ABSTRACT

Energy modelling for the Sidewalk Toronto project: based on the project development program, projects energy use on an hour by hour basis for the annual load of all buildings and public spaces (“8760 model”).

Most relevant sections: Vol 2 (Sustainability)

TITLE: Sidewalk Toronto Energy Modelling

AUTHOR: Integral Group

Master Innovation & Development PlanTechnical Appendix

© 2019 Sidewalk Labs. The content, documents and materials contained herein are considered Sidewalk Proprietary Information.

Sidewalk Toronto Energy Modelling

8760 Load Inputs [Quayside]

2

8760 Loads Outputs [Quayside]

3

8760 Loads Outputs [Quayside]

4

Renewables [Quayside]

5Modeling results for typical summer day in June. Results vary throughout the year.

Coincident Heating and Cooling

6