Monthly Stakeholder Presentation
June 24, 2020
2
This PowerPoint presentation was prepared by the Florida Department of Transportation (FDOT) staff and has been made available to the public as part of public records access. Any dissemination of this presentation by anyone or entity
other than FDOT staff is not official. Any questions can be sent to FDOT-D6PIO@dot.state.fl.us.
This presentation may not be altered.
* This schedule does not reflect days added to the contract for
holidays, weather days or special events
3
UPCOMING & ONGOING CONSTRUCTION ACTIVITIES
• Ongoing nighttime closure on
I-95 from NW 8 Street to NW
29 Street for concrete
replacement activities
• Concrete replacement
ongoing on the northbound
lanes
• Saw cutting of existing
pavement ongoing in the
southbound lanes
* This schedule does not reflect days added to the contract for
holidays, weather days or special events
4
ONGOING LANECLOSURES
THREE MONTH LOOK AHEAD
ANTICIPATED LANE CLOSURES ON THE I-95 CORRIDOR:
• Nighttime lane/ramp closure along I-95 between NW 8 Street and NW
29 Street
• Closure hours have been adjusted based on current traffic
conditions from 6:30 p.m. until 5:30 a.m.
5
UPCOMING & ONGOING CONSTRUCTION ACTIVITIES
Bridge widening on SR 836 near NW 17 Avenue and NW 10 Avenue
6
• Demolition of median area on SR
836 is ongoing and continues
moving to the west
• Auger Cast Pile operations are
scheduled to begin in July for the
foundations that will support the new
double decked section of SR 836
UPCOMING & ONGOING CONSTRUCTION ACTIVITIES
SR 836 UPCOMING CONSTRUCTION ACTIVITIES
7
ANTICIPATED LANE CLOSURES ON SR 836 CORRIDOR:
• Single and double lane/ramp closures along eastbound and westbound SR
836
• Arterial roads under SR 836
• Closure hours have been adjusted based on current traffic conditions from
8 p.m. until 5:30 a.m.
• Single daytime lane closures on westbound SR 836 from 6 a.m. – 2 p.m.
ONGOING LANECLOSURES
THREE MONTH LOOK AHEAD
SR 836 UPCOMING CONSTRUCTION ACTIVITIES
8
• Ongoing sheet pile installation for
signature bridge arch # 4
foundation
• Construction of the signature
bridge center pier ACP foundations
(Ongoing)
• ACP foundations for Arch # 2
expected to begin in early July
UPCOMING & ONGOING CONSTRUCTION ACTIVITIES
SR 836 UPCOMING CONSTRUCTION ACTIVITIES
9
Column construction ongoing north
of I-395
UPCOMING & ONGOING CONSTRUCTION ACTIVITIES
10
UPCOMING & ONGOING CONSTRUCTION ACTIVITIES
Installing falsework for segment
erection
Bridge segments for I-395 weigh between
50 and 93 tons each
11
UPCOMING & ONGOING CONSTRUCTION ACTIVITIES
Bridge segments for I-395 weigh between 50 and 93 tons each
12
UPCOMING & ONGOING CONSTRUCTION ACTIVITIES
* This schedule does not reflect days added to the contract for
holidays, weather days or special events
13
Ongoing Auger Cast Pile Foundation
UPCOMING & ONGOING CONSTRUCTION ACTIVITIES
* This schedule does not reflect days added to the contract for
holidays, weather days or special events
14
UPCOMING & ONGOING CONSTRUCTION ACTIVITIES
Traffic shift on Biscayne Boulevard from NE 13 Street to NE 11 Terrace. There will
be three NB Lanes (two through lanes and one left turn lane onto NE 13 Street)
and three SB Lanes (two through lanes and one left turn lane onto EB MacArthur
Causeway).
Close Bayshore loop ramp to EB MacArthur Causeway (August 2020)
1
1
2
2
SR 836 UPCOMING CONSTRUCTION ACTIVITIES
15
ANTICIPATED NIGHTTIME LANE CLOSURES ON I-395 CORRIDOR:
• Lane closures along eastbound and westbound I-395
• Lane closures along Biscayne Boulevard and other arterial roadways
adjacent to I-395
• I-395 to I-95 ramp closures
• Closure hours have been adjusted based on current traffic
conditions from 8 p.m. until 5:30 a.m.
ONGOING LANECLOSURES
THREE MONTH LOOK AHEAD
16
COMMUNITY OUTREACH
PROJECT WEBSITE
• www.i-395miami.com
• Sign-up for project alerts/updates
Lane closure information
Upcoming construction activities
Presentations
• Calendar of events
OUTREACH OFFICE IN THE OVERTOWN COMMUNITY
• 1035 NW 3 Avenue, Miami, Florida 33136 (CLOSED AT
THIS TIME)
STAKEHOLDER MEETINGS
• Stakeholder meetings will be held virtually until further
notice. Next meeting date: TBD.
786-280-0983
OGonzalez@mrgmiami.com
Contact:Oscar Gonzalez
www.i-395miami.com
THANK YOU!