METRO RAILWAY, KOLKATA
PRESENTATION
BY
ELECTRICAL DEPARTMENT
ON THE VISIT
OF
SRI R.S.GROVER, ADDL. MEMBER ELECTRICAL
ON
14th JULY, 2005
First METRO Service commenced on 24-10-1984 between ESP-NBN covering 5 stations.
Thereafter different sections were opened progressively and Finally the stretch on 27.9.95.
GAUGE : 1676 mm
LENGTH (DMI to TOL ) : 16.45 km
GRADIENT : 2% on running line & 4% on approach to carshed.
COACH : BG Bogie & MG Shell
General Features
UNDERGROUND : 15
ELEVATED : 1
SURFACE : 1
DISTANCE BETWEEN STATIONS
AVERAGE : 1.020 km
MAXIMUM : 2.151 km (DMI – BEL)
MINIMUM : 0.597 km (CEN-CWC )
NO. OF STATIONS
TRAIN FREQENCY
PEAK HOUR : EVERY 8 MINUTES
NON PEAK HOUR : EVERY 10/15 MINUTES
NO. OF TRAINS
WEEKDAYS : 190
SATURDAY & HOLIDAYS : 164
SUNDAYS : 64
ROLLING STOCK/ TRACTION
NO. OF COACHES : 144 (9 NGEF RAKE + 9 BHEL RAKE)
TRAIN COMPOSITION : 2 DMC
2 NDMC-MA
2 NDMC –MC
2 TC
CLASS OF ACCOMODATION : ONE CLASS
VENTILATION AND AIRCONDITIONING
Main Parameters
MAX PERMISSIBLE TEMP AT STATION : 30 oC
MAX TEMP. IN TUNNEL : 32.8 0C
MAX. RELATIVE HUMIDITY AT STATION : 87%
MAX HUMIDITY IN TUNNEL : 77%
MAX. AIR VELOCITY AT STATION : 2.5 m /sec
AT TUNNEL : 3.0 m/sec
a) TOTAL ESCALATORS : 38b) MINIMUM RISE : 4 Mt.c) MAXIMUM RISE : 7 Mt.d) INCLINATION : 30O
e) WIDTH : 1.1 Mt.f) PASSENGER CLEARING
CAPACITY : 800 Persons/Hour
g) SPEED : 0.45 Mt./Sec.h) MOTOR CAPACITY : 7.5 KW TO 12
KW
ESCALATORS:
33 KV 50 Hz 3 o supply is obtained from CESC at 4 receiving sub-station.
These sub-station are inter-countered with MR 33 KV feeder cable laid through the tunnel.
33 KV is stepped down to 11 KV at receiving sub-station.
Except Rabindra Sadan, all other Metro Railway Stations are having two independent feeders.
33 KV SYSTEM
3rd Rail
Running Rail
33 KV Incoming From CESC
33KV/11 KV
16 MVA(Oil Type)
11 KV System
Traction Transformer
Rectifier
33 KV System
415 Volt System
To Loads like pump, fan, light,AC Plant etc.
Auxiliary Transformer
33 KV Orange
11 KV Green
750 Volt (DC Positive) Red
415 Volt Brown
750 Volt (DC Negative) Black
Metro Railway Electric Power Distribution Systems
Isolators
HSCB
Third Rail System
• Technical assistance extended by OSAKA Municipal Transport Bureau for 3rd rail
current collection and rolling stock design.
• Air condition and ventilation of OSAKA Metro was adopted as climatic condition are same i.e. high humidity and temperature.
• Flat bottom foot 52 kg/m rail of high conductivity (specific resistance being seven times that of copper) also known as rimming steel is used as conductor of power at 750 V dc.
• Overall resistance 0.029 ohms per km.
3rd rail laid as specially prepared bed on the outer side of running track with insulating high density polyethylene inserts for fixing the conductor rail mounting assembly consisting of 3.3 KV porcelain insulator, galvanized mild steel frame work for mounting FRP shroud board on top and rear. 3.3 KV insulators are spaced at 2.50 mt apart .
Third Rail Laying System
Neutral section (air gap) is provided in the trailing direction of station platform at every traction station .
Length of N/section :15.50 mts; current collectors are spaced at 13.50 meters.
Neutral Section
Need for ventilation
To ensure supply of fresh Air for Passengers(O2)
To dilute obnoxious & hazardous gases
To bring down the relative humidity
To dispose of large quantity of heat by Traction Eq.,Auxiliary appliances, Human Body
To dispose of heat leaked inside the subway from the surrounding soil
Air Ventilation Design criteria
Fixing Up Ambient Condition (90% of day of any season) from last 5 Year Record from Metrological Department at 10 Hrs. when peak Traffic Occurs.
SeasonSeason TemperatureTemperature Relative HumidityRelative Humidity
Summer 36 55
Monsoon 33 70
Winter 27.2 57
Because of pollution and Dust, Air washery had been provided at every fresh air intake. Now at Esplanade station, dry air filters have been provided & air washery closed to save electricity consumption.
Rake Formation
DMC
(TOL)
NDMC
(MC)TC
NDMC
(MA)
NDMC
(MA)
NDMC
(MC)TC DMC
(DMI)
ParameterParameter BHEL RakeBHEL Rake NGEF RakeNGEF Rake EMU(open line)EMU(open line)
Coach length (mm) 19500 19500 21412
Coach Height(mm) 2740 2740 3684
Rake Formation 6MC+2TC 6MC+2TC 3MC+6TC
No of TMs 24 24 12
TM HP/KW 124/93 213/160 224/168
Total HP/KW 2976/2232 5112/3840 2688/2016
TM Voltage 338 675 535
Final Connection 2S+2P All Parallel All Parallel
Comparative Study
ParameterParameter BHEL RakeBHEL Rake NGEF RakeNGEF RakeEMUEMU
(open line)(open line)
Acceleration (M/S2) 1.1 1.1 0.53
Braking (M/S2) 1.1 1.1 0.89
E. M. Braking (M/S2) 1.3 1.3 0.89
Type of Brakes ED,EP,Auto,EM ED,EP,Auto,EM EP,Auto,EM
Nominal Voltage 750 Volt DC 750 Volt DC 25 KV AC
Tare Weight (Ton) MC=40,
TC=29
MC=40,
TC=29
MC=63,
TC=39
Tare Rake Weight (Ton) 298 298 423
Numbers of Passengers 2500 2500 3000
Passenger’s wt @ 60 kg(Ton) 150 150 180
Gross rake weight 448 448 603
HP/Ton (CRUSH) 6.64 11.41 4.46
Comparative Study (Contd..)
EXTENSION OF METRO FROM TOL TO GARIA
SANCTIONED IN 1999-2000
TOTAL ROUTE LENGTH : 8.70 Kms.
VIADUCT : 8.60 Kms.
LEVEL TRACK : 0.10 Kms.
NO. OF STATIONS : 6
KUDGHAT,BANSDRONI,NAKTALA,GARIA
BAZAAR,PRANABNAGAR and NEW GARIA
SANCTIONED COST : Rs. 907 Crores
1/3 COST OF THE PROJECT WILL BE SHARED BY THE STATE GOVERNMENT
T.D.C. : MAR. 2007
Number of Stations
• Elevated Stations 5 (five) Nos.
• Surface Station 1 (one) No.
• NAME OF STATIONS :
KUDGHAT
BANSDRONI
NAKTALA
GARIA BAZAR
PRANABNAGAR
NEW GARIA ( AT SURFACE )
CIRCULAR RAILWAY EXTENSION:
Metro Rly. is also executing Circular Railway extension project for E.Rly.
a) Extension from Prinsepghat to Majerhat:
Project sanctioned in 1999-00
Route length : 5.75 Kms.
Viaduct : 4.00 Kms.
Level track : 1.75 Kms.
No. of station : 2 (Both elevated)
Khidderpore & Remount road
Estimated cost : 118 Crores
T.D.C. : Work Over CRS’s sanction awaited
CIRCULAR RAILWAY EXTENSION Contd.:
b) Extension from Dumdum Cantt. to NSC Bose Airport:
Project sanctioned in 2000-01
Route length : 4.00 Kms.
Viaduct : 3.25 Kms.
Level track : 0.75 Kms.
No. of station : 2 (Both elevated)
Jessore Road & Airport station
Estimated cost : 111 Crores
T.D.C. : Aug. 2005
50 M3
80 M3 80 M3
50 M3
30 M3
Under Platform exhaust
25 M3
5 M3 5 M3
30 M3
Platform leakage
To Tunnel
Mid Tunnel exhaust
Mid Tunnel exhaust
Air Flow Air Flow Diagram in per Diagram in per
Second Second
Air intake (110 M3)
Air intake (110 M3)
Air intake
60 M3(Total) 60 M3(Total)
Platform (60 M3)
Tunnel (80 M3)
Under Platform (25 M3)
Platform leakage (5 M3)
(50 M3)
(30 M3)
Plate 14: Opposite Dum-Dum TSS Single Bolt connection for two cables on 3rd rail. At least two bolts connections suggested
GENERAL SERVICES
Power ConsumptionGeneral0%
Utilisation % of General Service Consumption
Illumination Except HQ 10.7
ESCALATOR & LIFTS 3.2
VENTILATION AND WASHERY 50.3
AIRCONDITIONING 23.6
S&T AND FARE OLLECTION 2.1
METRO HQ 1.7
PUMPING 5.1
COLONY ILLUMINATION 1.1
WORKSHOP & DEPOT 2.2
TotalTotal 100100
Breakup Consumption of General Service Energy Consumption
Non-Traction:63% Traction:37%