeast Corridor

Coal

Northern Tier is CSXT’s route to the NortheastNorthern Tier is CSXT’s route to the Northeast

Northern Tier includes:— Chicago Terminal— Water Level Route— River Line— St. Louis / Indianapolis Lines— B&O Route to Mid-Atlantic

Critical to CSX’s network:— Heaviest Train Volumes— Largest Growth— Premium Service

Includes key east-west gateways — Chicago and St. Louis— 50% of all Interchange Volume

1313

St Louis

Indianapolis

ChicagoToledo

Newark

CincinnatiAvon

Willard

Cumberland

E St. Louis

Selkirk

Philadelphia

CSXT Hump Yards Double TrackSingle TrackNW Ohio

CSXT Northern Tier Geography

CSXT’s Northern Tier continues to experience growthCSXT’s Northern Tier continues to experience growth

Northern Tier has seen 17% GTM growth since March

1414

20 Million10 Million5 Million

Volume Increase

(Gross Tons)

Chicago

St Louis

Boston

New YorkPhiladelphia

Baltimore

Buffalo Albany

2014 March-SeptemberGrowth Strongest in North

1515

How does CSXT plan capacity and investments?How does CSXT plan capacity and investments?

Capability(supply)

Where does forecasted demand exceed capability?

Forecast(demand)

Capability improvement

Options

Process Ops Plan

ResourcesCapital Investment

Op Changes

CapitalPlanning

It is all about matching supply to demand

1616

Customer forecasts— specific forecasts by location / commodity

National freight shifts— crude oil, coal…

Competitor position — fuel prices, driver shortages…

International impacts

How do we plan capacity and investmentsHow do we plan capacity and investments

It starts with a forecast:

Northern Tier: Cumulative network impact methodologyNorthern Tier: Cumulative network impact methodology

1717

Garrett +X

WidgetsGadgetsStuffDohickies

Mohawk +Y

River Line+Z

Service and Capacity combine into the concept of Line Of Road “Capability”

Service and Capacity combine into the concept of Line Of Road “Capability”

1818

40

35

30

25

20

15

10

5

0

Trai

ns p

er d

ay

“Ideal operationscurve”

“Density”

The wider the scatter the greater the operational variability

Inflection point

1919

40

35

30

25

20

15

10

5

0

Trai

ns p

er d

ay

“Density”

Acceptable Service Zone??

Service and Capacity combine into the concept of Line Of Road “Capability”

Service and Capacity combine into the concept of Line Of Road “Capability”

Increasing Capacity shifts the curveIncreasing Capacity shifts the curve

2020

40

35

30

25

20

15

10

5

0

Trai

ns p

er d

ay

“Density”

Terminals requires analogous capacity analysesTerminals requires analogous capacity analyses

2121

St Louis

Indianapolis

Chicago ToledoNewark

CincinnatiAvon

Willard

Cumberland

E St. Louis

Selkirk

Cleveland

Philadelphia

Classification volumes

Inspection requirements

Fueling functions

Crew Changes

Train staging

Columbus

Cincinnati

CSXT Historical Line of Road Investments (‘05-’14)CSXT Historical Line of Road Investments (‘05-’14)

New NW OHIntermodal terminal

New England clearances

River Line LOR capy

SE Corridor lineof road capacity

New unit train inspection yard

FL Corridor Shift

National Gateway clearances

Port of NYclearances

Cincinnati

CSXT Current Focus of Northern Tier InvestmentsCSXT Current Focus of Northern Tier Investments

Northern Tier terminal andLine of Road capacity

River Line & Trenton Line lineof road capy

National Gateway clearances

2424

Questions Questions