Low Emission Fleet Masterclass Infrastructure Technologies · Masterclass Infrastructure...

Post on 20-Aug-2020

1 views 0 download

Transcript of Low Emission Fleet Masterclass Infrastructure Technologies · Masterclass Infrastructure...

Low Emission Fleet Masterclass

Infrastructure Technologies

Dr. Sikai HuangTechnical Specialist

sikai.huang@cenex.co.uk

ULEV Infrastructure and Trends

Learning Objectives

1. Vehicle Charging Infrastructure Projects

2. Available Electric Vehicles on the Market

3. Vehicle Charging Technologies & Technical Standards

4. Vehicle Charge Point Installation & Recommendations

5. Vehicle Charge Point Management

6. Vehicle Charging Network User Platform

7. Near-term Vehicle Charging Development

8. Novel Charge Point Technology and Equipment

9. Market Development Forecast

10. Hydrogen and Gas Fuelling Infrastructure

ULEV Infrastructure and Trends

What is Cenex’s Experience in Electric

Vehicle Charging Infrastructure?

ULEV Infrastructure and Trends

Cenex’ Experience

• Go Ultra Low Programme, Nottingham City Council (2015-2017).

• Charging Infrastructure Minimum Technical Specifications and Guidance, Office for Low Emission Vehicles (2016).

• ULEV Taxi Scheme Feasibility Study, TfGM (2015-2016).

• Gloucestershire County Council - Cheltenham and Gloucester

• Plugged-in Midlands (2010-2015).

• UK Electric Vehicle Supply Equipment Association (UK EVSE) Secretariat (2013 onwards).

ULEV Infrastructure and Trends

What Electric Vehicles are on the market?

ULEV Infrastructure and Trends

Electric Vehicle – Examples of Cars & Vans

ULEV Infrastructure and Trends

Electric Vehicle – Examples of Bus & Taxi

ULEV Infrastructure and Trends

How Do I Charge an EV?Connection types, charging speeds and modes

ULEV Infrastructure and Trends

Vehicle Charging Use Cases

Case B

Case A

©thisismoney

Case C

Conductive

Inductive

ULEV Infrastructure and Trends

Charger Type Charge Time Power (kW) Connection Type

Slow0-100% in

10-12 hours2.3-3.7 kW 3-Pin Plug

Fast0-100% in 4-

6 hours7-22 kW

Type 1 (T1)

or Type 2 (T2)

Semi-Rapid0-100% in 1-

2 hours22-43 kW Type 2 (T2)

Rapid0-80% in 20-

30 mins

43-50 kW,

120 kW -

Tesla

Supercharge

r

Type 2- AC (T2)

or CHAdeMO - DC (CHA)

or CCS Combo 2 - DC (CCS)

Vehicle-to-Grid0-100% in 6

hours7kW V2G Connector (V2G)

Home

Workplace

Long stay car park

Publicly accessible locations

Depots

Service station

Tesla Supercharger station

Workplace

Pre-commercial at Universities

Vehicle Charging

ULEV Infrastructure and Trends

Mode 1:• Typically domestic 3-Pin socket with RCD

protection• No communication between EV and

socket

Vehicle Charging “Modes”

Mode 2• Typically domestic 3-Pin socket with RCD

protection in the plug or in-line “control box”

• Communication between EV and in-line “control box” (Control Pilot)

Mode 3• Typically Type 2 cable with no in-line

“control box”• Communication between EV and Charge

Point (Control Pilot)• On-board charger

Mode 4• Typically tethered plug cable with no in-

line “control box”• Communication between EV and Charge

Point (Control Pilot)• Off-board charger

Mode 3 Cable

Mode 2 Cable

ULEV Infrastructure and Trends

AC Connecting TechnologyVehicle Connector Types – AC Charging Cable

SAE J1772 Type 1

Proximity Pin

Control PilotEarth

Live 1

Live 2/N

Release Button and hole for padlock

Live 3

EN62196-2 Type 2 Female

Control Pilot Proximity Pin

Neutral

Live 2

Live 1Earth

Recess for plug lock

Nissan Leaf socket

Renault Zoe socket

Tesla Model Ssocket

Control Pilot

Proximity Pin

Neutral

Live 3

Live 2

Live 1

Earth

EN62196-2 Type 2 Male

Charge Point Side of Cable

ULEV Infrastructure and Trends

DC Connecting Technology

CCS Combo 2

DC +/-pins

Earth

Control Pilot and

Proximity Pins

CHAdeMO JARI JEVS/G105

DC +/-pins

BMW i3 socket

Nissan Leaf socket

ULEV Infrastructure and Trends

What Does a Charge Point Installation Look Like?Charge Point installation components,

considerations and examples

ULEV Infrastructure and Trends

Charge Point Installation Components

A typical on-street or car park Fast Charge Point installation EN62196-2 Type 2

Female socket Display and RFID card

reader

Status lights

Feeder Pillar

Crash Barrier

ULEV Infrastructure and Trends

Charge Point Installation ComponentsA typical workplace Fast Charge Point facility

• Privately owned and monitored site

• Clear bay markings and signage

• Policed by own staff

• RFID card accessed Charge Point

(but not always needed)

Company branded signage

Company branded EV

Fast Charger with Type 2

socket(s)

ULEV Infrastructure and Trends

Rapid Charge Point Installation

A typical UK Motorway services rapid charger facility (private site)

DC CCS/DC CHAdeMO

DC CHAdeMO/AC Type 2

DfT approved signage

(P660x9 and S65)

Network or investor branding

Crash Barrier

EV-specific bay markings

ULEV Infrastructure and Trends

Council On-street Charge Point Installation

A typical on-street fast Charge Point facility

• Council owned/monitored sites

• Clear bay markings and signage

• Traffic Regulation Order in place (contravention code 14, 71 for car parks)

• RFID card accessed Charge Point

DfT approved sign (P660x9)

DfT approved bay markings

Fast Charger with 2 Type 2 sockets

Traffic Signs ManualChapter 3

Web Search on P660x9 or S65 for working drawings

ULEV Infrastructure and Trends

Charge Point Installation RecommendationsRapid

• ;

Company

• Usually a simpler and quicker process.

• Consult with expert with extensive knowledge of charge points.

• 3+ companies to provide a quote.

• Purchase maintenance package and review the details.

• Know your business model (i.e., PAYG).

• Certified electricians are required and comply with latest standards.

• New electricity supply to support rapid chargers.

• Contact Distribution Network Operator (DNO) for power assessment.

• Location as close to Low Voltage substation as possible.

• Planning permission may be required.

• Charge Point suppliers’ lead time should be short.

ULEV Infrastructure and Trends

Charge Point Installation Recommendations

• ;

Council

Considerations prior to the procurement

• All the points listed in the Company and Rapid.

• Collaborate with other Council departments.

• Site ownership.

• Existing vehicle charging facility.

• Timeline to install charge points.

• Access methods and restrictions.

• Parking space requirement.

• Electricity supply; availability and capacity.

• Traffic Regulation Order alteration requirements and timescales.

• Alternative sites.

• Operational model for the charge points installed.

Project Timescale Allowance

Shortest timescale = a few weeks

Average timescale = 4-6 months

Longest timescale = 3 years

Shortest • Own site• Everyone on-board• Power supply available• Equipment lead time short

Longest• Long approval chain• Landlord needs convincing• No metered power supply• Planning permission needed• TRO needed• Council procedures too slow• Long equipment lead time

ULEV Infrastructure and Trends

What is a Charge Point Management System?

A brief explanation

ULEV Infrastructure and Trends

A word on Charge Point Management Systems• CPMS is a Back Office function provided by a Charge Point supplier or Network Operator. It is hosted

on a server that connects to Charge Points of the mobile telephone network

• The CPMS provides the following functions;

1) A database of all the Charge Points on its network;2) A database of the network’s authorised EV users;3) The ability to remotely diagnose and operate Charge Point functions;4) Collection of anonymised EV charging data for Gov’t, host and EV user

billing purposes;5) A user help line and website (with location map);6) Pay As You Go billing options for EV users;

• Common CPMSs in use in the UK include Charge Your Car, Chargemaster Chargevision and Charge Point Services Genie

• The CPMS may be determined by who you buy Charge Points from

• A CPMS connection is an ongoing cost that must be paid to keep the charging service running and for revenue generation

• Councils should buy connected equipment

• Businesses have the option to buy connected or non-connected equipment (lower cost option)

ULEV Infrastructure and Trends

Where Do I Find Charge Point Location Details?

ULEV Infrastructure and Trends

Examples of Charge Point Maps Providers

ULEV Infrastructure and Trends

Charge Point Maps

• On-line maps• EV satnav

https://www.zap-map.com/livehttps://www.plugshare.com/

ULEV Infrastructure and Trends

Near-Term Future Development of Vehicle Charging

ULEV Infrastructure and Trends

Emerging Charging Technology Trend

Direct-current (DC) vehicle charging

• For DC charging equipment:

o DC charging equipment shall be compliant with BS EN 61851 Part 23 .

o DC charging equipment shall use BS EN 62196 Mode 4 charging

• For charging equipment with embedded generation capability (V2X):

o Charging equipment with embedded generation capability of up to and including 16A per phase shall be compliant with ENA Engineering Recommendation G83.

o Charging equipment with embedded generation capability greater than 16A per phase shall be compliant with ENA Engineering Recommendation G59.

• FAST DC (10kW to 22kW)

• SEMI-RAPID DC (22kW to 50kW)

ULEV Infrastructure and Trends

Emerging Charging Technology TrendOpen Charge Point Protocol (OCPP 2.0)

• Offer a uniform solution for the method of communication between charge point and central system.

• possible to connect any central system with any charge point, regardless of the vendor.

• A uniform standard prevents all kinds of coordination problems and is therefore an advantage for the whole electric vehicle market.

Open Smart Charging Protocol (OSCP)

• communicate physical net capacity from the DSO (or site owner) to the back-office of the charge spot operator.

• communicate a 24 hour prediction of the local available capacity to the Charge Spot Operator.

• The Service Provider will fit the charging profiles of the electrical vehicles within the boundaries of the available capacity.

ULEV Infrastructure and Trends

Vehicle Charging Infrastructure Market Development Forecast

ULEV Infrastructure and Trends

EVSE Infrastructure Growth

2012 2017

ULEV Infrastructure and Trends

Connector Type Market Share

ULEV Infrastructure and Trends

EVSE Infrastructure Growth

ULEV Infrastructure and Trends

EVSE Infrastructure Growth

• Rapid growth to support significant of plug-in electric vehicle uptake.

• Publicly accessible charge points: workplace, destination and retail.

• Private charge points: home chargers.

• By 2020, there would be more than 5,000 charge points installed in the UK.

• A charge point can have dual outlet and support two electric vehicles being charged simultaneously.

ULEV Infrastructure and Trends

Hydrogen and GasFuelling Infrastructure

ULEV Infrastructure and Trends

Hydrogen Fuelling• UK hydrogen infrastructure

deployment only emerging

• Typically for research purposes or for specific fleets

• Dispensed at either 350 or 700 bar gas

• 350 bar provided by TK16 nozzle

• 700 bar provided by TK17 nozzle

Where will you find it?UK14 stations open by April 171

UKH2Mobility recommended a national network of 1,150 HRS by 20302

ULEV Infrastructure and Trends

Hydrogen Fuelling

• Containerised station with:• fuel cell electrolyser• gas pre-chiller• compressor

• External tank storage of H2

dispenses 5 kg H2 at 350 bar

• Onsite storage:– Hydrogen brought in by tube trailer

ULEV Infrastructure and Trends

Natural Gas Fuelling

ULEV Infrastructure and Trends

Natural Gas/Biomethane Fuelling

Where will you find it?

What is it used for?Cars, LCVs (mainland Europe)Vans, Buses & Trucks (pan-Europe)

Sources: 1) www.gasvehiclehub.com/refuelling-facility (2017)2) cngeurope.com (2017)3) Transport Energy Roadmap, LowCVP\Element Energy (2015)

▪ 16 publicly accessible stations in the UK1,3 and additional private stations

▪ c3,090 publicly accessible stations across Europe2

Potential for >350 stations in UK by 2030 for optimistic scenarios3 for vehicle market penetration (van, truck, bus)

ULEV Infrastructure and Trends

Conclusions• Learning Objectives:

1. Vehicle Charging Infrastructure Projects

2. Available Electric Vehicles on the Market

3. Vehicle Charging Technologies & Technical Standards

4. Vehicle Charge Point Installation & Recommendations

5. Vehicle Charge Point Management

6. Vehicle Charging Network User Platform

7. Near-term Vehicle Charging Development

8. Novel Charge Point Technology and Equipment

9. Market Development Forecast

10. Hydrogen and Gas Fuelling Infrastructure

ULEV Infrastructure and Trends

Conclusions

• Electric vehicles are available for most transport uses, including passenger cars and vans.

• Plug-in electric vehicle can be pure battery based, extended-range or hybrid electric vehicles.

• UK electric vehicle charging infrastructure is growing rapidly.

• Hydrogen and gas fuelling stations are less deployed compared to electric vehicle charging stations.

• CNG/LNG infrastructure is being grown to support Heavy Goods Vehicles and Refuse Collection Vehicles.

Thank you for listeningDr. Sikai HuangTechnical Specialistsikai.huang@cenex.co.uk