LOR Warren Centre Infrastructure Delivery Presentation PDF · 2017. 10. 27. · Townsville Marine...

Post on 14-Sep-2020

0 views 0 download

Transcript of LOR Warren Centre Infrastructure Delivery Presentation PDF · 2017. 10. 27. · Townsville Marine...

3

© Laing O'Rourke 2014, all rights reserved

4

“…..a country’s ability to improve its standard of living over time depends almost entirely on its ability to raise its output per worker.”

Paul Krugman, 1992. The Age of Diminished Expectations: US Economic Policy in the 1980’s.

© Laing O'Rourke 2014, all rights reserved

5

RGP5 Jimblebar Glenfield Junction

Transport

Lawrence Hargrave Drive

Saddleback and MarradongPlant and Infrastructure Project

Overland Conveyors –Solomon Mines

Cape Lambert Northern Water Treatment Plant

Resources

Townsville Marine Precinct Newcastle K7, 8, 9 and 10 London Gateway Port Sydney Port Botany

Marine

Leadenhall Building, London

London 2012 OlympicsALDAR Headquarters, Abu Dhabi

Buildings

Albert St, Brisbane

Digital Engineering

Digital engineering

© Laing O'Rourke 2014, all rights reserved

Underpinning reliability

11

2D 3D Systems Integration3D (Detailing) + Data Site & Systems Integration

Digital engineering

© Laing O'Rourke 2014, all rights reserved

Underpinning reliability

12

Digital engineering

© Laing O'Rourke 2014, all rights reserved

Underpinning reliability

13

Digital engineering

© Laing O'Rourke 2014, all rights reserved

Underpinning reliability

14

Digital engineering

© Laing O'Rourke 2014, all rights reserved

Underpinning reliability

15

Digital engineering

© Laing O'Rourke 2014, all rights reserved

Underpinning reliability

16

Digital engineering

© Laing O'Rourke 2014, all rights reserved

Underpinning reliability

17

Digital engineering

© Laing O'Rourke 2014, all rights reserved

Underpinning reliability

18

• Fabricated• RFID attached• Packaged• Pre-shipped

• Shipment

• Received• Issued• Installed• Site location tracked

Digital engineering

© Laing O'Rourke 2014, all rights reserved

Next steps

19

Asset monitoring & predictive maintenance

© Laing O'Rourke 2014, all rights reserved

Smart instrumentation

20

Assembly rather than construction

© Laing O'Rourke 2014, all rights reserved

Design for manufacture and assembly

21

DfMA Opportunities

© Laing O'Rourke 2014, all rights reserved

22

Leadenhall Building, London

© Laing O'Rourke 2014, all rights reserved

DfMA delivery

23