MODERN RIVER BRIDGE ABUTMENTS: CAR PARK RETAINING …

Post on 14-Jan-2022

6 views 0 download

Transcript of MODERN RIVER BRIDGE ABUTMENTS: CAR PARK RETAINING …

Job No

Scale at A3

Figure No Issue

Date

-

Client/Team

Drawn by

Checked

ApprovedDrawing Status

Drawing Title

Job No

Scale at A3

Figure No Issue

Date

60597 -

Drawn by

Checked

ApprovedDrawing Status

Drawing Title

Job No Figure No Issue

Date

-

Drawn by

Checked

ApprovedDrawing Status

FINAL

Scale at A3

Not to scale

Environmental Statement

The Project- Structures

Examples of Newtown Structure Finishes

Sheet 1 of 1

2.6

PM

PM

PM

Client/Team

RAILWAY BRIDGE ABUTMENTS:

DRESSED MASONRY BLOCKS, UNCOURSED

CAR PARK RETAINING WALL:

DRESSED MASONRY BLOCKS,

COURSED AND UNCOURSED

MODERN RIVER BRIDGE ABUTMENTS:

CONCRETE FACING BLOCKS, UNCOURSED

Job Title

A483/A489

Newtown Bypass

© Crown Copyright and database right 2014.

Ordnance

Survey 100021874. Welsh Government.

© Hawlfraint a hawliau cronfa ddata'r

Goron 2014. Rhif

Trwydded yr Arolwg Ordnans 100021874.

OCT 2014