National Aeronautics and Space Administration

www.nasa.gov

NASA’s Space Launch System:Exploration Beyond Earth’s Orbit

May 2012

Todd A. May, Program ManagerGarry M. Lyles, Chief EngineerJoan (Jody) A. Singer, Deputy Program ManagerDavid E. Beaman, Spacecraft and Payload Integration ManagerStephen D. Creech, Strategic Development Manager

https://ntrs.nasa.gov/search.jsp?R=20120014548 2020-05-20T08:21:40+00:00Z

Todd May, Program ManagerNASA’s Vision and Mission

8200_T.May_GLEX.2www.nasa.gov/sls

“Extend and sustain human activities across the solar system.”NASA 2011 Strategic Plan

SLS Launches in 2017

8200_T.May_GLEX.3www.nasa.gov/sls

Earth

International Space Station

Near-Earth Asteroid

Mars

Lagrange Points

Moon

Saturn

Jupiter

The Future of Exploration

8200_T.May_GLEX.4www.nasa.gov/sls

My desire is to work more closely with the human spaceflight program so we can take advantage of synergy…. We think of the SLS as the human spaceflight program, but it could be hugely enabling for science.

— John Grunsfeld, Associate Administrator NASA Science Mission Directorate

Nature, Jan 19, 2012

Initial Exploration Missions (EM)EM-1 in 2017

• Un-crewed circumlunar flight – free return trajectory• Mission duration ~7 days• Demonstrate integrated spacecraft systems

performance prior to crewed flight• Demonstrate high speed entry (~11 km/s) and

Thermal Protection System prior to crewed flight

8200_T.May_GLEX.5www.nasa.gov/sls

EM-2 no later than 2021• Crewed lunar orbit mission• Mission duration 10–14 days

NASA’s Space Launch SystemVital to NASA’s exploration strategy and the Nation’s space agenda.

Key tenets: safety, affordability, and sustainability

System Requirements Review/System Definition Review in progress

Partnerships with NASA Exploration Systems Development (Headquarters), Orion and Ground Operations Programs, and Centers

Prime contractors on board, engaging the U.S. aerospace workforce and specialized infrastructure

Turning plans into progress: Design and development work moving forward today, to deliver an unsurpassed capability that launches in 2017

8200_T.May_GLEX.6www.nasa.gov/sls

On Track for First Flight in 2017

Garry Lyles, Chief EngineerThe SLS Design

8200_T.May_GLEX.7www.nasa.gov/sls

SLS Architecture Block Upgrade Approach

8200_T.May_GLEX.8www.nasa.gov/sls

Payload Fairings

Launch Abort System

SolidRocket

Boosters

Block 170 t

321 ft.

Block 2130 t

384 ft.

Upper StagewithJ-2X

Engines

AdvancedBoosters

OrionInterim Cryogenic

Propulsion Stage (ICPS)

Core StageCore Stage

Block 1A105 t

314 ft.

27.5 ft. (8.4 m)

Starting with Available Assets and Evolving the Design

27.5 ft. (8.4 m)

RS-25 Core Stage Engines(Space Shuttle Main Engines)

SLS 70 Metric Tons: First Flight 2017

8200_T.May_GLEX.9www.nasa.gov/sls

Launch Abort System

70 t318 ft.

Orion Multi-Purpose Crew Vehicle (MPCV)

INITIAL CAPABILITY, 2017–21

Core Stage/Avionics(Boeing)

Core Stage Engines (RS-25)(PWR)

5-Segment Solid Rocket Booster (SRB)

(ATK)

Interim Cryogenic Propulsion Stage (ICPS)

• MPCV Stage Adapter• Launch Vehicle Stage Adapter

8200_T.May_GLEX.10www.nasa.gov/sls

SLS will launch from Kennedy Space Center in 2017

Ascent Mission Profile: SLS/Orion

8200_T.May_GLEX.11www.nasa.gov/sls

Core Stage Engine CutoffTime (sec) 475.2Maximum Acceleration

Launch

Maximum Dynamic PressureTime (sec) 76.4Altitude (ft) 48,189Mach 1.84

SRB SeparationTime (sec) 128.4Altitude (ft) 141,945Mach No. 4.33

Maximum Boost Stage Axial AccelerationTime (sec) 110.4Mach No. 3.9

Liftoff + 0.6 secTime (sec) 0.6

Payload SeparationTime (sec) MECO + 30 sec

(Not To Scale)At IgnitionTime (sec) 0.0Weight (lb) 5,795,338

LAS JettisonTime (sec) 158.4Altitude (ft) 193,530Mach No. 4.9

Core Stage Pacific

Splashdown5579 sec(1.5 hrs)

Tower Clear & Initiate

Roll/Pitch Maneuver

9 sec

Roll Maneuver places astronauts in heads-down position

Gravity Turn minimizes aero loads on vehicle and uses Earth G to turn vehicle horizontal

SRB Atlantic Splashdown

331 sec(5.5 min)

SLS: Being Built Today

8200_T.May_GLEX.12www.nasa.gov/sls

Meeting with Space Campers at U.S. Space & Rocket Center, Huntsville,

AL, Feb 2012.

RS-25 Core Stage Engine in the KSC Engine Processing Facility,

2011.

Installing the J-2X powerpack in test stand at SSC.

Stages Industry Day at Michoud Assembly Facility, New Orleans,

Nov 2011.

First ring forging prepared for Orion Stage Adapter, Cudahy, WI, April 2012.

Solid Rocket Booster development motor test, Promontory, Utah, Sep 2011.

KSC is preparing Launch Complex 39B for SLS/Orion operations, 2012.

J-2X Upper Stage Engine powerpack test, Stennis Space Center (SSC), MS, Feb 2012.

Jody Singer, Deputy Program ManagerHardware Progress

8200_T.May_GLEX.13www.nasa.gov/sls

8200_T.May_GLEX.14www.nasa.gov/sls

RS-25 Engines received atStennis Space CenterApril 2012

100% Success

Rate

8200_T.May_GLEX.15www.nasa.gov/sls

5-Segment Solid Rocket Booster

8200_T.May_GLEX.16www.nasa.gov/sls

Development Motor Test 3ATK Promontory, Utah Test Site, September 8, 2011

8200_T.May_GLEX.17www.nasa.gov/sls

Avionics and controls for SLS booster readying for Flight Control Test 1 atATK’s test facility in Promontory, Utah, March 28,2012

8200_T.May_GLEX.18www.nasa.gov/sls

J-2X Upper Stage Enginereadying for testing at Stennis Space CenterMarch 2012

8200_T.May_GLEX.19www.nasa.gov/sls

First J-2X development engine on the A-2 Test Standat Stennis Space CenterApril 20, 2012

Marshall Space Flight Center’s Michoud Assembly Facility

One-of-a-Kind Infrastructure Asset8200_T.May_GLEX.20www.nasa.gov/sls

Stages and Avionics

8200_T.May_GLEX.21www.nasa.gov/sls

Core Stage

Upper Stage

SLS Commonalities

8200_T.May_GLEX.22www.nasa.gov/sls

70 ton Payload(Block 1)

130 ton Payload (Block 2)

Core Stage work directly appliesto Upper Stage:• Same diameter (27.5 ft.) and basic design• Manufacturing facilities, tooling, materials, and

processes/practices• Workforce• Supply chain/industry base• Transportation logistics• Ground systems/launch infrastructure• Propellants

Core Stage

Payload Interfaces:• Mechanical• Avionics• Software

RS-25 Core Stage Engines

David Beaman, Spacecraft and Payload Integration ManagerAdapters and Fairings

8200_T.May_GLEX.23www.nasa.gov/sls

Exploration Flight Test-1 Mission Overview

8200_T.May_GLEX.24

8200_T.May_GLEX.25www.nasa.gov/sls

Orion MPCV Stage Adapter

www.nasa.gov/sls 8200_T.May_GLEX.26

First ring forging preparation by ATI/Ladish Forging, Cudahy, Wisconsin, April 2012

Crew application

Cargo application

Orion

Payload Adapter30 ft. (10 m)

27.5 ft. (8.4 m)

Payload FairingsLaunch Abort System

Interim Cryogenic Propulsion Stage

• MPCV Stage Adapter• Launch Vehicle Stage

Adapter

SolidRocket

Boosters

Upper StagewithJ-2X

Engine

Liquidor

SolidRocket

Boosters

Orion

Core Stage

RS-25(Space Shuttle Main Engines)

INITIAL CAPABILITY, 2017–21 EVOLVED CAPABILITY, Post-2021

8200_T.May_GLEX.27www.nasa.gov/sls

Steve Creech, Strategic Development ManagerMission Capabilities

8200_T.May_GLEX.28www.nasa.gov/sls

A National Asset for Stakeholders and Partners

8200_T.May_GLEX.29www.nasa.gov/sls

SLS —Going Beyond Earth’s Orbit

Block 1 ICPS

8200_T.May_GLEX.30www.nasa.gov/sls

Payl

oad

Syst

em M

ass

(mt)

C3 (km2/s2)

30.0

25.0

20.0

15.0

10.0

5.0

0.0-20 0 20 40 60 80 100 120 140 160 180

Sola

r Pro

be

Jupi

ter/E

urop

a

Mar

s

Luna

r

Human Space Flight

8200_T.May_GLEX.31www.nasa.gov/sls

Human Mission to Mars

8200_T.May_GLEX.32www.nasa.gov/sls

Safe, Affordable, Sustainable8200_T.May_GLEX.33

SLS Performance = Affordability

Less Risk Less ExpensiveMission Operations

Increased Design Simplicity

Increased Mission

Reliability and Confidence

Increased lift capacity High energy orbit Volume and mass capability

Volume and mass capability

Increased payloadmargin

Shorter trip times Increased design simplicity

Fewer deployments and critical operations

www.nasa.gov/sls

The Ice of Europa

8200_T.May_GLEX.34www.nasa.gov/sls

Enceladus Orbiter

8200_T.May_GLEX.35www.nasa.gov/sls

For More Info: www.nasa.gov/sls

www.nasa.gov/sls 8200_T.May_GLEX.36Building a Platform for Global Space Exploration

Somewhere, something incredibleis waiting to be known.— Carl Sagan

www.nasa.gov/sls 8155_Marshall Association.37