August 1, 2019
Columbia University- Facilities and Operations Department
New York, NY 10027 RE: Columbia Manhattanville Project/MWL Submissions
Dear
lendlease .1
On behalf of Lendlease (US) Construction LMB Inc. ("Lendlease'), I confirm that the information in the schedule of the Minority/Women/Local-Owned Business Participation Utilization Plan is prepared based on documentation and information received from the trade contractors working on the Columbia University Manhattanville Project (the "Project").
Lendlease also confirms that it has, based on available information and representations from Columbia's trade contractors, provided to Columbia the required MWL documentation for Minority, WomenOwned and Locally-Based Business Enterprise participation as outlined in the EEO requirements in the Exhibit 0 - Notice to Bidders to Lendlease's Contract with Columbia for MWL compliance reporting. The documentation utilizes the Business Enterprise-Schedule of Minority/Women/Local-Owned Business Participation (Schedule M) as the primary source for MWL compliance reporting. The data generated from this source, which Lendlease submits quarterly to Columbia for analysis and approval, is used to produce quarterly summaries of spend. Lendlease distinguishes specialty and non-specialty construction in accordance with the contractual definitions utilized for payment requisition assembly.
Lendlease additionally confirms that it has, based on available information and representations from Columbia's trade contractors, provided to Columbia the required MWL documentation for Minority, Female and Local Workforce participation as outlined in the EEO requirements in Exhibit O - Notice to Bidders to Lendlease's Contract with Columbia for MWL compliance reporting. Lendlease continues to review the certified payroll submissions for Columbia's trade contractors to verify compliance with Columbia's guidelines for proper completion of workforce employee information (such as: name, address, zip code, gender and ethnicity).
If you have any questions or require additional information, please do not hesitate to contact me directly.
Sincerely, Lendlease (US) Construction LMB Inc.
Ralph J. Esposito, President
Lend Lease (US) Construction LMB Inc. 200 Park Avenue, 9th Floor, New York, NY 10166 www.lendlease.com
T 212 592 6800 F 212 592 6988
SKANSKA
September 23, 2019
Columbia University
New York, NY 10027
RE: Columbia University Manhattanville MWL Certification The Forum Project Quarter Ending June 30, 2019
Dear
Skanska USA Building Inc.
Columbia University
University Forum Project
659 West 131 st Street
New York, NY 10027
On behalf of Skanska USA, I hereby certify that the information as noted in the schedules for the Minority/Women/Local-owned Business Participation Utilization Plan is generated from documents received from the contractors working on the Columbia University Manhattanville, Forum Project.
If you have any questions or require additional information, please let me know.
cc: C. Viola (Skanska); D. Licciardi (Skanska)
Turner
September 20, 2019
Columbia University - Facilities and Operations Department
New York, NY10027
RE: 2nd Quarter 2019 Report for
Columbia Manhattanville Project/MWL Submissions
Dear
Turner Construction Company
375 Hudson Street, 6 1° Floor
New York, NY 10014
On behalf ofTurner Construction Company, as the agent for the Owner, I confirm to the best of my
knowledge and information that the information in the schedule of the Minority/Women/Local Owned
Business ("MWLOB") Participation Utilization Plan is prepared based on documentation and information
received from the trade contractors working on the Columbia University Manhattanville Project.
Turner, as the Owner's agent, further confirms that it has, based on available information and
representations from Columbia's trade contractors, provided to Columbia the required MWL
documentation for Minority, Women-owned and locally-based Business Enterprise participation as
outlined in the EEO requirements in the Exhibit E. Notice to Bidders to Turner Construction contract with
Columbia for MWL compliance reporting. The documentation utilizes the business Enterprise Schedule of
Minority Women Local-Owned Business Participation (Schedule E) as the primary source for MWL
compliance reporting. The data generated from this source, which Turner Construction submits quarterly to
Columbia for analysis and approval, is used to produce quarterly summaries ofspend.
Turner additionally confirms as the Owner's agent it has, based on available information and
representations from Columbia's trade contractors, provided to Columbia the required MWL
documentation for Minority, Female and Local Workforce participation as outlined in the EEO
requirements in Exhibit E. Notice to bidders to Turner contract with Columbia for MWL compliance
reporting. Turner continues to review the certified payroll submissions for Columbia's trade contractors
to verify compliance with Columbia's guidelines for proper completion of workforce employee
information (such as: name, address, zip code, gender and ethnicity).
If you have any questions or require additional information, please do not hesitate to contact me directly.
Vice President and Construction Executive
Building the future
PAR ENVIRONMENTAL CORPORATION 313 Spook Rock Road, Suffern, NY 10901 * Ph: 845-369-7500 * Fax: 845-369-6682
September 23, 2019
Columbia University
New York, NY 10027
RE: Columbia University Manhattanville MWL Certification PAR Demolition Project -Quarter Ending June 2019
Dear ,
On behalf of PAR Environmental Corp., I confirm that the information in the Minority/Women/Local-Owned Business Participation Utilization Plan is prepared based on documentation and information received from trade contractors working on the Columbia University Manhattanville Project on behalf of PAR Environmental Corp. PAR Environmental Corp. also confirms that it has, based on available information and representations from its trade contractors, provided Columbia with the required MWL documentation for Minority, Womenowned and Locally-Based Business Enterprise participation as outlined in the governing EEO requirements included in the Notice to Bidders exhibit of its' contract with Columbia for MWL compliance reporting. PAR Environmental Corp. additionally confirms that it has, based on available information and representations from its trade contractors, provided Columbia with the required MWL documentation for Minority, Female and Local Workforce participation as outlined in the governing EEO requirements included in the Notice to Bidders exhibit of its' contract with Columbia for MWL compliance reporting. PAR Environmental Corp. continues to review the certified payroll submissions for Columbia's trade contractors to verify compliance with Columbia guidelines for proper completion of workforce employee information (such as: name, address, zip code, gender and ethnicity).
If you have any questions or require additional information, please let me know.
Regards,
� Patrick B. Maho President PAR Environmental Corp.
Non-Specialty Construction
Date: 06/30/2019
Project Name Project Start Status Page #Utilities Improvement 1/3/2008 In Progress 4-9Abatement & Demolition Project 9/1/2009 In Progress 10-23Jerome L. Greene Science Center 2/28/2011 In Progress 24-53EPA Clean Diesel 5/1/2009 Project Completed 11/2011 54-55Open Space 7/10/2013 In Progress 56-62Lenfest 12/1/2013 In Progress 63-79University Forum 12/1/2015 In Progress 80-94Phase 2 Below Grade 10/1/2016 In Progress 95-105Columbia Business School 1/1/2018 In Progress 106-123Shared Services 2/4/2010 In Progress 124-126
Schedule M3s are firms paid by a firm found on the preceding Schedule M2
Non-Specialty Project Reporting Periods
Reporting Period Summary NotesManhattanville Project Reporting Period: 8/1/2008 – 6/30/2019
During the reporting period there are currently ten projects comprising the Non-Specialty construction portion of the Manhattanville project. Nine out of the ten projects are all in progress with starting periods as early as 1/3/2008, with payments starting in August 2008. The Shared Services spending is allocated to each individual project.
The Non-Specialty report package has cumulative and quarterly summaries of workforce hours and spending (backed by Schedule Ms). There are three types of Schedule Ms (indicated in the upper right corner of the forms):
Schedule M1s are for firms paid directly by Columbia University Schedule M2s are for payments made by a firm directly paid by Columbia University (typically the Construction Manager)
Total Spend Total L$ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ $
Utilities Improvement -$ 0% 21,944$ 0% 28,894,115$ 86% 585,271$ 2% -$ 0% -$ 0% 597,070$ 2% 30,098,400$ 89% 3,683,259$ 11% 33,781,659$ 29,491,185$
* Abatement & Demolition 2,077,175$ 7% 1,438,093$ 5% 214,614$ 1% 1,217,666$ 4% 2,350$ 0% 214,401$ 1% 617,158$ 2% 5,781,457$ 20% 23,434,069$ 80% 29,215,526$ 1,048,523$
* Jerome L. Greene Science Center 49,092,652$ 12% 45,352,815$ 11% 12,774,427$ 3% 2,668,892$ 1% -$ 0% 79,203$ 0% 6,625,281$ 2% 116,593,270$ 27% 307,445,221$ 73% 424,038,491$ 19,478,911$
EPA Clean Diesel -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% 613,907$ 100% 613,907$ -$
* Open Space 916,725$ 6% 576,798$ 3% 340,466$ 2% 54,195$ 0% -$ 0% -$ 0% 121,951$ 1% 2,010,135$ 12% 14,485,941$ 88% 16,496,076$ 462,417$
* Lenfest 3,217,912$ 4% 6,221,300$ 9% 1,624,680$ 2% 226,668$ 0% -$ 0% 38,995$ 0% 1,513,224$ 2% 12,842,779$ 18% 59,170,919$ 82% 72,013,698$ 3,176,899$
* University Forum 16,622,264$ 20% 4,964,834$ 6% 2,549,544$ 3% 1,246,502$ 2% -$ 0% -$ 0% 11,085$ 0% 25,394,229$ 31% 56,606,069$ 69% 82,000,298$ 2,560,629$
* Phase 2 Below Grade 9,835,108$ 5% 7,167,630$ 4% 91,007,916$ 50% 101,285$ 0% -$ 0% 5,621$ 0% 1,627,546$ 1% 109,745,106$ 61% 71,502,313$ 39% 181,247,419$ 92,641,083$
* Columbia Business School 9,703,152$ 14% 4,729,987$ 7% 913,044$ 1% 62,299$ 0% -$ 0% 86,326$ 0% 42,455$ 0% 15,537,263$ 22% 54,792,891$ 78% 70,330,154$ 1,041,825$ Total 91,464,988$ 70,473,401$ 138,318,806$ 6,162,778$ 2,350$ 424,546$ 11,155,770$ 318,002,639$ 591,734,589$ 909,737,228$ 149,901,472$
% of Total Spending¹ 10% 8% 15% 1% 0% 0% 1% 35% 65% 100% 16%
Total Spend Total L$ $
Total $772,636,249 $143,921,356% of Total Spending¹ 100% 19%
MWL Spending # of Firms Total Spending % of Total MWL Spending
% of Total Spending
ESD Certified Firms 124 154,874,213$ 49% 17%Local Firms 33 138,318,806$ 43% 15%Firms With Other Certification 27 24,809,620$ 8% 3%
Total MWL 184 318,002,639$ 100% 35%
Total Hours Total L Total
Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs Hrs # %² # %² #
Utilities Improvement 15,126 16% 203 0% 0 0% 0 0% 8,053 8% 0 0% 0 0% 23,382 24% 72,083 76% 95,465 8,053 57 24% 182 76% 239
* Abatement & Demolition 89,003 54% 760 0% 122 0% 5,956 4% 10,705 6% 0 0% 8 0% 106,554 64% 58,748 36% 165,302 10,835 361 65% 191 35% 552
* Jerome L. Greene Science Center 502,503 32% 6,546 0% 10,389 1% 16,684 1% 47,382 3% 1,225 0% 8,280 1% 593,008 38% 973,230 62% 1,566,237 67,276 1,168 42% 1,593 58% 2,761
EPA Clean Diesel (No Workforce - Equipment Supplies) 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Open Space 19,121 51% 0 0% 0 0% 0 0% 280 1% 0 0% 0 0% 19,401 51% 18,438 49% 37,839 280 99 52% 90 48% 189
* Lenfest 88,213 36% 1,418 1% 1,352 1% 2,235 1% 4,545 2% 0 0% 126 0% 97,889 40% 148,272 60% 246,160 6,023 306 40% 450 60% 756
* University Forum 105,756 60% 170 0% 121 0% 1,635 1% 6,441 4% 0 0% 310 0% 114,431 65% 61,925 35% 176,355 6,871 397 53% 356 47% 753
* Phase 2 Below Grade 141,491 34% 4,596 1% 376 0% 2,832 1% 4,438 1% 0 0% 68 0% 153,800 37% 262,752 63% 416,552 4,882 450 38% 727 62% 1,177
* Columbia Business School 58,212 32% 289 0% 126 0% 1,115 1% 1,659 1% 0 0% 1,427 1% 62,826 35% 116,687 65% 179,513 3,211 339 43% 450 57% 789
* Shared Services - Lend Lease US Construction LMB³ 92,640 32% 2,939 1% 13,996 5% 19,956 7% 49,345 17% 0 0% 2,537 1% 181,413 63% 107,940 37% 289,353 65,878 133 42% 182 58% 315
* Shared Services - Johnson Security³ 152,969 60% 0 0% 2,042 1% 31,652 12% 54,836 21% 0 0% 11,142 4% 252,642 99% 3,084 1% 255,726 68,020 300 97% 8 3% 308
* Shared Services - Eddington Security³ 110,679 76% 0 0% 0 0% 304 0% 35,032 24% 0 0% 0 0% 146,015 100% 8 0% 146,023 35,032 167 99% 1 1% 168Total Hours 1,375,711 16,920 28,523 82,367 222,715 1,225 23,897 1,751,358 1,823,166 3,574,524 276,360 3,777 4,230 8,007
% of Total Hours² 38% 0% 1% 2% 6% 0% 1% 49% 51% 100% 8% 47% 53% 100%
2 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount 3 Security workforce hours apply to all projects and reported by vendor in a shared services project * Denotes active project
MWL Total MWL Non-MWL Total MWL Non-MWL
1 Denotes percentages of the individual MWL designation to the total spending
* Denotes active project
Workforce Hours : CU Goal = 40%
Non-Specialty Projects
HeadcountM W L MW ML WL
% of Total Excluding CM Spending
20%
(Note: May include changes to prior periods)
1 Denotes percentages of the individual MWL designation to the total spending
Manhattanville MWL Workforce and Spending SummaryCumulative: Aug 1, 2008 to June 30, 2019
(Excluding Specialty Construction)
Construction Spending: CU Goal = 35%
Non-Specialty Projects M W L MW ML WL MWL Total MWL Non-MWL
Non-Specialty Projects Excluding CM Spend M W L MW
$ $ $ $ML WL MWL Total MWL Non-MWL
$90,985,805 $70,473,401 $138,318,806 $5,584,586 $2,35012% 9% 18% 1% 0%
$ $
18%3%41%
$310,965,148 $461,671,1010% 1% 40% 60%
$ $ $$424,546 $5,175,654
2
Total Spend Total L$ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ $
Utilities Improvement -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ -$
* Abatement & Demolition 26,869$ 2% 119,772$ 7% -$ 0% 32,847$ 2% -$ 0% -$ 0% -$ 0% 179,488$ 11% 1,492,652$ 89% 1,672,140$ -$
* Jerome L. Greene Science Center 106,471$ 5% 119,292$ 5% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% 225,763$ 10% 2,018,380$ 90% 2,244,143$ -$
EPA Clean Diesel -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ -$
* Open Space -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% 191,699$ 100% 191,699$ -$
* Lenfest -$ 0% 173$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% 173$ 0% 67,727$ 100% 67,900$ -$
* University Forum 605,656$ 11% 62,095$ 1% 133,108$ 3% -$ 0% -$ 0% -$ 0% -$ 0% 800,859$ 15% 4,501,906$ 85% 5,302,765$ 133,108$
* Phase 2 Below Grade 1,290,503$ 23% 133,985$ 2% 938,123$ 17% -$ 0% -$ 0% -$ 0% 190,187$ 3% 2,552,798$ 45% 3,093,410$ 55% 5,646,208$ 1,128,310$
* Columbia Business School 7,381,862$ 18% 965,840$ 2% 467,375$ 1% 7,080$ 0% (464)$ 0% 86,326$ 0% 12,180$ 0% 8,920,199$ 22% 32,023,877$ 78% 40,944,076$ 565,417$ Total 9,411,361$ 1,401,157$ 1,538,606$ 39,927$ (464)$ 86,326$ 202,367$ 12,679,280$ 43,389,651$ 56,068,931$ 1,826,835$
% of Total Spending¹ 17% 2% 3% 0% 0% 0% 0% 23% 77% 100% 3%
Total Hours Total L TotalHrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs Hrs # %² # %² #
Utilities Improvement 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Abatement & Demolition 10,190 37% 744 3% 0 0% 216 1% 40 0% 0 0% 8 0% 11,198 40% 16,567 60% 27,765 48 48 44% 61 56% 109
* Jerome L. Greene Science Center 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
EPA Clean Diesel (No Workforce - Equipment Supplies) 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Open Space 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Lenfest 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* University Forum 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Phase 2 Below Grade 2,299 30% 510 7% 8 0% 0 0% 245 3% 0 0% 0 0% 3,062 40% 4,561 60% 7,623 253 31 34% 59 66% 90
* Columbia Business School 37,973 34% 263 0% 114 0% 848 1% 1,089 1% 0 0% 787 1% 41,072 37% 70,192 63% 111,264 1,989 263 45% 328 55% 591
* Shared Services - Lend Lease US Construction LMB³ 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Shared Services - Johnson Security³ 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 #DIV/0! 0 ##### 0
* Shared Services - Eddington Security³ 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0Total Hours 50,462 1,517 122 1,064 1,374 0 795 55,332 91,320 146,652 2,290 342 448 790
% of Total Hours² 34% 1% 0% 1% 1% 0% 1% 38% 62% 100% 2% 43% 57% 100%
Non-MWL
MWL Total MWL Non-MWL
M W L
Total MWL Non-MWL
Workforce Hours : CU Goal = 40%
Non-Specialty ProjectsHeadcount
M W L MW ML WL
Manhattanville MWL Workforce and Spending SummaryQuarter: April 1, 2019 to June 30, 2019
* Denotes active project(Note: May include changes to prior periods)
3 Security workforce hours apply to all projects and reported by vendor in a shared services project 2 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount 1 Denotes percentages of the individual MWL designation to the total spending
MW ML WL MWL Total MWL
Construction Spending: CU Goal = 35%
Non-Specialty Projects
(Excluding Specialty Construction)
3
Utilities Improvement
4
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 1/3/2008¹ Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 14,402
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W No Printing Service Yes $ ‐ $ 13 $ 13 L No Plumbing Contractor Yes $ 12,812 $ 14,134 $ 14,134
NON No Locksmiths Yes $ ‐ $ 255 $ 255
$ 12,812 $ 14,402 $ 14,402 $ 12,812 $ 14,147 $ 14,147
Non‐MWL Direct Spend Total $ ‐ $ 255 $ 255 ¹ Billing begins on 8/1/2008 100% 98% 98%Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
OWNER
DIRECT SPEND VENDORS (Tier I)
Utilities Improvement
Owner
Trade
In Progress6/30/2019
Columbia University
MWL:
NON:
Titan Plumbing & Heating LLC
410 West 118th Street, NY, NY 10027
Name/Address/Phone # (if available) otherwise enter Trade
Name
Columbia University
Green Girl Printing and Messenger Inc
Abbey Locksmiths Inc
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
5
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 1/3/2008¹ Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 33,767,257
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Construction Management Yes $ 26,364,500 $ 34,501,633 $ 33,767,257
$ 26,364,500 $ 34,501,633 $ 33,767,257 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ 26,364,500 $ 34,501,633 $ 33,767,257 ¹ Billing begins on 8/1/2008 0% 0% 0%Date: 06/30/2019
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Lend Lease US Construction LMB
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Utilities Improvement
6
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/3/2008¹ Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 26,364,500 $ 34,501,633 $ 33,767,257
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
MW‐ESD No Security Yes $ ‐ $ 7,079 $ 7,079 W‐ESD No Electrical Yes $ 21,931 $ 21,931 $ 21,931 L No Utilities Yes $ 13,205,245 $ 14,912,282 $ 14,912,281 L No Utilities Yes $ 13,150,000 $ 13,966,897 $ 13,966,896 L No Building Supplies Yes $ ‐ $ 804 $ 804 MW‐ESD No Construction Management Yes $ ‐ $ 578,192 $ 578,192 MWL‐ESD No Construction Management Yes $ ‐ $ 385,484 $ 385,484 MWL‐ESD No Construction Management Yes $ ‐ $ 211,586 $ 211,586
NON:NON No Fire Safety Yes $ 287,950 $ 287,950 $ 287,950 NON No Excavation Yes $ 434,950 $ 274,950 $ 274,950 NON No Dewatering Yes $ 5,603 $ 5,603 $ 5,603
$ 27,105,679 $ 30,652,758 $ 30,652,756 $ 26,377,176 $ 30,084,255 $ 30,084,253
Non‐MWL Tier II Total $ 728,503 $ 568,503 $ 568,503 ¹ Billing begins on 8/1/2008 100% 87% 89%Date: 06/30/2019
Tier II Grand TotalMWL Tier II Total
MWL % of Tier I
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier I)
SUBCONTRACTORS (Tier II)
Utilities Improvement
In Progress
Construction ManagementLend Lease
Name
6/30/2019
Name/Address/Phone # (if available) otherwise enter Trade
Trade
Felix Associates LLC
Lend Lease
MWL:
212-939-9580622 West 132nd, 2nd fl, New York, NY 10027
Egg Electric Inc
Construction Management
Eddington Security Inc
Rael Automatic Sprinkler
Moretrench American CorpNicholson Construction
PearlgreenThe McKissack Group Inc
MFM Contracting Corp
The McKissack Group IncThe McKissack Group Inc
7
GC/CM: Lend Lease
Date Range: 8/1/2008 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
Tier I (Direct) Lend Lease US Construction LMB 0 0% 0 0% 0 0% 0 0% 88 3% 0 0% 0 0% 88 3% 3,406 97% 3,494 2 50% 2 50% 4Construction Management
* Tier II MFM Contracting Corp 5,706 16% 3 0% 0 0% 0 0% 3,694 10% 0 0% 0 0% 9,402 26% 26,540 74% 35,942 25 20% 97 80% 122Utility WorkFelix Associates LLC 9,051 17% 200 0% 0 0% 0 0% 4,272 8% 0 0% 0 0% 13,522 25% 41,203 75% 54,725 21 24% 67 76% 88Utility WorkMoretrench American Corp 370 28% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 370 28% 934 72% 1,304 9 36% 16 64% 25Dewatering
15,126 203 0 0 8,053 0 0 23,382 72,083 95,465 57 182 23916% 0% 0% 0% 8% 0% 0% 24% 76% 100% 24% 76% 100%
Contractor StartMFM Contracting Corp 3/28/2011
Felix Associates LLC 9/28/2009
Moretrench American Corp 1/13/2008
Utilities ImprovementSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
10/25/2008
Total Hours
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
EndIn progress
5/29/2011
* Denotes active contractors
Overall % of Total
8
GC/CM: Lend Lease
Date Range: 4/1/2019 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
Tier I (Direct) Lend Lease US Construction LMB 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Construction Management
* Tier II MFM Contracting Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Utility WorkFelix Associates LLC 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Utility WorkMoretrench American Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Dewatering
0 0 0 0 0 0 0 0 0 0 0 0 00% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total HoursOverall % of Total
* Denotes active contractors
Utilities ImprovementSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
9
Abatement & Demolition
10
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 360,321
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Plumbing Yes $ ‐ $ 4,483 $ 4,483 W‐ESD No Pest Control Yes $ ‐ $ 2,238 $ 2,238 W‐ESD No Storage Yes $ ‐ $ 48,245 $ 48,245 M‐ESD No Mechanical Yes $ ‐ $ 5,796 $ 5,796 MW‐ESD No General Contractor Yes $ ‐ $ 25,069 $ 25,069 WL‐ESD No General Contractor Yes $ ‐ $ 13,163 $ 13,163 L No Plumbing Contractor Yes $ ‐ $ 1,295 $ 1,295 L No General Contractor Yes $ ‐ $ 4,086 $ 4,086 L No Plumbing Contractor Yes $ ‐ $ 18,130 $ 18,130 L No Electrical Contractor Yes $ ‐ $ 31,423 $ 31,423
NON No Doors & Windows Yes $ ‐ $ 4,308 $ 4,308 NON No Electrical Contractor Yes $ ‐ $ 1,120 $ 1,120 NON No Environmental Services Yes $ ‐ $ 1,950 $ 1,950 NON No Asbestos Removal Yes $ ‐ $ 400 $ 400 NON No Uniforms Yes $ ‐ $ 344 $ 344 NON No Contractor Yes $ ‐ $ 46,640 $ 46,640 NON No Specialities Yes $ ‐ $ 74,935 $ 74,935 NON No Moving Yes $ ‐ $ 45,750 $ 45,750 NON No Mechanical Yes $ ‐ $ 7,800 $ 7,800 NON No Air Quality Yes $ ‐ $ 14,177 $ 14,177 NON No Doors & Windows Yes $ ‐ $ 8,554 $ 8,554 NON No Specialities Yes $ ‐ $ 415 $ 415
$ ‐ $ 360,321 $ 360,321 $ ‐ $ 153,928 $ 153,928
Non‐MWL Direct Spend Total $ ‐ $ 206,393 $ 206,393 0% 43% 43%
Date: 06/30/2019
Pro Roll Inc
G & K Services CoGotham WaterproofingInst Recycling NetworkJC Duggan Inc
Omega Laboratories
Titan Plumbing & Heating LLC
Abbey Locksmiths IncAccess Control Technologies IncAffiliated Environmental Serv. (AES)Degmor Inc
William Hird & Co Inc
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Name/Address/Phone # (if available) otherwise enter Trade
Name
DIRECT SPEND VENDORS (Tier I)
SMR Contracting Corp
Innovative Building Solutions LLCIzzo Construction Corp
Northstar Mechanical Inc
PSEC Plumbing & Heating Co Inc
Twins Electric Corp
NON:
MWL:
First Choice Mechanical Inc
Black Widow Termite & Pest Control CorpClancy Cullen Storage Co Inc
Absolute Plumbing & Heating Corp
In Progress
Columbia University Owner
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
OWNER
Abatement & Demolition
6/30/2019
Columbia University
Trade
410 West 118th Street, NY, NY 10027
11
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 24,923,779
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Construction Management Yes $ 4,491,955 $ 25,730,418 $ 24,923,779
$ 4,491,955 $ 25,730,418 $ 24,923,779 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ 4,491,955 $ 25,730,418 $ 24,923,779 0% 0% 0%
Date: 06/30/2019
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Lend Lease US Construction LMB
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Abatement & Demolition
12
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 4,679,500 $ 4,679,500 $ 3,931,426
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No General Contractor Yes $ ‐ $ 4,679,500 $ 3,931,426
$ ‐ $ 4,679,500 $ 3,931,426 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ ‐ $ 4,679,500 $ 3,931,426 0% 0% 0%
Date: 06/30/2019
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Abatement & Demolition
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Par Environmental Corporation
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
13
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 4,491,955 $ 25,730,418 $ 24,923,779
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
Work Completed:W‐ESD No Misc Concrete Yes $ ‐ $ 68,310 $ 68,310 W‐ESD No General Contractor Yes $ 455,000 $ 432,900 $ 432,900 MW‐ESD No Security Yes $ 137,063 $ 326,096 $ 326,096 MW‐ESD No General Contractor Yes $ ‐ $ 163,000 $ 163,000 MWL‐ESD No Security Yes $ ‐ $ 523,867 $ 523,867 M‐ESD No General Contractor Yes $ 186,000 $ 189,719 $ 189,719 MWL‐ESD No Construction Management Yes $ ‐ $ 29,256 $ 29,256 MWL‐ESD No Suprintendent‐Civil/Site Yes $ ‐ $ 8,574 $ 8,574
Work Completed:NON No Demolition & Abatement Contractor Yes $ 879,000 $ 819,596 $ 819,596 NON No Demolition & Abatement Contractor Yes $ 2,975,000 $ 2,975,000 $ 2,975,000 NON No Demolition & Abatement Contractor Yes $ 875,000 $ 735,000 $ 735,000 NON No Demolition & Abatement Contractor Yes $ ‐ $ 334,642 $ 334,642 NON No Demolition & Abatement Contractor Yes $ 1,818,000 $ 1,818,183 $ 1,818,183 NON No Demolition & Abatement Contractor Yes $ 7,100,000 $ 7,100,000 $ 7,100,000
Work In Progress:NON No Demolition & Abatement Contractor Yes $ ‐ $ 1,267,032 $ 1,267,032 NON No Demolition & Abatement Contractor Yes $ ‐ $ 587,326 $ 587,326 NON No Demolition & Abatement Contractor Yes $ 2,627,000 $ 2,492,972 $ 2,492,972 NON No Miscellaneous Metal Work Yes $ ‐ $ 119,310 $ 119,310
$ 17,052,063 $ 19,990,783 $ 19,990,783 $ 778,063 $ 1,741,722 $ 1,741,722
Non‐MWL Tier II Total $ 16,274,000 $ 18,249,061 $ 18,249,061 17% 7% 7%
Date: 06/30/2019
Breeze National Inc ‐ Areas 7 & 8Par Environmental Corp ‐ Area 7 (Site 22, 29, 30, 31)Par Environmental Corp ‐ Areas 1A & 1B
Post Road Iron Works
Par Environmental Corp ‐ Area 0
Name/Address/Phone # (if available) otherwise enter Trade
In Progress
Commodore Construction Corporation
Breeze National Inc ‐ Area 6
Name
Johnson Security Bureau IncManhattan Business Interiors Inc (MBI)
NON:
Breeze National Inc ‐ Area 3A
The McKissack Group Inc
MWL:
Eddington Security IncDeerpath Construction Corp
Innovative Building Solutions LLC
The McKissack Group Inc
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier I)
SUBCONTRACTORS (Tier II)
Abatement & Demolition
Trade
Lend Lease
Construction Management
Construction Management
6/30/2019622 West 132nd, 2nd fl, New York, NY 10027
Lend Lease
212-939-9580
Par Environmental Corp ‐ Areas 2, 4 & 5
Tier II Grand TotalMWL Tier II Total
MWL % of Tier I
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Par Environmental Corp ‐ Area 9aPar Environmental Corp ‐ Areas 7 (Site 28) & 8
14
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 4,679,500 $ 4,679,500 $ 3,931,426
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W No Supplies Yes $ 110,000 $ 100,000 $ 37,148 MW‐ESD No Expediter / Permit Processing Yes $ 80,000 $ 80,000 $ 48,260 MW‐ESD No Security Yes $ 196,374 $ 196,374 $ 63,919 M‐ESD No Supplies Yes $ 80,000 $ 80,000 $ 39,006 MW‐ESD No Vectoring Yes $ 20,000 $ 29,118 $ 13,416 W‐ESD No Fuel Yes $ 50,000 $ 50,000 $ 5,887 W‐ESD No Loss Control Yes $ 90,000 $ 130,000 $ 119,280 W‐ESD No Electrical Yes $ 54,800 $ 54,800 $ 54,800
NON No Portable Lavatory Yes $ 5,500 $ 5,500 $ 4,117 NON No Fire Alarm Services Yes $ 35,000 $ 67,368 $ 18,316 NON No Scaffolding Services Yes $ 1,112,115 $ 1,112,115 $ 438,952 NON No Noise Control Yes $ 14,000 $ 14,000 $ 7,590
$ 1,847,789 $ 1,919,275 $ 850,691 $ 681,174 $ 720,292 $ 381,716
Non‐MWL Tier II Total $ 1,166,615 $ 1,198,983 $ 468,975 15% 15% 10%
Date: 06/30/2019
General Contractor Area 9B (Site 40)
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Par Environmental Corporation Abatement & Demolition
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Active Systems Inc
Johnson Security Bureau IncPark Avenue Building & Roofing Supplies LLC
Expedite‐Dem Inc
Name Trade
Par Environmental Corporation General Contractor
SUBCONTRACTORS (Tier II)
313 Spook Rock Road, Suffern, New York 10901 212-939-95806/30/2019 In Progress
COMPANY (Tier I)
Tier II Grand TotalMWL Tier II Total
MWL % of Tier I
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Pestrol Inc
Eagle Scaffolding Services Inc
Petroscan Ltd
NON:
Lewis S. Goodfriend & Associates
Call A Head
Safety & Quality Plus Inc
Current Fire Protection
MSR Electrical Construction Corp
15
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 9/24/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 4,729,000 $ 4,529,596 $ 4,529,596
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
MWL‐ESD No Extermination Yes $ 1,013 $ 3,099 $ 3,099
$ 1,013 $ 3,099 $ 3,099 $ 1,013 $ 3,099 $ 3,099
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 0% 0% 0%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier II)
SUBCONTRACTORS (Tier III)
Abatement & DemolitionBreeze National Inc
Trade
General Contracting
212-939-9580622 West 132nd, 2nd fl, New York, NY 10027
Lend Lease
General Contracting
3/22/20126/30/2019
Name
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Pestrol Inc
Breeze National Inc
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
16
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,818,000 $ 1,818,183 $ 1,818,183
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
Expedite‐Dem Inc MW‐ESD No Sidewalk Bridge & Scaffold Yes $ ‐ $ 126,400 $ 126,400 W‐ESD No Expeditor Yes $ 50,000 $ 17,610 $ 17,610 L No Building Supplies Yes $ 30,000 $ 11,246 $ 11,246 M‐ESD No Scaffolding Yes $ 163,000 $ 282,192 $ 282,192 L No Temporary Toilets Yes $ 8,000 $ 5,804 $ 5,804 W‐ESD No Fuel/Diesel Yes $ ‐ $ 870 $ 870 L No Equipment Supplier Yes $ ‐ $ 10,234 $ 10,234 W‐ESD No Safety Yes $ ‐ $ 30,000 $ 30,000 MWL‐ESD No Vectoring Yes $ ‐ $ 15,000 $ 15,000 M‐ESD No Recycle/Waster Removal Yes $ 100,000 $ 16,093 $ 16,093 L No Material Supplier Yes $ ‐ $ 6,526 $ 6,526 MW‐ESD No Material Supplier Yes $ ‐ $ 6,892 $ 6,892 W‐ESD No Utility Supplier Yes $ ‐ $ 50,000 $ 50,000
$ 351,000 $ 578,867 $ 578,867 $ 351,000 $ 578,867 $ 578,867
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 19% 32% 32%
Date: 06/30/2019
MWL % of Tier II
Tier III Grand TotalMWL Tier III Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Pearlgreen
Sienna Environmental Technologies LLC
Marguerite Connelly Your Expediter Inc
JEG Inc
Atlas Equipment Rentals
Adco Electrical Corp
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier II)
SUBCONTRACTORS (Tier III)
Abatement & DemolitionAreas 1A & 1B
Par Environmental Corp
Trade
General Contracting
212-939-95801/12/2011
Name
6/30/2019
Lend Lease
Par Environmental Corp
A Royal FlushPetroscan Ltd
Safety & Quality Plus Inc
Coral Management
Pestrol Inc
Metropolitan Enterprises Inc, DBA Target Scaffolding
General Contracting622 West 132nd, 2nd fl, New York, NY 10027
17
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2009 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 7,100,000 $ 7,100,000 $ 7,100,000
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Carting Yes $ ‐ $ 8,130 $ 8,130 MW‐ESD No Expeditor Yes $ 180,000 $ 160,000 $ 160,000 M‐ESD No Sidewalk Bridge & Scaffolding Yes $ ‐ $ 249,768 $ 249,768 M No Scaffolding Yes $ ‐ $ 669,089 $ 669,089 L No Temporary Toilets Yes $ 40,000 $ 11,295 $ 11,295 W‐ESD No Fuel/Diesel Yes $ 65,000 $ 62,572 $ 62,572 L No Equipment Supplier Yes $ 120,000 $ 62,464 $ 62,464 MW‐ESD No Material Supplier Yes $ 125,000 $ 120,644 $ 120,644 M‐ESD No Material Supplier Yes $ ‐ $ 33,182 $ 33,182 M‐ESD No Vectoring Yes $ 185,000 $ 246,774 $ 246,774 M‐ESD No General Conditions Yes $ ‐ $ 68,968 $ 68,968 MWL‐ESD No Vectoring Yes $ 35,000 $ 28,056 $ 28,056 W‐ESD No Safety Yes $ 140,000 $ 107,315 $ 107,315 WL‐ESD No ACM Disposal Yes $ ‐ $ 95,734 $ 95,734 W‐ESD No Expeditor Yes $ ‐ $ 38,340 $ 38,340 M‐ESD No Safety Yes $ ‐ $ 13,537 $ 13,537 ML‐ESD No Plumbing/Heating Yes $ ‐ $ 2,350 $ 2,350
$ 890,000 $ 1,978,218 $ 1,978,218 $ 890,000 $ 1,978,218 $ 1,978,218
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 13% 28% 28%
Date: 06/30/2019
Tier III Grand TotalMWL Tier III Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
MWL % of Tier II
General Contracting622 West 132nd, 2nd fl, New York, NY 10027
Tri State Transfer Associates Inc
Name
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Rizzo Environmental Services Corp
Pestrol IncSafety & Quality Plus Inc
Ann Hickey PEBlue Lake Crane LLCRobert Parchment Plumbing & Heating Inc
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier II)
SUBCONTRACTORS (Tier III)
Abatement & DemolitionAreas 2, 4 & 5
Par Environmental Corp
Trade
General Contracting
212-939-95806/30/2019
Par Environmental Corp
Lend Lease
10/1/2011
JEG Inc
Atlas Equipment RentalsSienna Environmental Technologies LLC
Manhattan Business Interiors Inc (MBI)
Park Avenue Building & Roofing Supplies LLC
Expedite‐Dem IncA Tech Electric Enterprise Inc
A Royal FlushPetroscan Ltd
Metropolitan Enterprises Inc
18
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 10/11/2012 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 2,627,000 $ 2,492,972 $ 2,492,972
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Electrical Yes $ 50,000 $ 26,594 $ 26,594 MW‐ESD No Expeditor Yes $ 88,000 $ 54,960 $ 54,960 W‐ESD No Expeditor Yes $ 18,000 $ 15,855 $ 15,855 M No Scaffolding Yes $ 500,000 $ 158,486 $ 158,486 WL‐ESD No ACM Disposal Yes $ 30,000 $ 19,185 $ 19,185 W‐ESD No Safety Yes $ 65,000 $ 91,245 $ 91,245 MWL‐ESD No Vectoring Yes $ 20,000 $ 5,859 $ 5,859 L No Equipment Supplier Yes $ 100,000 $ 35,811 $ 35,811 M‐ESD No Recycle/Waster Removal Yes $ 80,000 $ 2,009 $ 2,009 W‐ESD No Fuel Supplier Yes $ 25,000 $ 11,654 $ 11,654 MW‐ESD No Supplier Yes $ ‐ $ 47,433 $ 47,433 M‐ESD No Material Supplier Yes $ ‐ $ 10,246 $ 10,246 W‐ESD No Noise Control Yes $ 8,000 $ 8,050 $ 8,050 W No Scaffolding Yes $ ‐ $ 20,686 $ 20,686
$ 984,000 $ 508,073 $ 508,073 $ 984,000 $ 508,073 $ 508,073
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 37% 20% 20%
Date: 06/30/2019
MWL % of Tier II
Tier III Grand TotalMWL Tier III Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Palace Hoisting & Scaffolding Corp of NY
Name
Name/Address/Phone # (if available) otherwise enter Trade
MWL:MSR Electrical Construction Corp
Park Avenue Building & Roofing Supplies LLCCreative Environment Solutions Corp
Petroscan Ltd
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier II)
SUBCONTRACTORS (Tier III)
Abatement & DemolitionAreas 7 (Site 28) & 8
Par Environmental Corp
Trade
General Contracting
212-939-95806/30/2019
Lend Lease
General Contracting622 West 132nd, 2nd fl, New York, NY 10027
In Progress
Pestrol IncAtlas Equipment Rentals
Contracting Supply Solutions
JEG Inc
Par Environmental Corp
Metropolitan Enterprises Inc
Expedite‐Dem IncAnn Hickey PE
Tri State Transfer Associates IncSafety & Quality Plus Inc
19
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 11/30/2012 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 560,750 $ 587,326 $ 587,326
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Electrical Yes $ 15,000 $ 4,590 $ 4,590 MW‐ESD No Expeditor Yes $ 35,000 $ 32,850 $ 32,850 W‐ESD No Expeditor Yes $ 10,000 $ ‐ $ ‐ M No Scaffolding Yes $ 50,000 $ 44,093 $ 44,093 WL‐ESD No ACM Disposal Yes $ 15,000 $ 30,491 $ 30,491 W‐ESD No Safety Yes $ 20,000 $ 25,122 $ 25,122 MWL‐ESD No Vectoring Yes $ 10,000 $ 997 $ 997 L No Equipment Supplier Yes $ 10,000 $ 11,817 $ 11,817 M‐ESD No Recycle/Waster Removal Yes $ 25,000 $ 6,740 $ 6,740 W‐ESD No Fuel Supplier Yes $ 5,000 $ ‐ $ ‐ M‐ESD No Material Supplier Yes $ ‐ $ 5,727 $ 5,727 W‐ESD No Temporary Toilets Yes $ 8,000 $ 5,450 $ 5,450
$ 203,000 $ 167,877 $ 167,877 $ 203,000 $ 167,877 $ 167,877
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 36% 29% 29%
Date: 06/30/2019
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Atlas Equipment RentalsJEG IncPetroscan LtdPark Avenue Building & Roofing Supplies LLCCreative Environment Solutions Corp
Pestrol Inc
Par Environmental Corp General Contracting
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:MSR Electrical Construction CorpExpedite‐Dem IncAnn Hickey PEMetropolitan Enterprises IncTri State Transfer Associates IncSafety & Quality Plus Inc
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeasePar Environmental Corp Abatement & DemolitionGeneral Contracting Area 9A622 West 132nd, 2nd fl, New York, NY 10027 212-939-95806/30/2019 In Progress
COMPANY (Tier II)
20
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 11/30/2012 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,317,500 $ 1,267,032 $ 1,267,032
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Electrical Yes $ 25,000 $ 4,250 $ 4,250 MW‐ESD No Expeditor Yes $ 30,000 $ 27,566 $ 27,566 W‐ESD No Expeditor Yes $ 10,000 $ 11,285 $ 11,285 WL‐ESD No ACM Disposal Yes $ 20,000 $ 55,828 $ 55,828 W‐ESD No Safety Yes $ 30,000 $ 10,027 $ 10,027 MWL‐ESD No Vectoring Yes $ 5,000 $ 2,450 $ 2,450 W‐ESD No Fuel Supplier Yes $ 5,000 $ 1,308 $ 1,308 MW‐ESD No Supplier Yes $ 20,000 $ 1,161 $ 1,161 W No Scaffolding Yes $ 150,000 $ 118,332 $ 118,332 M‐ESD No Carting Yes $ 100,000 $ 35,750 $ 35,750
$ 395,000 $ 267,957 $ 267,957 $ 395,000 $ 267,957 $ 267,957
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 30% 21% 21%
Date: 06/30/2019
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
Contracting Supply SolutionsPalace Hoisting & Scaffolding Corp of NYCuenca Coronel Trucking Co
Petroscan Ltd
Par Environmental Corp General Contracting
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:MSR Electrical Construction CorpExpedite‐Dem IncAnn Hickey PETri State Transfer Associates IncSafety & Quality Plus IncPestrol Inc
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeasePar Environmental Corp Abatement & DemolitionGeneral Contracting Area 0622 West 132nd, 2nd fl, New York, NY 10027 212-939-95806/30/2019 In Progress
COMPANY (Tier II)
21
GC/CM: Par Environmental / Lend Lease
Date Range: 8/1/2008 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
Tier I (Direct) Lend Lease US Construction LMB 185 3% 0 0% 0 0% 0 0% 2,628 43% 0 0% 0 0% 2,813 46% 3,309 54% 6,122 5 38% 8 62% 13Construction Management
* Tier II A Tech Electric Enterprise 461 79% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 461 79% 126 21% 587 9 82% 2 18% 11Sidewalk Bridge & ScaffoldingBreeze National Inc 11,338 56% 0 0% 122 1% 336 2% 2,817 14% 0 0% 0 0% 14,613 72% 5,774 28% 20,386 73 66% 38 34% 111Demo & Abatement Contractor
* Current Fire Protection 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 88 100% 88 0 0% 2 100% 2Fire ProtectionDeerpath Construction Corp 232 12% 0 0% 0 0% 0 0% 265 14% 0 0% 0 0% 497 26% 1,446 74% 1,943 3 25% 9 75% 12Demo & Abatement Contractor
* Eagle Scaffolding Services 4,560 29% 432 3% 0 0% 48 0% 497 3% 0 0% 0 0% 5,537 36% 10,055 64% 15,592 31 45% 38 55% 69Scaffolding Services
* Johnson Security Bureau 3,268 75% 0 0% 0 0% 16 0% 840 19% 0 0% 8 0% 4,132 95% 230 5% 4,362 21 95% 1 5% 22Security
* Par Environmental Corp 68,959 59% 328 0% 0 0% 5,556 5% 3,659 3% 0 0% 0 0% 78,502 68% 37,722 32% 116,223 219 70% 93 30% 312Demo & Abatement Contractor
89,003 760 122 5,956 10,705 0 8 106,554 58,748 165,302 361 191 55254% 0% 0% 4% 6% 0% 0% 64% 36% 100% 65% 35% 100%
Contractor StartA Tech Electric Enterprise 11/28/2018Breeze National Inc 9/17/2009Current Fire Protection 12/4/2018Deerpath Construction Corp 9/16/2009Eagle Scaffolding Services 10/22/2018Johnson Security Bureau 11/10/2018Par Environmental Corp 10/5/2009
In Progress
Abatement and DemolitionSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
* Denotes active contractors1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
EndIn Progress
In Progress
Total HoursOverall % of Total
3/28/2012In Progress7/13/2010In Progress
22
GC/CM: Lend Lease
Date Range: 4/1/2019 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
Tier I (Direct) Lend Lease US Construction LMB 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Construction Management
* Tier II A Tech Electric Enterprise 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Sidewalk Bridge & ScaffoldingBreeze National Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Demo & Abatement Contractor
* Current Fire Protection 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Fire ProtectionDeerpath Construction Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Demo & Abatement Contractor
* Eagle Scaffolding Services 3,855 31% 432 3% 0 0% 48 0% 0 0% 0 0% 0 0% 4,335 35% 8,207 65% 12,542 15 38% 25 63% 40Scaffolding Services
* Johnson Security Bureau 1,360 83% 0 0% 0 0% 0 0% 40 2% 0 0% 8 0% 1,408 86% 230 14% 1,637 10 91% 1 9% 11Security
* Par Environmental Corp 4,976 37% 312 2% 0 0% 168 1% 0 0% 0 0% 0 0% 5,456 40% 8,131 60% 13,586 23 40% 35 60% 58Demo & Abatement Contractor
10,190 744 0 216 40 0 8 11,198 16,567 27,765 48 61 10937% 3% 0% 1% 0% 0% 0% 40% 60% 100% 44% 56% 100%
Abatement and DemolitionSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
* Denotes active contractors1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total HoursOverall % of Total
23
Jerome L. Greene Science Center
24
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No $ 8,883,783
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Plumbing Yes $ ‐ $ 10,896 $ 10,896 M No Electrical Yes $ ‐ $ 13,796 $ 13,796 W‐ESD No Pest Control Yes $ ‐ $ 1,550 $ 1,550 M‐ESD No Plumbing Yes $ ‐ $ 23,017 $ 23,017 M‐ESD No General Contractor Yes $ ‐ $ 290,392 $ 290,392 W No Moving & Relocation Yes $ ‐ $ 1,214 $ 1,214 W‐ESD No Signage Yes $ ‐ $ 1,515 $ 1,515 L No Electrical Yes $ ‐ $ 8,995 $ 8,995 MW‐ESD No Cleaning Yes $ ‐ $ 110,210 $ 110,210 W No Printing Service Yes $ ‐ $ 99,558 $ 99,558 WL‐ESD No General Contractor Yes $ ‐ $ 35,945 $ 35,945 L No General Contractor Yes $ ‐ $ 238,826 $ 238,826 WL‐ESD No General Contractor Yes $ ‐ $ 43,258 $ 43,258 L No Telecommunications Conduit Installation Yes $ ‐ $ 41,938 $ 41,938 L No Electrical Yes $ ‐ $ 3,067 $ 3,067 MWL‐ESD No Cleaning Yes $ ‐ $ 16,505 $ 16,505 L No Construction Management Yes $ ‐ $ 1,846 $ 1,846 W No Supplies Yes $ ‐ $ 7,994 $ 7,994 L No Plumbing Yes $ ‐ $ 644 $ 644
NON No Safeway Fire ‐ Monitoring Yes $ ‐ $ 4,893 $ 4,893 NON No Doors & Windows Yes $ ‐ $ 990 $ 990 NON No Debris Removal Yes $ ‐ $ 1,047 $ 1,047 NON No General Contractor Yes $ ‐ $ 627,492 $ 627,492 NON No Materials & Equipment Yes $ ‐ $ 422 $ 422 NON No Mechanical Yes $ ‐ $ 3,630 $ 3,630 NON No Materials & Equipment Yes $ ‐ $ 19,923 $ 19,923 NON No AV/Cable/Telecom Yes $ ‐ $ 68,605 $ 68,605 NON No Moving & Relocation Yes $ ‐ $ 14,403 $ 14,403 NON No Materials & Equipment Yes $ ‐ $ 151,998 $ 151,998 NON No Decontamination Services Yes $ ‐ $ 137,314 $ 137,314 NON No Supplier Yes $ ‐ $ 4,019,530 $ 4,019,530
Bruker Nano Inc NON No Moving & Relocation Yes $ ‐ $ 145,430 $ 145,430 NON No Moving & Relocation Yes $ ‐ $ 96,020 $ 96,020 NON No UWPA Suppliers Yes $ ‐ $ 42,644 $ 42,644 NON No Supplier Yes $ ‐ $ 26,000 $ 26,000 NON No Materials & Equipment Yes $ ‐ $ 29,641 $ 29,641 NON No Scale Repair Yes $ ‐ $ 674 $ 674 NON No Furniture Yes $ 62,809 $ 62,809 $ 62,809
Absolute Plumbing & Heating Corp
Black Widow Termite & Pest Control
CitiStructure
Gamma Cleaning Concepts IncDoumas Electric Inc
Green Girl Printing and Messenger Inc
Titan Plumbing & Heating LLC
Bruker Biospin Corp
King Rose of NY Inc
Crown Sign Systems Inc
Izzo Construction Corp
Mamais Contracting Corp
Central Moving & Storage Co
Cryostar Industries IncDancker Sellew & Douglas
Bioquell Inc
Advance Relocation & Storage
Coherent IncCity of New York Parks and Recreation
Carl Zeiss Microscopy LLC
MWL:
Action Carting Environmental Servic
Beckman Coulter Inc
Airgas E
MFM Contracting CorpPlatinum Electric Service IncScrub Clean Maintenance Corp
Watsons Plumbing and Heating
275 Technology Solutions dba Safeway Fire & Protection NON:
Airvel Airconditioning Coporation
Waldner's Business Environments
A Tech Electric Enterprises Inc
Cardoza Plumbing
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
OWNER
DIRECT SPEND VENDORS (Tier I)
Jerome L. Greene Science Center
Name Trade
6/30/2019
Columbia University
Owner
410 West 118th Street, NY, NY 10027
Columbia University
In Progress
Name/Address/Phone # (if available) otherwise enter Trade
Clancy Cullen Moving & Storage Co Inc
Abbey Locksmiths Inc
BH Inc
Aquaneering IncBear Communications Inc
25
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No $ 8,883,783
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
OWNER
DIRECT SPEND VENDORS (Tier I)
Jerome L. Greene Science Center
Name Trade
6/30/2019
Columbia University
Owner
410 West 118th Street, NY, NY 10027
Columbia University
In Progress
Name/Address/Phone # (if available) otherwise enter Trade
NON No Supplies Yes $ ‐ $ 182 $ 182 NON No Flooring Resilient Tile Yes $ ‐ $ 21,484 $ 21,484 NON No Materials & Equipment Yes $ ‐ $ 600,192 $ 600,192 NON No Moving & Relocation Yes $ ‐ $ 40,850 $ 40,850 NON No HVAC Yes $ ‐ $ 15,525 $ 15,525 NON No AV/Cable/Telecom Yes $ ‐ $ 50,289 $ 50,289 NON No General Contractor Yes $ ‐ $ 203,896 $ 203,896 NON No Cleaning Yes $ ‐ $ 424 $ 424 NON No Supplier Yes $ ‐ $ 73,170 $ 73,170 NON No Lab Furniture Yes $ ‐ $ 66,353 $ 66,353
Leica Microsystems Inc NON No Moving & Relocation Yes $ ‐ $ 18,232 $ 18,232 NON No Supplier Yes $ ‐ $ 155,487 $ 155,487 NON No Moving & Relocation Yes $ ‐ $ 19,590 $ 19,590 NON No Electrical Yes $ ‐ $ 1,600 $ 1,600 NON No Equipment Yes $ ‐ $ 84,747 $ 84,747 NON No Supplier Yes $ ‐ $ 7,196 $ 7,196 NON No Materials & Equipment Yes $ ‐ $ 49,132 $ 49,132
Olympus America Inc NON No Moving & Relocation Yes $ ‐ $ 17,500 $ 17,500 NON No Appliances Yes $ ‐ $ 307,485 $ 307,485 NON No Landscaping Yes $ ‐ $ 295 $ 295 NON No Guard Service / Watchman Yes $ ‐ $ 5,797 $ 5,797 NON No Cleaning Yes $ ‐ $ 5,417 $ 5,417 NON No Resilient Flooring & Base Yes $ ‐ $ 9,814 $ 9,814 NON No Moving & Relocation Yes $ ‐ $ 8,460 $ 8,460 NON No Materials & Equipment Yes $ ‐ $ 2,500 $ 2,500 NON No Materials & Equipment Yes $ ‐ $ 29,707 $ 29,707 NON No Equipment Yes $ ‐ $ 4,944 $ 4,944 NON No Moving & Relocation Yes $ ‐ $ 13,250 $ 13,250 NON No HVAC Yes $ ‐ $ 297,006 $ 297,006 NON No Signage Yes $ ‐ $ 1,530 $ 1,530 NON No Doors & Windows Yes $ ‐ $ 192,910 $ 192,910 NON No Telecommunication Yes $ ‐ $ 7,642 $ 7,642 NON No Window Treatment Yes $ ‐ $ 28,420 $ 28,420 NON No Supplier Yes $ ‐ $ 71,426 $ 71,426 NON No Digital Services Yes $ ‐ $ 180 $ 180 NON No Supplier Yes $ ‐ $ 24,981 $ 24,981 NON No Signage Yes $ ‐ $ 7,539 $ 7,539 NON No Furniture Yes $ 34,000 $ 34,000 $ 34,000
$ 96,809 $ 8,883,783 $ 8,883,783 $ ‐ $ 951,166 $ 951,166
Non‐MWL Direct Spend Total $ 96,809 $ 7,932,617 $ 7,932,617 Date: 06/30/2019 0% 11% 11%
Direct Spend Grand Total
Siemens Industry Inc
Par‐Kut International Inc
I.H. Weiss Co Ltd (Town House Specialty Cleaning Co
Formulatrix Inc
Rise Vision USA LLC
PBM LLC
Pureaire Monitoring Systems Inc
Precision Micro Inc
Signs of Success
Lutron Serv Co Inc
Parker Interior Plantscape Inc
Gilbar Industries Inc
Platinum Terrazzo
Psychology Software Tools Inc
Scientific Equipment Product Service
Frames Animal Transportation
JWEISS LLC
LBG Enterprises LLC
Marathon Equipment Company (Delware)Mortech Manufacturing
Pacific Bio‐Material Management Inc
The Sign Works IncTecniplast USATechnical Digital ServicesSteris Corp
MWL Direct Spend Total
MWL % of Total
HB Communications Inc
Star Draperies Inc
Newport Corp
Kewaunee Scientific Corporation
Long Island Scientific
StarCom Communications Service
Fibergrate Composite Structures Inc
SOS Locksmith Corp
Valley City MFGIf there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Hellman Construction Co Inc
Engineer SupplyNON:
26
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 414,765,082
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Construction Management Yes $ 6,722,424 $ 445,313,393 $ 414,765,082
$ 6,722,424 $ 445,313,393 $ 414,765,082 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ 6,722,424 $ 445,313,393 $ 414,765,082 0% 0% 0%
Date: 06/30/2019
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Lend Lease US Construction LMB
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Jerome L. Greene Science Center
27
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 389,626 $ 389,626
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No MBBI Synaptic Corridor Yes $ ‐ $ 389,626 $ 389,626
$ ‐ $ 389,626 $ 389,626 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ ‐ $ 389,626 $ 389,626 0% 0% 0%
Date: 06/30/2019
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Lend Lease US Construction LMB
Columbia University Owner
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Jerome L. Greene Science Center Synapse410 West 118th Street, NY, NY 100276/30/2019 In Progress
OWNER
Name Trade
28
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 6,722,424 $ 445,313,393 $ 414,765,082
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Plumbing Yes $ ‐ $ 19,795,144 $ 19,795,144 W‐ESD No Security Yes $ ‐ $ 1,835 $ 1,835 W‐ESD No HVAC‐Sheetmetal Yes $ ‐ $ 1,876,397 $ 1,187,673 M‐ESD No Safety Equipment Yes $ ‐ $ 2,936,757 $ 2,942,310 M‐ESD No Drywall Yes $ ‐ $ 74,045 $ 68,492 MW‐ESD No Security Yes $ ‐ $ 1,112,389 $ 1,112,389 W‐ESD Yes Electrical Yes $ ‐ $ 2,144,384 $ 2,144,384 W‐ESD Yes Clear & Prep Site Yes $ ‐ $ 23,614 $ 23,614 L No Drywall Yes $ ‐ $ 10,637,272 $ 10,632,678 L No Resilient Flooring & Base Yes $ ‐ $ 4,594 $ 4,594 M‐ESD No Intumescent Painting Yes $ ‐ $ 3,245,444 $ 3,245,444 M‐ESD No Paint & Coatings Yes $ ‐ $ 2,332,254 $ 2,317,986 L No Plumbing Yes $ ‐ $ 20,887 $ 20,887 MWL‐ESD No Security Yes $ ‐ $ 1,349,760 $ 1,349,760 M No Scaffolding Yes $ ‐ $ 600,239 $ 541,541 L No Utilities Yes $ ‐ $ 86,311 $ 86,311 L No Electrical Yes $ ‐ $ 2,977 $ 2,977 MWL‐ESD No Spray Fireproofing Yes $ ‐ $ 1,379,934 $ 1,379,934 W‐ESD No Concrete Yes $ ‐ $ 482,707 $ 482,707 MWL‐ESD No Construction Management Yes $ ‐ $ 3,879,082 $ 3,879,082
NON:NON No Toilet Partitions Yes $ ‐ $ 114,060 $ 114,060 NON No Electrical Yes $ ‐ $ 46,147 $ 46,147 NON No Electrical Yes $ ‐ $ 17,009,948 $ 17,009,428 NON No Millwork Yes $ ‐ $ 5,418,876 $ 5,418,876 NON No Ornamental Metal Yes $ ‐ $ 1,644,213 $ 1,644,213 NON No Glass & Glazing Yes $ ‐ $ 1,006,114 $ 1,006,114 NON No Superstructure Steel Yes $ ‐ $ 31,550,568 $ 31,550,568 NON No Roofing Yes $ ‐ $ 2,776,430 $ 2,745,454 NON Yes Electrical Yes $ ‐ $ 3,216,576 $ 3,216,576 NON Yes Clear & Prep Site Yes $ ‐ $ 35,420 $ 35,420 NON No Resilient Flooring & Base Yes $ ‐ $ 1,211,301 $ 1,211,301 NON No Electrical Yes $ ‐ $ 20,801,178 $ 19,957,548 NON No Electrical Yes $ ‐ $ 36,134,792 $ 35,677,671 NON No HVAC Systems Yes $ ‐ $ 678,094 $ 671,369
In Progress
Construction Management
Name/Address/Phone # (if available) otherwise enter Trade
EJ/Egg Electric JV ‐ (EJ Electric)
MWL:
EJ/Egg Electric JV ‐ (Egg Electric Inc)
Cassone Leasing Inc
Creative Construction
Elite Interiors Systems Inc
Metropolitan Enterprises Inc
A Liss & Company Inc
Cardoza Plumbing
Creative Construction
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier I)
SUBCONTRACTORS (Tier II)
Jerome L. Greene Science Center
Name
Lend Lease
Trade
Construction Management
6/30/2019622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
EJ/Egg Electric JV ‐ (Egg Electric Inc)
Elite Interiors Systems IncFine Painting & Decorating Company IncFine Painting & Decorating Company Inc
Johnson Security Bureau Inc
MFM Contracting Corp
Bauerschmidt & Sons IncChampion Metal & Glass Inc Champion Metal & Glass Inc Cives Corp
The McKissack Group Inc
Morell Brown Corp
Celtic Sheetmetal Inc
Lend Lease
New York Concrete
Eddington Security Inc
EJ/Egg Electric JV ‐ (EJ Electric)
Giachetti Plumbing
Forest ElectricFresh Meadow Mechanical Corp
MFM Contracting Corp
Elite Floors IncFive Star Electric Corp
Eagle One Roofing Contractors Inc
B&G Electrical Contractors of NYASR Electrical Contracting Inc
29
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 6,722,424 $ 445,313,393 $ 414,765,082
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
In Progress
Construction Management
Name/Address/Phone # (if available) otherwise enter Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier I)
SUBCONTRACTORS (Tier II)
Jerome L. Greene Science Center
Name
Lend Lease
Trade
Construction Management
6/30/2019622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
Lend Lease
NON:NON No Elevators Yes $ ‐ $ 122,863 $ 122,863 NON No Raised Access Flooring Yes $ ‐ $ 786,302 $ 786,302 NON No Hoist / Bridges / Scaffold Yes $ ‐ $ 19,259 $ 19,259 NON No Clear & Prep Site Yes $ ‐ $ 36,948 $ 36,663 NON No Drywall Yes $ ‐ $ 16,276,467 $ 16,015,474 NON No Fire Protection Systems Yes $ ‐ $ 120,000 $ 101,104 NON No Ceramic Tile Yes $ ‐ $ 2,269,407 $ 2,269,407 NON No Food Service Equipent Yes $ ‐ $ 147,572 $ 147,572 NON No Overhead Doors Yes $ ‐ $ 891,273 $ 891,273 NON No Glass and Glazing Yes $ ‐ $ 4,975,517 $ 4,975,517 NON Yes Mechanical Yes $ ‐ $ 61,135,336 $ 59,901,853 NON No Polished Concrete Yes $ ‐ $ 360,842 $ 360,842 NON No Masonry Yes $ ‐ $ 3,388,621 $ 3,317,103 NON No Safety Equipment Yes $ ‐ $ 444,519 $ 444,519 NON No Elevators Yes $ ‐ $ 4,131,223 $ 4,131,223 NON No Spray Fireproofing Yes $ ‐ $ 691,497 $ 691,497 NON No Resilient Flooring & Base Yes $ ‐ $ 4,027,552 $ 4,027,552 NON No Metal Work Yes $ ‐ $ 4,093,049 $ 4,093,049 NON No Dewatering Yes $ ‐ $ 6,617,522 $ 6,617,522 NON No Above Grade Concrete Yes $ ‐ $ 10,064,686 $ 10,064,656 NON No HVAC Systems Yes $ ‐ $ 14,460,998 $ 14,440,506 NON No Electrical Yes $ ‐ $ 22,078 $ 20,491 NON No Clear & Prep Site Yes $ ‐ $ 437,827 $ 437,827 NON No HVAC Systems Yes $ ‐ $ 42,306 $ 42,306 NON No Clear & Prep Site Yes $ ‐ $ 135,259 $ 105,204 NON No Hoist Yes $ ‐ $ 2,589,742 $ 2,589,742 NON No Resilient Flooring & Base Yes $ ‐ $ 511,499 $ 511,499 NON No Metal Stairs Yes $ ‐ $ 6,071,083 $ 6,039,083 NON No HVAC Systems Yes $ ‐ $ 29,160,593 $ 28,488,897 NON No Drywall Yes $ ‐ $ 8,150 $ 8,150 NON No Plumbing Yes $ ‐ $ 4,170 $ 4,170 NON No Misc. Metal Yes $ ‐ $ 45,269 $ 45,269 NON No Window Washing Equipment Yes $ ‐ $ 271,870 $ 271,870
$ ‐ $ 347,991,042 $ 343,544,751 $ ‐ $ 51,986,026 $ 51,219,742
Non‐MWL Tier II Total $ ‐ $ 296,005,016 $ 292,325,009
Post Road Iron WorksPlatinum Terrazzo
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Rael Automatic Sprinkler
Winsafe Corp
Island AcousticsIsland Acoustics
Hi Tech Data Floors Inc
Nets That Work
PAL Environmental Safety CorpOtis Elevator Company
McKeon Door East
MW Mechanical IncNavillus Tile Inc
Tier II Grand TotalMWL Tier II Total
Siemens Industry Inc
WDF IncWDF Inc
Walters LLC
Modulo 3 Corporation DBA Unifor
M Tucker A Division of Singer NY LLC
Intricate Construction
Jantile Inc
H.S.E. System Inc (Metropolitan Enterprises Inc)
Handi‐Lift Elevator LLC
WDF Inc
Navillus Tile Inc
WDF Inc
Universal Services Group
Trystate Mechanical Inc
Universal Builders SupplyUnited Drilling & Cutting Corp
RCC Concrete Corp
Siemens Industry IncSkanska
30
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 6,722,424 $ 445,313,393 $ 414,765,082
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
In Progress
Construction Management
Name/Address/Phone # (if available) otherwise enter Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier I)
SUBCONTRACTORS (Tier II)
Jerome L. Greene Science Center
Name
Lend Lease
Trade
Construction Management
6/30/2019622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
Lend Lease
Date: 06/30/2019 0% 12% 12%MWL % of Tier I
31
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ ‐ $ 389,626 $ 389,626
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Electrical Corporation Yes $ ‐ $ 148,488 $ 148,488 NON No Miscellaneous Metal Yes $ ‐ $ 235,380 $ 235,380
$ ‐ $ 383,868 $ 383,868 $ ‐ $ ‐ $ ‐
Non‐MWL Tier II Total $ ‐ $ 383,868 $ 383,868 0% 0% 0%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier II Grand TotalMWL Tier II Total
MWL % of Tier I
Forest ElectricPost Road Iron Works
NON:
Name/Address/Phone # (if available) otherwise enter Trade
622 West 132nd, 2nd fl, New York, NY 10027 212-939-95806/30/2019 In Progress
COMPANY (Tier I)
Name Trade
Lend Lease Construction Management
SUBCONTRACTORS (Tier II)
Construction Management
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease Jerome L. Greene Science Center Synapse
32
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 28,270,835 $ 31,550,568 $ 31,550,568
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
Baco Enterprises Inc L No Field Bolts Yes $ 276,449 $ 230,714 $ 230,714 L No Safety/Slurry Yes $ 102,900 $ 130,340 $ 130,340 W‐ESD No Structural Steel Material Yes $ 816,232 $ 862,145 $ 862,145 M‐ESD No Installation of Deck & Studs Yes $ 1,573,600 $ 1,492,849 $ 1,492,849 W‐ESD No Exterior Intumescent Columns Yes $ 400,000 $ 410,982 $ 410,982 W‐ESD No Field Bolts Yes $ ‐ $ 278,110 $ 278,110
Powell Steel Corp M‐ESD No Structural Steel Beams Yes $ ‐ $ 439,775 $ 439,775
$ 3,169,181 $ 3,844,915 $ 3,844,915 $ 3,169,181 $ 3,844,915 $ 3,844,915
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 11% 12% 12%
Date: 06/30/2019
Cives Corp
RKL Building Specialties Co Inc
Baco Enterprises IncCommonwealth Metal Co
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier II)
SUBCONTRACTORS (Tier III)
Jerome L. Greene Science CenterCives Corp
Trade
Structural Steel
315-287-22008 Church Street, Gouverneur, NY 13642
Name
In Progress
L&M Fabrication & Machine Inc
6/30/2019
Lend Lease
Tier III Grand TotalMWL Tier III Total
Kiwi Steel Corp
Structural Steel
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
33
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 10/10/2012 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 6,643,000 $ 10,064,686 $ 10,064,656
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Concrete Ready Mix Supplier Yes $ ‐ $ 774,257 $ 774,257 W‐ESD No Construction Materials Yes $ ‐ $ 33,231 $ 33,231 L No Rebar & Wire Mesh Supplier Yes $ 392,385 $ 492,283 $ 492,283 MW‐ESD No Material Supplier Yes $ ‐ $ 25,018 $ 25,018 M‐ESD No Concrete Ready Mix Supplier Yes $ ‐ $ 472,592 $ 472,592 W No Lumper (Metal Lathing) Yes $ ‐ $ 591,395 $ 561,826
$ 392,385 $ 2,388,776 $ 2,359,207 $ 392,385 $ 2,388,776 $ 2,359,207
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 6% 24% 23%
Date: 06/30/2019
MWL % of Tier II
Tier III Grand TotalMWL Tier III Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
RCC Concrete Corp Cement & Concrete Construction
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Elite Ready Mix
Sanzo Ltd IncNYCON ReadimixB.P. Precise Construction Corp
Wild Woman CoCFS Steel Co
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseRCC Concrete Corp Jerome L. Greene Science CenterCement & Concrete Construction74 State Street, 2nd Floor Westbury, New York 11590 516-279-67876/30/2019 In Progress
COMPANY (Tier II)
34
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/25/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON Yes $ 55,975,000 $ 61,135,336 $ 59,901,853
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No HVAC‐Sheetmetal Yes $ 11,000,000 $ 12,560,561 $ 11,932,486 W‐ESD No HVAC‐Piping Yes $ 14,590,000 $ 16,682,126 $ 16,573,926 W‐ESD No Insulation Yes $ 2,300,000 $ 2,623,213 $ 2,623,213 M‐ESD No HVAC‐Equipment & Rigging Yes $ 1,000,000 $ 1,534,239 $ 1,518,185 W‐ESD No Equipment Rental & Leasing Yes $ ‐ $ 10,000 $ 659 W‐ESD No Safety Consultant Yes $ ‐ $ 343,719 $ 343,719 M‐ESD No Safety Consultant Yes $ ‐ $ 124,160 $ 124,160
$ 28,890,000 $ 33,878,018 $ 33,116,348 $ 28,890,000 $ 33,878,018 $ 33,116,348
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 52% 55% 55%
Date: 06/30/2019
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseMW Mechanical Inc Jerome L. Greene Science CenterHVAC622 West 132nd Street, New York, NY 10027 718-961-66346/30/2019 In Progress
COMPANY (Tier II)
Safety & Environmental
MW Mechanical Inc HVAC
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Celtic Sheetmetal IncFW Sims IncMate Matura & Sons IncYuen Ling Enterprises IncCassone Leasing IncSafety & Quality Plus Inc
Tier III Grand TotalMWL Tier III Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
MWL % of Tier II
35
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/23/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 20,315,665 $ 20,801,178 $ 19,957,548
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Electrical Yes $ 7,110,483 $ 1,149,916 $ 1,149,916 MW No Electrical Yes $ ‐ $ 1,221,698 $ 1,221,698 W No Electrical Yes $ ‐ $ 816,981 $ 816,981 W‐ESD No Supplier Yes $ ‐ $ 443,752 $ 278,905 W‐ESD No Supplier Yes $ ‐ $ 95,777 $ 94,057
$ 7,110,483 $ 3,728,124 $ 3,561,557 $ 7,110,483 $ 3,728,124 $ 3,561,557
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 35% 18% 18%
Date: 06/30/2019
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseFive Star Electric Corp Jerome L. Greene Science CenterElectrical101-32 101st Street, Ozone Park, NY 11416 718-641-50006/30/2019 In Progress
COMPANY (Tier II)
Five Star Electric Corp Electrical
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Eaton Electric IncEastern Electric Corp of New YorkG‐Squared Electric LLCLB Electric Supply Co.Montana Datacom
Tier III Grand TotalMWL Tier III Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
MWL % of Tier II
36
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 4/20/2012 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 3,900,000 $ 4,131,223 $ 4,131,223
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Cab and Entrance Fabrication Yes $ 674,839 $ 739,014 $ 739,014
$ 674,839 $ 739,014 $ 739,014 $ 674,839 $ 739,014 $ 739,014
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 17% 18% 18%
Date: 06/30/2019
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseOtis Elevator Company Jerome L. Greene Science CenterElevatorsOne Odell Plaza, Suite 120, Yonkers, NY 10701 973-575-31076/30/2019 In Progress
COMPANY (Tier II)
Otis Elevator Company Elevators
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Concept Elevator Group LLC
Tier III Grand TotalMWL Tier III Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
MWL % of Tier II
37
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/25/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 25,166,020 $ 29,218,182 $ 28,546,486
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Insulation Yes $ 1,325,000 $ 1,484,704 $ 1,484,704 W No Material Supplier Yes $ ‐ $ 71,073 $ 71,073 M‐ESD No Material Supplier Yes $ 6,470 $ 98,656 $ 98,656 W No Water Treatment Yes $ ‐ $ 2,547 $ 2,547
$ 1,331,470 $ 1,656,980 $ 1,656,980 $ 1,331,470 $ 1,656,980 $ 1,656,980
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 5% 6% 6%
Date: 06/30/2019
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseWDF Inc Jerome L. Greene Science CenterHVAC30 North Macquesten Parkway, Mount Vernon, NY 10550 914-776-81446/30/2019 In Progress
COMPANY (Tier II)
Purity Laboratories Inc
WDF Inc
NY Pl. Wholesale and Supply Inc
MWL:
HVAC
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
Henry Quentzel Plumping Supply Co IncHailey Insulation Corp
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
38
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 3/12/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 14,250,000 $ 16,396,467 $ 16,116,578
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Lathing Yes $ 478,896 $ 450,285 $ 450,285 W No Laser Curtains Yes $ ‐ $ 197,164 $ 197,164 W‐ESD No Materials Yes $ 3,049,535 $ 1,573,367 $ 1,573,367 MW‐ESD No Manlifts Yes $ 93,600 $ 86,965 $ 86,965 W‐ESD No Finishing Yes $ ‐ $ 20,226 $ 20,226 W No Firestopping Yes $ ‐ $ 97,976 $ 97,976
$ 3,622,031 $ 2,425,983 $ 2,425,983 $ 3,622,031 $ 2,425,983 $ 2,425,983
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 25% 15% 15%
Date: 06/30/2019
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseIsland Acoustics Jerome L. Greene Science CenterCarpentry518 Johnson Ave Bohemia, NY 11716 631-234-45006/30/2019 In Progress
COMPANY (Tier II)
Carpentry
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:CenterSpan
Island Acoustics
Firestop Solutions
Green DepotAIWHalmark
Beamstop'r
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
39
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 5/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 31,000,000 $ 36,134,792 $ 35,677,671
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Lighting Material Supplier Yes $ 9,735,705 $ 10,481,341 $ 10,481,341 M‐ESD No Electrical Material Supplier Yes $ 975 $ 975 $ 975 L No Electrical Material Supplier Yes $ 4,161 $ 146,703 $ 146,703 W‐ESD No Electrical Material Supplier Yes $ 80,541 $ 853,947 $ 853,947 W‐ESD No Electrical Material Supplier Yes $ ‐ $ 80,114 $ 80,114 W‐ESD No Electrical Material Supplier Yes $ ‐ $ 170,758 $ 170,758 W No Electrical Material Supplier Yes $ ‐ $ 600 $ 600 W‐ESD No Electrical Material Supplier Yes $ ‐ $ 28,338 $ 28,338
$ 9,821,382 $ 11,762,776 $ 11,762,776 $ 9,821,382 $ 11,762,776 $ 11,762,776
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 32% 33% 33%
Date: 06/30/2019
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
LB Electric Supply Co.Atlas Switch Co Inc
Forest Electric Electrical
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Belle LightingDumont Electrical IncSmith EI‐DIS Co, IncTurtle & HughesAct Electrical & DataMontana Datacom
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseForest Electric Jerome L. Greene Science CenterElectrical2 Penn Plaza New York, NY 10121 212-318-15006/30/2019 In Progress
COMPANY (Tier II)
40
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 11/20/2012 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 6,200,000 $ 3,749,463 $ 3,677,945
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Masonry Supply Yes $ 500,000 $ 322,323 $ 322,323 L No Rebar Supplier Yes $ 40,000 $ 32,855 $ 32,855 M‐ESD No Drafting Yes $ 10,000 $ 10,438 $ 10,438 L No Concrete Yes $ 10,000 $ 5,769 $ 5,769
$ 560,000 $ 371,385 $ 371,385 $ 560,000 $ 371,385 $ 371,385
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 9% 10% 10%
Date: 06/30/2019
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
Navillus Tile Inc Masonry
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:CD Construction & DesignCFS Steel CoBlue Works IncCasa Redimix
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseNavillus Tile Inc Jerome L. Greene Science CenterMasonry575 5th Ave 29th Floor, New York, NY 10017 212-750-18086/30/2019 In Progress
COMPANY (Tier II)
41
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 9/13/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 12,625,000 $ 17,009,948 $ 17,009,428
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Relay Racks, Ladder Rack and Assoc Yes $ 340,000 $ 7,594 $ 7,594 W‐ESD No Innerduct, Firestop, J‐Hooks & Consumables Yes $ ‐ $ 175,497 $ 175,497 W‐ESD No Conduit & Support Hardware Yes $ 500,000 $ 967,729 $ 967,729 L No Relay Racks, Ladder Rack and Assoc Yes $ ‐ $ 4,178 $ 4,178
NON No Noise Control & Mitigation Yes $ 5,700 $ 8,100 $ 8,100
$ 845,700 $ 1,163,098 $ 1,163,098 $ 840,000 $ 1,154,998 $ 1,154,998
Non‐MWL Tier III Total $ 5,700 $ 8,100 $ 8,100 7% 7% 7%
Date: 06/30/2019
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
B&G Electrical Contractors of NY
Turtle & HughesBenfield
NON:
Montana Datacom
Geocomp Consulting
Electrical
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:G & G Electrical Supply
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseB&G Electrical Contractors of NY Jerome L. Greene Science CenterElectrical7100 New Horizons Blvd. N. Amityville, NY 11701 631-669-60006/30/2019 In Progress
COMPANY (Tier II)
42
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/19/2012 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 6,940,000 $ 6,617,522 $ 6,617,522
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Subcontractor Yes $ 902,200 $ 74,750 $ 74,750 L No Supply Yes $ ‐ $ 289,723 $ 289,723
NON No Supply Yes $ 138,000 $ 1,436 $ 1,436
$ 1,040,200 $ 365,909 $ 365,909 $ 902,200 $ 364,473 $ 364,473
Non‐MWL Tier III Total $ 138,000 $ 1,436 $ 1,436 13% 6% 6%
Date: 06/30/2019
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
Rael Automatic Sprinkler Fire Protection
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:First Women's Fire SystemsFerguson Fire
NON:Ascon
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseRael Automatic Sprinkler Jerome L. Greene Science CenterFire Protection1750 Plaza Avenue New Hyde, NY 11040 516-593-20006/30/2019 In Progress
COMPANY (Tier II)
43
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 5,955,000 $ 14,483,076 $ 14,460,997
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Electrical Material Supplier Yes $ 125,000 $ 125,000 $ 99,502 MW‐ESD No Electrical Material Yes $ 80,000 $ 80,000 $ 80,000 M‐ESD No Electrician Yes $ 1,320,128 $ 1,483,222 $ 1,483,222
NON No Electrician Yes $ 2,811,000 $ 3,123,628 $ 3,123,628 NON No Electrician Yes $ 1,618,000 $ 1,626,878 $ 1,626,878
$ 5,954,128 $ 6,438,728 $ 6,413,230 $ 1,525,128 $ 1,688,222 $ 1,662,724
Non‐MWL Tier III Total $ 4,429,000 $ 4,750,506 $ 4,750,506 26% 12% 11%
Date: 06/30/2019
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
BCI Electrical
Siemens Industry Inc BMS
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Turtle & HughesManna SupplyJM Electric
NON:Ricotta Electrical
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseSiemens Industry Inc Jerome L. Greene Science CenterBMS8 Fernwood Road, Florham Park, NJ 07392 973-575-63006/30/2019 In Progress
COMPANY (Tier II)
44
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 4,550,000 $ 5,418,876 $ 5,418,876
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Plywood/Core Material Supplier Yes $ ‐ $ 153,553 $ 153,553 W‐ESD No Doors, Frames & Finish Hardware Yes $ ‐ $ 46,795 $ 46,795 L No Decorative Surfacing, Doors, and Millwork Yes $ ‐ $ 102,121 $ 102,121
NON No Distributor of Laminate, Woodworking Products & Hardwood Supplies
Yes $ ‐ $ 229,628 $ 229,628
$ ‐ $ 532,097 $ 532,097 $ ‐ $ 302,469 $ 302,469
Non‐MWL Tier III Total $ ‐ $ 229,628 $ 229,628 0% 6% 6%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
Bauerschmidt & Sons Inc
JC Ryan EBCO/H&G LLCRugby Architectural Building
NON:Manhattan Laminates
Architectural Woodworking
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Park Avenue Building & Roofing Supplies LLC
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseBauerschmidt & Sons Inc Jerome L. Greene Science CenterArchitectural Woodworking11920 Merrick Blvd, Jamaica, NY 11434 718-528-35006/30/2019 In Progress
COMPANY (Tier II)
45
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 2,230,000 $ 2,269,407 $ 2,269,407
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Plywood/Core Material Supplier Yes $ 8,798 $ 8,351 $ 8,351 MW‐ESD No Supplier Yes $ ‐ $ 57,630 $ 57,630
$ 8,798 $ 65,981 $ 65,981 $ 8,798 $ 65,981 $ 65,981
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 0% 3% 3%
Date: 06/30/2019
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseJantile Inc Jerome L. Greene Science CenterCeramic Tile3960 Merritt Avenue, Bronx, NY 10466 718-655-54506/30/2019 In Progress
COMPANY (Tier II)
Jantile Inc Ceramic Tile
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Park Avenue Building & Roofing Supplies LLCJ and BB Tiles Corporation
Tier III Grand TotalMWL Tier III Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
MWL % of Tier II
46
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sL No $ 9,400,000 $ 10,641,866 $ 10,637,272
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Acoustic Plaster Yes $ ‐ $ 268,661 $ 268,661 NON No Salisbury Lockers ‐ Installation Yes $ ‐ $ 17,000 $ 17,000 NON No Black Iron Installation Yes $ 173,491 $ 210,108 $ 210,108
$ 173,491 $ 495,769 $ 495,769 $ ‐ $ ‐ $ ‐
Non‐MWL Tier III Total $ 173,491 $ 495,769 $ 495,769 0% 0% 0%
Date: 06/30/2019
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseElite Interiors Systems Inc Jerome L. Greene Science CenterCarpentry / Drywall79 Alexander Ave Bronx, NY 10454 718-401-37066/30/2019 In Progress
COMPANY (Tier II)
Elite Interiors Systems Inc
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Direct Service InstallersEvergreen Architectural Arts
Capital Construction Systems Inc
Carpentry / Drywall
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
47
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 3,550,000 $ 2,776,430 $ 2,745,454
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Supplier Yes $ 200,000 $ 124,616 $ 124,616
$ 200,000 $ 124,616 $ 124,616 $ 200,000 $ 124,616 $ 124,616
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 6% 4% 5%
Date: 06/30/2019
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseEagle One Roofing Contractors Inc Jerome L. Greene Science CenterRoofing18-60 45th Street Astoria, New York 11105 718-626-21086/30/2019 In Progress
COMPANY (Tier II)
Eagle One Roofing Contractors Inc Roofing
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Center Sheet Metal
Tier III Grand TotalMWL Tier III Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
MWL % of Tier II
48
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,200,000 $ 1,644,213 $ 1,644,213
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Supplier of SS Products Yes $ 1,685 $ 1,685 $ 1,685
$ 1,685 $ 1,685 $ 1,685 $ 1,685 $ 1,685 $ 1,685
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 0% 0% 0%
Date: 06/30/2019
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
Champion Metal & Glass Inc Ornamental Metal
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:The Steel Supply Co Inc
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseChampion Metal & Glass Inc Jerome L. Greene Science CenterOrnamental Metal130 Motor Parkway, Hauppauge, NY 11788 631-254-25606/30/2019 In Progress
COMPANY (Tier II)
49
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,275,000 $ 1,006,114 $ 1,006,114
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Steel Partitions & Doors Yes $ 54,800 $ 43,840 $ 43,840 M No Sandblast Glass Yes $ 1,648 $ 1,648 $ 1,648 M‐ESD No Supply Silglaze Yes $ 463 $ 463 $ 463
NON No Automatic Doors Yes $ 56,000 $ 58,000 $ 58,000 NON No Touch ups on Powder coated bollards Yes $ 1,600 $ 1,600 $ 1,400
$ 114,511 $ 105,551 $ 105,351 $ 56,911 $ 45,951 $ 45,951
Non‐MWL Tier III Total $ 57,600 $ 59,600 $ 59,400 4% 5% 5%
Date: 06/30/2019
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
F&O Finishing
Champion Metal & Glass Inc Glazing
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Superior Steel Door & Trim CoGMD IndustriesPark Avenue Building & Roofing Supplies LLC
NON:AES Architectural Entrance Systems
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseChampion Metal & Glass Inc Jerome L. Greene Science CenterGlazing130 Motor Parkway, Hauppauge, NY 11788 631-254-25606/30/2019 In Progress
COMPANY (Tier II)
50
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 5,167,874 $ 4,975,517 $ 4,975,517
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M No Delivery and Installation Yes $ 875,000 $ 1,357,069 $ 1,357,069
NON No Delivery and Installation Yes $ 138,260 $ 138,260 $ 138,260 NON No Delivery and Installation Yes $ 54,958 $ 38,192 $ 38,192
$ 1,068,218 $ 1,533,521 $ 1,533,521 $ 875,000 $ 1,357,069 $ 1,357,069
Non‐MWL Tier III Total $ 193,218 $ 176,452 $ 176,452 17% 27% 27%
Date: 06/30/2019
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseModulo 3 Corporation DBA Unifor Jerome L. Greene Science CenterGlass and Glazing149 Fifth Avenue, New York NY 10010 212-673-34346/30/2019 In Progress
COMPANY (Tier II)
Glass and Glazing
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:All State Office Furniture Technicians
Modulo 3 Corporation DBA Unifor
NON:Workplace Installation GroupTGI Installation
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
51
GC/CM: Lend Lease
Date Range: 8/1/2008 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 3,540 16% 808 4% 100 0% 48 0% 2,457 11% 0 0% 10 0% 6,962 32% 14,963 68% 21,925 32 53% 28 47% 60Construction Management
* Tier II Bauerschmidt & Sons 1,851 12% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 1,851 12% 13,802 88% 15,653 1 4% 25 96% 26Millwork
* B&G Electric 19,117 18% 1,942 2% 966 1% 1,946 2% 4,914 5% 0 0% 0 0% 28,884 27% 79,287 73% 108,171 45 33% 91 67% 136Electrical
* Cardoza Plumbing Corp 32,654 26% 0 0% 1,649 1% 5,264 4% 5,733 5% 1,225 1% 0 0% 46,525 37% 77,589 63% 124,113 31 37% 52 63% 83Plumbing
* Champion Metal and Glass 1,671 22% 0 0% 0 0% 0 0% 327 4% 0 0% 0 0% 1,998 26% 5,723 74% 7,721 17 36% 30 64% 47Ornamental Metal, Glass & Glazing
* Cives Corp 47,566 29% 56 0% 1,821 1% 0 0% 2,626 2% 0 0% 0 0% 52,068 32% 111,885 68% 163,953 99 33% 204 67% 303Superstructure Steel
* Creative Construction Services 9,838 48% 96 0% 0 0% 3,323 16% 499 2% 0 0% 767 4% 14,522 71% 5,997 29% 20,519 37 90% 4 10% 41Safety Equipment
* Eagle One Roofing Contractors Inc 8,674 36% 81 0% 0 0% 2,120 9% 3,244 13% 0 0% 0 0% 14,118 58% 10,173 42% 24,291 56 60% 38 40% 94Roofing
* Elite Interiors Inc 53 21% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 53 21% 199 79% 252 2 25% 6 75% 8Drywall, Resillient Flooring & Base
* Fine Painting & Decorating Company Inc 27,238 72% 0 0% 0 0% 8 0% 444 1% 0 0% 0 0% 27,690 73% 10,094 27% 37,784 48 77% 14 23% 62Painting & Instrumentation
* Five Star Electrical 12,305 8% 198 0% 152 0% 384 0% 3,453 2% 0 0% 1,684 1% 18,175 12% 136,379 88% 154,554 38 21% 145 79% 183Electrical
* Forest Electric 46,104 25% 0 0% 0 0% 312 0% 2,335 1% 0 0% 0 0% 48,750 26% 137,606 74% 186,356 49 34% 97 66% 146Electrical
* Fresh Meadow 1,352 46% 0 0% 0 0% 0 0% 136 5% 0 0% 0 0% 1,488 50% 1,460 50% 2,948 12 44% 15 56% 27HVAC Systems
* Hi Tech Data 297 10% 1,002 33% 0 0% 0 0% 25 1% 0 0% 0 0% 1,324 43% 1,726 57% 3,050 7 64% 4 36% 11Raised Access Flooring
* Island Acoustics 58,183 52% 8 0% 2,294 2% 1,732 2% 4,017 4% 0 0% 4,956 4% 71,189 64% 40,705 36% 111,894 74 54% 62 46% 136Acoustics
* Jantile Inc 8,147 59% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 8,147 59% 5,729 41% 13,876 11 52% 10 48% 21Ceramic Tile
* Metropolitan Enterprises 1,346 54% 0 0% 0 0% 0 0% 14 1% 0 0% 0 0% 1,360 55% 1,126 45% 2,485 33 69% 15 31% 48Scaffolding
* Morell Brown Corp 9,614 91% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 9,614 91% 1,008 9% 10,622 13 100% 0 0% 13Fireproofing
* Navillus Contracting 42,824 50% 0 0% 0 0% 797 1% 12,199 14% 0 0% 0 0% 55,820 65% 29,456 35% 85,275 170 55% 137 45% 307Masonry
* Nets That Work 1,252 52% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 1,252 52% 1,177 48% 2,429 4 33% 8 67% 12Safety Equipment
* Otis Elevators 6,203 30% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 6,203 30% 14,734 70% 20,937 15 25% 46 75% 61Elevators
* Platinum Terrazzo Inc 10,781 55% 0 0% 0 0% 0 0% 79 0% 0 0% 0 0% 10,860 56% 8,666 44% 19,526 17 59% 12 41% 29Ceramic Tile
* Rael Automatic Sprinkler 1,148 3% 0 0% 0 0% 0 0% 49 0% 0 0% 0 0% 1,197 3% 43,466 97% 44,663 8 12% 60 88% 68Dewatering
* RCC Concrete Corp 22,640 46% 107 0% 73 0% 243 0% 542 1% 0 0% 0 0% 23,604 48% 25,591 52% 49,194 83 34% 163 66% 246Above Grade Concrete
* Siemens 8,770 18% 701 1% 0 0% 208 0% 0 0% 0 0% 0 0% 9,678 20% 39,699 80% 49,376 14 24% 45 76% 59HVAC Systems
* Unifor 16,168 98% 0 0% 208 1% 0 0% 0 0% 0 0% 0 0% 16,376 99% 139 1% 16,515 28 97% 1 3% 29Glass and Glazing
* Universal Builders Supply 4,569 52% 16 0% 0 0% 0 0% 0 0% 0 0% 0 0% 4,585 52% 4,162 48% 8,747 55 59% 39 41% 94Hoist
* Walters LLC 27,344 60% 0 0% 0 0% 0 0% 270 1% 0 0% 0 0% 27,614 60% 18,246 40% 45,860 30 65% 16 35% 46Metal Stairs
* WDF 71,259 33% 1,533 1% 3,127 1% 301 0% 4,022 2% 0 0% 864 0% 81,106 38% 132,448 62% 213,553 139 38% 226 62% 365Piping/Sheetmetal
502,503 6,546 10,389 16,684 47,382 1,225 8,280 593,008 973,230 1,566,237 1,168 1,593 2,76132% 0% 1% 1% 3% 0% 1% 38% 62% 100% 42% 58% 100%
Contractor StartBauerschmidt & Sons 10/17/2015B&G Electric 3/27/2014Cardoza Plumbing Corp 2/27/2013Champion Metal and Glass 11/11/2015Cives Corp 6/30/2012Creative Construction Services 4/21/2013Eagle One Roofing Contractors Inc 4/30/2013Elite Interiors Inc 6/9/2017Fine Painting & Decorating Company Inc 8/12/2013Five Star Electrical 3/7/2013Forest Electric 7/18/2013Fresh Meadow 5/2/2017Hi Tech Data 7/12/2015Island Acoustics 9/11/2013Jantile Inc 2/8/2015Metropolitan Enterprises 3/11/2013Morell Brown Corp 8/3/2013Navillus Contracting 9/25/2013Nets That Work 9/3/2013Otis Elevators 9/6/2013Platinum Terrazzo Inc 2/28/2015Rael Automatic Sprinkler 5/1/2013RCC Concrete Corp 1/30/2013Siemens 4/3/2014Unifor 9/30/2015Universal Builders Supply 4/29/2013Walters LLC 5/12/2013WDF 7/24/2013
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In ProgressIn ProgressIn Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In ProgressIn Progress
In Progress
In Progress
In Progress
In Progress
In Progress
Jerome L. Greene Science CenterSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
In Progress
Total MWL Non-MWL Total MWL Non-MWL
Total HoursOverall % of Total
In Progress
In Progress
In Progress
* Denotes active contractors 1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In Progress
In Progress
In Progress
52
GC/CM: Lend Lease
Date Range: 4/1/2019 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Construction Management
* Tier II Bauerschmidt & Sons 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Millwork
* B&G Electric 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Electrical
* Cardoza Plumbing Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Plumbing
* Champion Metal and Glass 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Ornamental Metal, Glass & Glazing
* Cives Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Superstructure Steel
* Creative Construction Services 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Safety Equipment
* Eagle One Roofing Contractors Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Roofing
* Elite Interiors Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Drywall, Resillient Flooring & Base
* Fine Painting & Decorating Company Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Painting & Instrumentation
* Five Star Electrical 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Electrical
* Forest Electric 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Electrical
* Fresh Meadow 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0HVAC Systems
* Hi Tech Data 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Raised Access Flooring
* Island Acoustics 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Acoustics
* Jantile Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Ceramic Tile
* Metropolitan Enterprises 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Scaffolding
* Morell Brown Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Fireproofing
* Navillus Contracting 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Masonry
* Nets That Work 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Safety Equipment
* Otis Elevators 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Elevators
* Platinum Terrazzo Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Ceramic Tile
* Rael Automatic Sprinkler 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Dewatering
* RCC Concrete Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Above Grade Concrete
* Siemens 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0HVAC Systems
* Unifor 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Hoist
* Universal Builders Supply 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Hoist
* Walters LLC 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Metal Stairs
* WDF 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Piping/Sheetmetal
0 0 0 0 0 0 0 0 0 0 0 0 00% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Jerome L. Greene Science CenterSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
* Denotes active contractors1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total HoursOverall % of Total
53
EPA Clean Diesel
54
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 5/1/2009 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 613,907
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON:
NON No Equipment Supplier Yes $ 35,355 $ 35,355 $ 35,355 NON No Equipment Supplier Yes $ ‐ $ 71,294 $ 71,294 NON No Equipment Supplier Yes $ 73,733 $ 93,733 $ 93,733 NON No Equipment Supplier Yes $ 75,160 $ 105,202 $ 105,202 NON No Equipment Supplier Yes $ 478,462 $ 308,323 $ 308,323
$ 662,710 $ 613,907 $ 613,907 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ 662,710 $ 613,907 $ 613,907 0% 0% 0%
Date: 06/30/2019
Kalbro
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
OWNER
DIRECT SPEND VENDORS (Tier I)
EPA Clean Diesel
Trade Name
Columbia University
Work Completed 11/2011410 West 118th Street, NY, NY 10027
Columbia University Owner
Edward Ehrbar
6/30/2019
Name/Address/Phone # (if available) otherwise enter Trade
Arpielle Equipment
FoleyH O Penn Machinery
55
Open Space
56
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 7/10/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 52,276
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Ornamental Metals Yes $ ‐ $ 22,900 $ 22,900 Crown Sign Systems Inc W‐ESD No Signage Yes $ ‐ $ 11,675 $ 11,675
L No Electrical Yes $ ‐ $ 34 $ 34 W No Printing Service Yes $ ‐ $ 14,838 $ 14,838 L No Telecommunications Conduit Installation Yes $ ‐ $ 1,365 $ 1,365 MWL‐ESD No Cleaning Yes $ ‐ $ 621 $ 621 W No Signage Yes $ ‐ $ 16 $ 16 L No Plumbing Yes $ ‐ $ 63 $ 63
NON No Doors & Windows Yes $ ‐ $ 13 $ 13 NON No Telecommunication Yes $ ‐ $ 751 $ 751
$ ‐ $ 52,276 $ 52,276 $ ‐ $ 51,512 $ 51,512
Non‐MWL Direct Spend Total $ ‐ $ 764 $ 764 0% 99% 99%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
Name Trade
SOS Locksmith CorpNON:
StarCom Communications Service
The Sign Works Inc
Doumas Electric IncGreen Girl Printing and Messenger IncMFM Contracting CorpScrub Clean Maintenance Corp
Watsons Plumbing and Heating
Clark & Wilkins Industries Inc
410 West 118th Street, NY, NY 10027
Columbia University
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Open Space
Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
6/30/2019 In Progress
OWNER
57
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 7/10/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 16,443,800
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Construction Management Yes $ 1,047,159 $ 16,443,800 $ 16,443,800
$ 1,047,159 $ 16,443,800 $ 16,443,800 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ 1,047,159 $ 16,443,800 $ 16,443,800 0% 0% 0%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Lend Lease US Construction LMB
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Open Space
58
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 7/10/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,047,159 $ 16,443,800 $ 16,443,800
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Security Yes $ ‐ $ 15 $ 15 M‐ESD No Drywall Yes $ ‐ $ 2,412 $ 2,412 MW‐ESD No Security Yes $ ‐ $ 54,195 $ 54,195 W‐ESD Yes Electrical Yes $ ‐ $ 1,821 $ 1,821 W‐ESD Yes Street Structures Yes $ ‐ $ 342 $ 342 L No Resilient Flooring & Base Yes $ ‐ $ 161 $ 161 L No Drywall Yes $ ‐ $ 63 $ 63 M‐ESD No Paint & Coatings Yes $ ‐ $ 166 $ 166 MWL‐ESD No Security Yes $ ‐ $ 60,531 $ 60,531 L No Sitework Yes $ ‐ $ 17,664 $ 17,664 L No Foundation Concrete Yes $ ‐ $ 11,016 $ 11,016 MWL‐ESD No Construction Management Yes $ ‐ $ 60,799 $ 60,799
NON No Electrical Yes $ ‐ $ 1,116,585 $ 1,116,585 NON No Roofing Yes $ 1,007,250 $ 1,169,639 $ 1,169,639 NON Yes Electrical Yes $ ‐ $ 2,731 $ 2,731 NON Yes Street Structures Yes $ ‐ $ 513 $ 513 NON No Resilient Flooring & Base Yes $ ‐ $ 695 $ 695 NON No Sitework Yes $ ‐ $ 8,923,762 $ 8,836,568 NON No Drywall Yes $ ‐ $ 2,195 $ 2,195 NON No Above Grade Concrete Yes $ ‐ $ 992,502 $ 992,502 NON No HVAC Systems Yes $ ‐ $ 939 $ 939 NON No Sitework Yes $ ‐ $ 91,219 $ 91,219 NON No Street Structures Yes $ ‐ $ 57,137 $ 57,137 NON No Lawns & Planting Yes $ ‐ $ 1,448,920 $ 1,448,920 NON No HVAC Systems Yes $ ‐ $ 6,727 $ 6,727
$ 1,007,250 $ 14,022,749 $ 13,935,555 $ ‐ $ 209,185 $ 209,185
Non‐MWL Tier II Total $ 1,007,250 $ 13,813,564 $ 13,726,370 0% 1% 1%
Date: 06/30/2019
Johnson Security Bureau Inc
EJ/Egg Electric JV ‐ (Egg Electric Inc)Elite Interiors Systems Inc
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease Open SpaceConstruction Management
COMPANY (Tier I)
Name Trade
622 West 132nd, 2nd fl, New York, NY 10027 212-939-95806/30/2019 In Progress
Lend Lease US Construction LMB Construction Management
Fine Painting & Decorating Company IncElite Interiors Systems Inc
Elite Floors Inc
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Cassone Leasing IncCreative ConstructionEddington Security IncEJ/Egg Electric JV ‐ (Egg Electric Inc)
NON:ASR Electrical Contracting IncEagle One Roofing Contractors Inc
EJ/Egg Electric JV ‐ (EJ Electric)
The McKissack Group IncMFM Contracting Corp
EJ/Egg Electric JV ‐ (EJ Electric)
MFM Contracting Corp
Intricate ConstructionIsland AcousticsRCC Concrete Corp
SkanskaSkanskaSteven Dubner Landscaping IncWDF Inc
Siemens Industry Inc
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier II Grand TotalMWL Tier II Total
MWL % of Tier I
59
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 7/10/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 7,650,000 $ 8,923,762 $ 8,836,568
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Demolition Yes $ 100,000 $ 159,797 $ 159,797 W‐ESD No Containers Yes $ 50,000 $ 19,125 $ 19,125 M‐ESD No Trucking Yes $ 50,000 $ 40,398 $ 40,398 M‐ESD No Plumbing Yes $ 680,000 $ 713,952 $ 713,952 W‐ESD No F&I Natural Stone Yes $ 225,000 $ 219,601 $ 219,601 L No Concrete Yes $ 200,000 $ 287,200 $ 287,200 W No F&I Metal Deck Fence Yes $ 220,000 $ 309,365 $ 309,365
$ 1,525,000 $ 1,749,438 $ 1,749,438 $ 1,525,000 $ 1,749,438 $ 1,749,438
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 20% 20% 20%
Date: 06/30/2019
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
Westchester Metal Works Inc
Intricate Construction Site Work
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Gateway Demo/Civil CorpRizzo Environmental Services CorpBlackridge Construction LLCCardoza PlumbingMiller Druck Specialty ContractingCasa Redimix
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseIntricate Construction Open SpaceSite Work450 Commerce St, Hawthorne, NY 10532 914-769-12006/30/2019 In Progress
COMPANY (Tier II)
60
GC/CM: Lend Lease
Date Range: 8/1/2008 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier II Intricate Construction 15,339 47% 0 0% 0 0% 0 0% 280 1% 0 0% 0 0% 15,619 48% 16,939 52% 32,557 67 47% 77 53% 144Sitework
* MFM Contracting Corp 2,195 59% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 2,195 59% 1,500 41% 3,695 10 43% 13 57% 23Utilities
* Steven Dubner 1,587 100% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 1,587 100% 0 0% 1,587 22 100% 0 0% 22Lawns & Planting
19,121 0 0 0 280 0 0 19,401 18,438 37,839 99 90 18951% 0% 0% 0% 1% 0% 0% 51% 49% 100% 52% 48% 100%
Contractor Start Intricate Construction 7/11/2010MFM Contraction Corp 2/4/2010Steven Dubner 8/2/2016
Open SpaceSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
* Denotes active contractors1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
EndIn ProgressIn Progress
Total HoursOverall % of Total
In Progress
61
GC/CM: Lend Lease
Date Range: 4/1/2019 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier II Intricate Construction 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Sitework
* MFM Contracting Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Utilities
* Steven Dubner 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Lawns & Planting
0 0 0 0 0 0 0 0 0 0 0 0 00% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Open SpaceSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total HoursOverall % of Total
* Denotes active contractors
62
Lenfest
63
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 870,948
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No General Contractor Yes $ ‐ $ 60,085 $ 60,085 L No Electrical Yes $ ‐ $ 123 $ 123 W No Printing Service Yes $ ‐ $ 59,865 $ 59,865
Izzo Construction Corp WL‐ESD No General Contractor Yes $ ‐ $ 38,995 $ 38,995 L No Telecommunications Conduit Installation Yes $ ‐ $ 7,971 $ 7,971 MWL‐ESD No Cleaning Yes $ ‐ $ 2,221 $ 2,221 W No Signage Yes $ ‐ $ 57 $ 57 L No Plumbing Yes $ ‐ $ 226 $ 226
NON No General Contractor Yes $ ‐ $ 8,858 $ 8,858
NON No Safeway Fire ‐ Monitoring Yes $ ‐ $ 2,526 $ 2,526
NON No Materials & Equipment Yes $ ‐ $ 278,680 $ 278,680 Bear Communications Inc NON No AV/Cable/Telecom Yes $ ‐ $ 25,188 $ 25,188 From the Source NON No Furniture Yes $ ‐ $ 8,410 $ 8,410
NON No HVAC Yes $ ‐ $ 1,233 $ 1,233 NON No Doors & Windows Yes $ ‐ $ 46 $ 46 NON No Materials & Equipment Yes $ ‐ $ 138,907 $ 138,907 NON No Telecommunication Yes $ ‐ $ 2,682 $ 2,682 NON No Materials & Equipment Yes $ ‐ $ 199,756 $ 199,756 NON No Materials & Equipment Yes $ ‐ $ 35,119 $ 35,119
$ ‐ $ 870,948 $ 870,948 $ ‐ $ 169,543 $ 169,543
Non‐MWL Direct Spend Total $ ‐ $ 701,405 $ 701,405 0% 19% 19%
Date: 06/30/2019
MFM Contracting Corp
410 West 118th Street, NY, NY 10027
Green Girl Printing and Messenger Inc
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:CitiStructureDoumas Electric Inc
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Lenfest
Scrub Clean Maintenance Corp
SOS Locksmith Corp
275 Technology Solutions dba Safeway Fire & Protection CompanyBarbizon Elec Co Inc
StarCom Communications ServiceTemporary Walls IncorporatedUnited Rentals North America Inc
NON:Advance Relocation & Storage
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
The Sign Works Inc
Staging Concepts Acquisition
Watsons Plumbing and Heating
Siemens Industry Inc
64
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 71,142,750
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Construction Management Yes $ ‐ $ 81,965,260 $ 71,142,750
$ ‐ $ 81,965,260 $ 71,142,750 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ ‐ $ 81,965,260 $ 71,142,750 0% 0% 0%
Date: 06/30/2019
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Lenfest
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Lend Lease US Construction LMB
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
65
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ ‐ $ 81,965,260 $ 71,142,750
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Ceramic Tile Yes $ ‐ $ 183,880 $ 183,880 W‐ESD No Masonry Yes $ ‐ $ 162,261 $ 162,261 M‐ESD No Safety Equipment Yes $ ‐ $ 349,861 $ 349,861 M‐ESD No Drywall Yes $ ‐ $ 14,074 $ 14,074 M‐ESD No Drywall Yes $ ‐ $ 50,000 $ 50,000 W‐ESD No Identifying Devices Yes $ ‐ $ 105,688 $ 105,688 MW‐ESD No Security Yes $ ‐ $ 226,668 $ 226,668 W‐ESD Yes Electrical Yes $ ‐ $ 241,806 $ 238,098 W‐ESD Yes Electrical Yes $ ‐ $ 2,737 $ 2,737 W‐ESD Yes Street Structures Yes $ ‐ $ 1,223 $ 1,223 L No Resilient Flooring & Base Yes $ ‐ $ 941 $ 941 L No Drywall Yes $ ‐ $ 369 $ 369 M‐ESD No Painting & Instrumentation Yes $ ‐ $ 701,939 $ 701,939 M‐ESD No Paint & Coatings Yes $ ‐ $ 402,380 $ 402,380 L No Plumbing Yes $ ‐ $ 1,161,884 $ 1,161,884 MWL‐ESD No Security Yes $ ‐ $ 279,886 $ 279,886 M No Scaffolding Yes $ ‐ $ 229,918 $ 229,918 L No Utilities Yes $ ‐ $ 322,007 $ 322,007 L No Electrical Yes $ ‐ $ 8,820 $ 5,650 M‐ESD No Fire Protection Systems Yes $ ‐ $ 787,911 $ 787,911 MWL‐ESD No Construction Management Yes $ ‐ $ 1,231,117 $ 1,231,117 W No Metal Stairs Yes $ ‐ $ 703,000 $ 703,000 W No Miscellaneous Metal Yes $ ‐ $ 1,848,673 $ 1,848,673
NON No Toilet Partitions & Screens Yes $ ‐ $ 38,780 $ 38,780 NON No Electrical Yes $ ‐ $ 11,338,958 $ 11,338,958 NON No Glass & Glazing Yes $ ‐ $ 459,760 $ 459,760 NON No Snorkel Yes $ ‐ $ 90,000 $ 90,000 NON No Millwork Yes $ ‐ $ 45,924 $ 45,924 NON No Superstructure Steel Yes $ ‐ $ 11,334,322 $ 11,334,322 NON No Masonry Yes $ ‐ $ 1,639 $ 1,639 NON No Waterproofing & Roofing Yes $ ‐ $ 452,211 $ 452,211 NON No Scaffolding Yes $ ‐ $ 254,924 $ 254,924 NON Yes Electrical Yes $ ‐ $ 362,708 $ 357,148 NON Yes Electrical Yes $ ‐ $ 4,106 $ 4,106
3L & Company IncCommodore Construction CorporationCreative ConstructionCreative ConstructionCreative ConstructionCrown Sign Systems Inc
Johnson Security Bureau Inc
Champion Metal & Glass Inc
Eddington Security Inc
Fine Painting & Decorating Company Inc
A Liss & Company IncNON:
The McKissack Group Inc
Elite Interiors Systems Inc
Metropolitan Enterprises Inc
EJ/Egg Electric JV ‐ (Egg Electric Inc)
Elite Interiors Systems Inc
MFM Contracting Corp
EJ/Egg Electric JV ‐ (Egg Electric Inc)
Giachetti Plumbing
EJ/Egg Electric JV ‐ (Egg Electric Inc)
Fine Painting & Decorating Company Inc
Trade
Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Lend Lease US Construction LMB
Name
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease Lenfest
COMPANY (Tier I)
Construction Management622 West 132nd, 2nd fl, New York, NY 10027 212-939-95806/30/2019 In Progress
MFM Contracting Corp
Westchester Metal Works Inc
Commodore Construction Corporation
Sirina Fire Protection Corp
Westchester Metal Works Inc
Champion Metal & Glass Inc
ASR Electrical Contracting Inc
Eagle One Roofing Contractors IncEagle Scaffolding Services Inc
Champion Metal & Glass Inc Cives Corp
EJ/Egg Electric JV ‐ (Egg Electric Inc)EJ/Egg Electric JV ‐ (Egg Electric Inc)
66
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ ‐ $ 81,965,260 $ 71,142,750
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
Trade
Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
Lend Lease US Construction LMB
Name
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease Lenfest
COMPANY (Tier I)
Construction Management622 West 132nd, 2nd fl, New York, NY 10027 212-939-95806/30/2019 In Progress
NON Yes Street Structures Yes $ ‐ $ 1,834 $ 1,834 NON No Resilient Flooring & Base Yes $ ‐ $ 4,059 $ 4,059 NON No Electrical Yes $ ‐ $ 289,895 $ 275,400 NON No Electrical Yes $ ‐ $ 5,304 $ 5,250 NON No HVAC Systems Yes $ ‐ $ 1,565,586 $ 1,451,251 NON No Hoist / Bridges / Scaffold Yes $ ‐ $ 134,000 $ 134,000 NON No Raised Access Flooring Yes $ ‐ $ 177,727 $ 177,727 NON No Street Structures Yes $ ‐ $ 26,374 $ 26,374 NON No Drywall Yes $ ‐ $ 84,064 $ 84,064 NON No Window Treatment / Blinds Yes $ ‐ $ 249,760 $ 249,760 NON No Safety Equipment Yes $ ‐ $ 188,000 $ 188,000 NON No Elevators Yes $ ‐ $ 1,281,830 $ 1,281,830 NON No Spray Fireproofing Yes $ ‐ $ 666,750 $ 666,750 NON No Millwork Yes $ ‐ $ 1,220,222 $ 1,220,222 NON No Fluid‐Applied Flooring Yes $ ‐ $ 183,945 $ 183,945 NON No Above Grade Concrete Yes $ ‐ $ 2,030,298 $ 2,030,298 NON No Resilient Flooring & Base Yes $ ‐ $ 755,165 $ 755,165 NON No Rough Carpentry Yes $ ‐ $ 4,176 $ 4,176 NON No HVAC Systems Yes $ ‐ $ 5,485 $ 5,485 NON No Street Structures Yes $ ‐ $ 841,207 $ 841,207 NON No HVAC Systems Yes $ ‐ $ 11,267,648 $ 11,267,648 NON No Structural Modifications Yes $ ‐ $ 111,573 $ 111,573 NON No Demolition Yes $ ‐ $ 18,487 $ 18,487 NON No Hoist Yes $ ‐ $ 203,592 $ 203,592 NON No HVAC Systems Yes $ ‐ $ 39,245 $ 39,245 NON No Theater & Stage Equipment Yes $ ‐ $ 167,678 $ 167,678 NON No Drywall Yes $ ‐ $ 5,708,942 $ 5,708,942
$ ‐ $ 60,633,221 $ 60,491,899 $ ‐ $ 9,017,043 $ 9,010,165
Non‐MWL Tier II Total $ ‐ $ 51,616,178 $ 51,481,734 0% 11% 13%
Date: 06/30/2019
WDF Inc
LVC Interiors Inc
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
MWL % of Tier I
Tier II Grand TotalMWL Tier II Total
Whalen Berez GroupWoodworks Construction Co Inc
Trystate Mechanical IncUnited Drilling & Cutting CorpUnited Drilling & Cutting CorpUniversal Builders Supply
Re:Source New Jersey
Skanska
RCC Concrete Corp
Siemens Industry Inc
PGS Millwork IncPlatinum Terrazzo
Re:Source New Jersey
PAL Environmental Safety Corp
Elite Floors IncFive Star Electric Corp
H.S.E. System Inc
Forest Electric
Hi Tech Data Floors Inc
Nets That WorkOtis Elevator Company
Fresh Meadow Mechanical Corp
Intricate ConstructionIsland Acoustics
EJ/Egg Electric JV ‐ (Egg Electric Inc)NON:
67
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 11,150,000 $ 11,334,322 $ 11,334,322
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Field Bolts Yes $ 387,460 $ 140,709 $ 140,709
$ 387,460 $ 140,709 $ 140,709 $ 387,460 $ 140,709 $ 140,709
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 3% 1% 1%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
8 Church Street, Gouverneur, NY 13642 315-287-22006/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Cives Corp Structural Steel
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Baco Enterprises Inc
Structural Steel
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseCives Corp Lenfest
68
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,837,000 $ 2,030,298 $ 2,030,298
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Concrete Ready Mix Supplier Yes $ 153,600 $ 136,969 $ 136,969 L No Rebar & Wire Mesh Supplier Yes $ 40,000 $ 28,200 $ 28,200 W No Lumper (Metal Lathing) Yes $ ‐ $ 68,490 $ 68,490
NON No Rebar & Wire Mesh Supplier Yes $ 30,000 $ 34,116 $ 34,116
$ 223,600 $ 267,775 $ 267,775 $ 193,600 $ 233,659 $ 233,659
Non‐MWL Tier III Total $ 30,000 $ 34,116 $ 34,116 11% 12% 12%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
CFS Steel CoB.P. Precise Construction Corp
NON:Reinforcing Supply
NYCON Readimix
74 State Street - 2nd Floor Westbury, NY 11590 516-279-67876/30/2019 In Progress
COMPANY (Tier II)
Name Trade
RCC Concrete Corp Concrete Construction
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Concrete Construction
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseRCC Concrete Corp Lenfest
69
Schedule M3
CM Name:Company Name: Giachetti Plumbing Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sL No $ 1,090,000 $ 1,161,884 $ 1,161,884
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Insulation Yes $ 43,400 $ 43,400 $ 43,400
$ 43,400 $ 43,400 $ 43,400 $ 43,400 $ 43,400 $ 43,400
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 4% 4% 4%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseLenfest
Plumbing
County Insulation
58 Tiemann Place New York, NY 10027 646-532-36966/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Giachetti Plumbing Plumbing
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
70
Schedule M3
CM Name:Company Name: PGS Millwork Inc Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,155,797 $ 1,220,222 $ 1,220,222
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Fabric Wrapped Acoustical Panels Yes $ 20,000 $ 11,215 $ 11,215 NON No Veneered Acoustical Planks Yes $ 90,000 $ 72,980 $ 72,980 NON No Installation Yes $ 155,000 $ 146,250 $ 146,250 NON No Door Yes $ 350 $ 689 $ 689 NON No Metalwork Yes $ 6,000 $ 6,810 $ 6,810 NON No Corian Countertops Yes $ 13,000 $ 34,700 $ 34,700 NON No Steel in Wall Supports Yes $ 6,000 $ 6,605 $ 6,605 NON No Plastic Laminate Millwork Yes $ 63,000 $ 73,392 $ 73,392 NON No Prime Base and Solid Oak Base Yes $ 4,000 $ 4,302 $ 4,302 NON No Bamboo Millwork Yes $ 15,000 $ 13,647 $ 13,647
$ 372,350 $ 370,590 $ 370,590 $ ‐ $ ‐ $ ‐
Non‐MWL Tier III Total $ 372,350 $ 370,590 $ 370,590 0% 0% 0%
Date: 06/30/2019
VM Choppy
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
Lewis LumberWright Architectural Millwork
Phoenix Cabinetry
PGS Millwork Inc Architectural Millwork
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Conwed/Wall TechonologyDecousticsSupreme Woodwork InstallationVT IndustriesUniversal MetalcraftsmanSolid Surface Craftsman
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseLenfest
Architectural Millwork32 Hickory Lane, Hudson, NY 12534 518-828-26086/30/2019 In Progress
COMPANY (Tier II)
71
Schedule M3
CM Name:Company Name: Champion Metal & Glass Inc Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 501,410 $ 595,684 $ 595,684
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Supply Silicone Yes $ 153 $ 153 $ 153
$ 153 $ 153 $ 153 $ 153 $ 153 $ 153
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 0% 0% 0%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
Champion Metal & Glass Inc Architectual Ornamental Metal & Glass
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Park Avenue Building & Roofing Supplies LLC
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseLenfest
Architectual Ornamental Metal & Glass130 Motor Parkway, Hauppauge, NY 11788 631-254-25606/30/2019 In Progress
COMPANY (Tier II)
72
Schedule M3
CM Name:Company Name: Woodworks Construction Co Inc Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 5,708,942 $ 5,708,942 $ 5,708,942
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Doors, Frames & Hardware Supplier Yes $ 274,000 $ 293,375 $ 293,375 M‐ESD No Material Supplier of Drywall, Insulation, &
Metal StudsYes $ 1,000,000 $ 484,622 $ 484,622
$ 1,274,000 $ 777,997 $ 777,997 $ 1,274,000 $ 777,997 $ 777,997
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 22% 14% 14%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseLenfest
Carpentry / Drywall
JC Ryan EBCO/H&G LLC
322 8th Ave, Suite 701 New York, NY 10001 212-888-73116/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Woodworks Construction Co Inc Carpentry / Drywall
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Park Avenue Building & Roofing Supplies LLC
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
73
Schedule M3
CM Name:Company Name: LVC Interiors Inc Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 249,760 $ 249,760 $ 249,760
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Shade Manufacturer Yes $ 178,927 $ 178,927 $ 178,927 NON No Shade Manufacturer Yes $ 2,881 $ 2,881 $ 2,881
$ 181,808 $ 181,808 $ 181,808 $ ‐ $ ‐ $ ‐
Non‐MWL Tier III Total $ 181,808 $ 181,808 $ 181,808 0% 0% 0%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseLenfest
Window Treatment / Blinds
Mecho Shade Systems
345 Harrison Avenue, Garfield NJ 07026 201-525-02226/30/2019 In Progress
COMPANY (Tier II)
Name Trade
LVC Interiors Inc Window Treatment / Blinds
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
WT Shades
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
74
Schedule M3
CM Name:Company Name: Trystate Mechanical Inc Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 10,226,340 $ 11,267,648 $ 11,267,648
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Sheetmetal Yes $ 2,420,000 $ 2,462,871 $ 2,462,871 W No Rigging Yes $ 93,500 $ 93,500 $ 93,500
NON No Insulation Yes $ 240,000 $ 369,054 $ 369,054 NON No Testing Balancing Yes $ 56,000 $ 85,000 $ 85,000 NON No Testing Balancing Yes $ 39,550 $ 37,595 $ 37,595 NON No ATC Yes $ 1,800,000 $ 1,736,543 $ 1,736,543 NON No Ductcleaning Yes $ 15,000 $ 2,156 $ 2,156
$ 4,664,050 $ 4,786,719 $ 4,786,719 $ 2,513,500 $ 2,556,371 $ 2,556,371
Non‐MWL Tier III Total $ 2,150,550 $ 2,230,348 $ 2,230,348 25% 23% 23%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseLenfest
HVAC Systems
Celtic Sheetmetal Inc
241-02 Northern Blvd, 2nd Floor, Douglaston, NY 11362 718-819-88446/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Trystate Mechanical Inc HVAC Systems
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Shadow Transport
NON:Atlantic ContractingHt Lyons ContractorsIndependent Testing BalancingSiemens Industry IncTechclean
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
75
Schedule M3
CM Name:Company Name: 3L & Company Inc Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sW No $ 183,880 $ 183,880 $ 183,880
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Ceramic Installation Yes $ 75,000 $ 75,000 $ 75,000
$ 75,000 $ 75,000 $ 75,000 $ ‐ $ ‐ $ ‐
Non‐MWL Tier III Total $ 75,000 $ 75,000 $ 75,000 0% 0% 0%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
VAL Floors
241-02 Northern Blvd, 2nd Floor, Douglaston, NY 11362 718-819-88446/30/2019 In Progress
COMPANY (Tier II)
Name Trade
3L & Company Inc Ceramic Tile
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseLenfest
Ceramic Tile
76
Schedule M3
CM Name:Company Name: ASR Electrical Contracting Inc Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 11,338,958 $ 11,338,958 $ 11,338,958
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Electrical Material Yes $ 30,000 $ 29,182 $ 29,182
$ 30,000 $ 29,182 $ 29,182 $ 30,000 $ 29,182 $ 29,182
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 0% 0% 0%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeaseLenfest
Electrical
Turtle & Hughes
207 Newton Rd, Plainview, NY 11803 516-420-01016/30/2019 In Progress
COMPANY (Tier II)
Name Trade
ASR Electrical Contracting Inc Electrical
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
77
GC/CM: Lend Lease
Date Range: 8/1/2008 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier II 3L & Company Inc 85 8% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 85 8% 997 92% 1,082 1 17% 5 83% 6Ceramic Tile
* ASR Electric 20,476 30% 0 0% 0 0% 1,157 2% 0 0% 0 0% 0 0% 21,633 31% 47,738 69% 69,371 26 33% 54 68% 80Electrical
* Champion Metal 232 14% 0 0% 0 0% 0 0% 8 0% 0 0% 0 0% 240 15% 1,415 85% 1,655 3 20% 12 80% 15Glass & Glazing, Snorkel, Millwork
* Cives 9,239 25% 1,034 3% 0 0% 0 0% 0 0% 0 0% 0 0% 10,273 27% 27,165 73% 37,437 23 26% 66 74% 89Structural Metals
* Commodore 608 46% 0 0% 0 0% 0 0% 80 6% 0 0% 0 0% 688 52% 635 48% 1,323 5 56% 4 44% 9Masonry
* Creative Construction Services 606 21% 0 0% 0 0% 682 24% 282 10% 0 0% 126 4% 1,695 60% 1,123 40% 2,818 16 89% 2 11% 18Safety Equipment
* Eagle Scaffolding 752 57% 0 0% 0 0% 0 0% 3 0% 0 0% 0 0% 755 57% 569 43% 1,324 15 65% 8 35% 23Scaffolding, Waterproofing & Roofing
* Fine Painting & Decorating Company Inc 4,225 72% 0 0% 0 0% 0 0% 214 4% 0 0% 0 0% 4,439 75% 1,453 25% 5,892 23 79% 6 21% 29Painting & Instrumentation
* Giachetti Plumbing & Heating Corp. 1,807 21% 88 1% 0 0% 0 0% 0 0% 0 0% 0 0% 1,895 22% 6,822 78% 8,717 5 16% 27 84% 32Plumbing
* LVC Interiors Inc 14 100% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 14 100% 0 0% 14 1 100% 0 0% 1Window Treatment / Blinds
* Metropolitan Enterprises 1,193 51% 0 0% 0 0% 0 0% 135 6% 0 0% 0 0% 1,328 57% 1,017 43% 2,345 37 76% 12 24% 49Hoist/Bridges/Scaffold
* Nets That Work 183 46% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 183 46% 211 54% 394 3 30% 7 70% 10Safety Equipment
* Otis Elevators 2,323 27% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 2,323 27% 6,153 73% 8,476 4 15% 23 85% 27Elevators
* PAL Environmental 780 39% 0 0% 0 0% 0 0% 24 1% 0 0% 0 0% 804 40% 1,208 60% 2,012 11 42% 15 58% 26Spray Fireproofing
* PGS Millwork 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 17 100% 17 0 0% 1 100% 1Millwork
* Platinum Terrazzo, Inc. 263 52% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 263 52% 247 48% 510 4 57% 3 43% 7Fluid-Applied Flooring
* RCC Concrete Corp 4,057 43% 24 0% 24 0% 0 0% 0 0% 0 0% 0 0% 4,105 44% 5,244 56% 9,348 39 30% 90 70% 129Above Grade Concrete
* Re:Source New Jersey 341 16% 0 0% 0 0% 281 13% 0 0% 0 0% 0 0% 622 29% 1,501 71% 2,123 4 27% 11 73% 15Resilient Flooring & Base
* Sirina Fire Protection Corp 2,990 79% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 2,990 79% 810 21% 3,800 7 30% 16 70% 23Fire Protection Systems
* Trystate Burns Mechanical 6,230 15% 272 1% 48 0% 80 0% 40 0% 0 0% 0 0% 6,670 16% 35,062 84% 41,732 26 29% 64 71% 90HVAC Systems
* United Drilling 972 100% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 972 100% 0 0% 972 3 100% 0 0% 3Drilling
* Westchester Metal Works 5,426 62% 0 0% 0 0% 35 0% 1,990 23% 0 0% 0 0% 7,451 85% 1,352 15% 8,803 20 63% 12 38% 32Metal Stairs
* Woodworks Construction 25,413 71% 0 0% 1,280 4% 0 0% 1,770 5% 0 0% 0 0% 28,463 79% 7,536 21% 35,998 30 71% 12 29% 42Drywall
Total Hours 88,213 1,418 1,352 2,235 4,545 0 126 97,889 148,272 246,160 306 450 756Overall % of Total 36% 1% 1% 1% 2% 0% 0% 40% 60% 100% 40% 60% 100%
Contractor Start3L & Company Inc 8/7/2016ASR Electric 6/24/2015Champion Metal 12/7/2016Cives 5/2/2014Commodore 2/2/2016Creative Construction Services 10/11/2014Eagle Scaffolding 5/30/2016Fine Painting & Decorating Company Inc 6/7/2015Giachetti Plumbing & Heating Corp. 12/23/2014LVC Interiors Inc 7/22/2017Metropolitan Enterprises 7/20/2014Nets That Work 10/14/2014Otis Elevators 8/28/2015PAL Environmental 1/18/2015PGS Millwork 7/1/2017Platinum Terrazzo, Inc. 9/3/2016RCC Concrete Corp 9/2/2014Re:Source New Jersey 8/28/2016Sirina Fire Protection Corp 8/19/2014Trystate Burns Mechanical 6/2/2015United Drilling 4/3/2014Westchester Metal Works 7/25/2014Woodworks Construction 5/19/2015
* Denotes active contractors
LenfestSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In ProgressIn Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
78
GC/CM: Lend Lease
Date Range: 4/1/2019 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier II 3L & Company Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Ceramic Tile
* ASR Electric 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Electrical
* Champion Metal 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Glass & Glazing, Snorkel, Millwork
* Cives 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Structural Metals
* Commodore 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Masonry
* Creative Construction Services 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Safety Equipment
* Eagle Scaffolding 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Scaffolding, Waterproofing & Roofing
* Fine Painting & Decorating Company Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Painting & Instrumentation
* Giachetti Plumbing & Heating Corp. 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Plumbing
* LVC Interiors Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Window Treatment / Blinds
* Metropolitan Enterprises 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Hoist/Bridges/Scaffold
* Nets That Work 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Safety Equipment
* Otis Elevators 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Elevators
* PAL Environmental 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Spray Fireproofing
* PGS Millwork 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Millwork
* Platinum Terrazzo, Inc. 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Fluid-Applied Flooring
* RCC Concrete Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Above Grade Concrete
* Re:Source New Jersey 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Resilient Flooring & Base
* Sirina Fire Protection Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Fire Protection Systems
* Trystate Burns Mechanical 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0HVAC Systems
* United Drilling 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Drilling
* Westchester Metal Works 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Metal Stairs
* Woodworks Construction 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Drywall
0 0 0 0 0 0 0 0 0 0 0 0 00% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
LenfestSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
* Denotes active contractors1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total HoursOverall % of Total
79
University Forum
80
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,108,853 $ 1,108,853
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Electric Yes $ ‐ $ 10,110 $ 10,110 W No Printing Service Yes $ ‐ $ 19,204 $ 19,204
NON No Safeway Fire ‐ Monitoring Yes $ ‐ $ 1,295 $ 1,295
NON No Service Yes $ ‐ $ 7,875 $ 7,875 NON No Furniture Yes $ ‐ $ 909,061 $ 909,061 NON No Commissioning Yes $ ‐ $ 26,846 $ 26,846 NON No Electrical Yes $ ‐ $ 6,466 $ 6,466 NON No Material Testing Yes $ ‐ $ 71,745 $ 71,745 NON No HVAC Yes $ ‐ $ 3,320 $ 3,320 NON No Exterior / Roofing Yes $ ‐ $ 52,931 $ 52,931
$ ‐ $ 1,108,853 $ 1,108,853 $ ‐ $ 29,314 $ 29,314
Non‐MWL Direct Spend Total $ ‐ $ 1,079,539 $ 1,079,539 0% 3% 3%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
275 Technology Solutions dba Safeway Fire & Protection Company
Siemens Industry IncVidaris Inc
Barbizon Elec Co IncEmpire Off Inc
Live Wire Electric 1 LLCEnvirobusiness Inc
Municipal Testing Laboratory
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University University Forum410 West 118th Street, NY, NY 10027
NON:
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Green Girl Printing and Messenger IncA Tech Electric Enterprise Inc
81
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 79,567,812
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Construction Management Yes $ 69,564,624 $ 79,567,812 $ 79,567,812
$ 69,564,624 $ 79,567,812 $ 79,567,812 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ 69,564,624 $ 79,567,812 $ 79,567,812 0% 0% 0%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Skanska
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University University Forum
82
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,333,419 $ 1,323,633
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Construction Management Yes $ ‐ $ 1,323,633 $ 1,323,633
$ ‐ $ 1,323,633 $ 1,323,633 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ ‐ $ 1,323,633 $ 1,323,633 0% 0% 0%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Lend Lease US Construction LMB
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University University Forum
83
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 69,564,624 $ 79,567,812 $ 79,567,812
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Electric Yes $ 7,109,178 $ 8,564,523 $ 8,199,775 M‐ESD No Electric Yes $ 4,144,000 $ 4,228,167 $ 4,033,672 M‐ESD No Masonry Yes $ 1,200,000 $ 1,152,376 $ 1,152,376 M‐ESD No Tiling Yes $ 310,000 $ 329,549 $ 329,549 L No Plumbing Yes $ 1,162,300 $ 1,280,551 $ 1,216,125 W‐ESD No Electrical Equipment Yes $ 249,460 $ 262,710 $ 262,710 W‐ESD No Signage Yes $ 144,643 $ 206,910 $ 194,524 W‐ESD No Toilet Accessories Yes $ 48,810 $ 49,418 $ 49,418
NON No Access Flooring Yes $ 174,000 $ 198,282 $ 178,454 NON No Metal Panels Yes $ 470,000 $ 470,000 $ 335,646 NON No Roofing Yes $ 1,200,000 $ 1,302,899 $ 1,171,721 NON No Interior Glass Yes $ 845,000 $ 841,925 $ 781,960 NON No Millwork Yes $ 5,000,000 $ 6,395,320 $ 5,921,160 NON No Fire Protection Yes $ 565,000 $ 647,500 $ 539,289 NON No Structural Steel Yes $ 4,497,000 $ 6,810,745 $ 6,810,745 NON No Window Treatment Yes $ 237,500 $ 243,969 $ 214,449 NON No Plumbing Yes $ 8,000 $ 11,328 $ 11,328 NON No Painting Yes $ 280,000 $ 414,756 $ 355,445 NON No Polished Concrete Yes $ 365,000 $ 365,000 $ 216,607 NON No HVAC Equipment Yes $ 327,000 $ 327,000 $ 285,446 NON No Millwork Yes $ 298,000 $ 455,568 $ 404,881 NON No Spray on Thermal & Fire Proof Yes $ 387,000 $ 395,793 $ 349,353 NON No Auditorium Yes $ 250,000 $ 250,000 $ 219,015 NON No Doors, Frames & Hardware Yes $ 161,000 $ 221,347 $ 206,208 NON No Elevators Yes $ 1,869,000 $ 2,049,294 $ 1,797,654 NON No Flooring Yes $ 310,000 $ 362,345 $ 318,286 NON No Excavation/Foundation Yes $ 9,542,100 $ 10,873,323 $ 10,873,323 NON No Elevated Slabs on Deck Yes $ 1,038,000 $ 1,235,260 $ 1,089,616 NON No Misc Metals Yes $ 1,129,413 $ 1,569,615 $ 1,462,808 NON No HVAC Yes $ 6,697,000 $ 7,589,761 $ 6,772,257 NON No Epoxy Flooring Yes $ 17,920 $ 17,920 $ 16,128 NON No Wood Flooring Yes $ 310,000 $ 315,045 $ 244,121 NON No Interior Glass Partitions Yes $ 655,000 $ 750,740 $ 645,110 NON No Overhead Doors Yes $ 230,000 $ 230,000 $ 193,545 NON No Final Cleaning Yes $ 129,350 $ 129,350 $ 98,415 NON No Food Service Equipment Yes $ 80,198 $ 126,546 $ 104,033 NON No Landscaping Yes $ 389,500 $ 389,500 $ 293,108
$ 51,830,372 $ 61,064,335 $ 57,348,260 $ 14,368,391 $ 16,074,204 $ 15,438,149
Non‐MWL Tier II Total $ 37,461,981 $ 44,990,131 $ 41,910,111 21% 20% 19%
Date: 06/30/2019
Gil Bar Industries
Island Diversified
Current Fire ProtectionDaniel Teutul DBA Orange County Iron WorksDecorating with Fabric
Fromkin Brothers
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
United Air Conditioning
Nouveau Elevator Industries IncPyramid Floor Covering Inc
McKeon Door East
Centron EnterprisesHaywood‐Berk Floor Modulo 3 Corporation DBA Unifor
Clean TechSinger Equipment Company IncSteven Dubner Landscaping Inc
MWL Tier II Total
MWL % of Tier I
Giachetti Plumbing & HeatingTurtle & HughesCrown Sign Systems Inc
A Tech Electric Enterprise Inc
Tier II Grand Total
Ruttura & Sons Co IncRuttura & Sons Co IncTranscontinental Steel
Long Island Fireproof Door
Barrett IncChampion Metal & Glass Inc
Holden & Flynn Universal
Delphi Plumbing
Cord Contracting
Fromkin Brothers
Jezet Seating
Name/Address/Phone # (if available) otherwise enter Trade
MWL:A Tech Electric Enterprise Inc
Ashlar Construction LLCGarcia Marble & Tile
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Skanska University Forum
ARI Products IncBamco Inc
Locker Lady
COMPANY (Tier I)
Construction Management Trades659 West 131st Street, New York, NY 10027 347-918-78716/30/2019 In Progress
Name Trade
NON:
Skanska Construction Management
SUBCONTRACTORS (Tier II)
84
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 69,564,624 $ 79,567,812 $ 79,567,812
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Construction Management Yes $ ‐ $ 497,823 $ 479,183 W‐ESD No Vendor Yes $ ‐ $ 2,684 $ 2,684 MW‐ESD No Vendor Yes $ ‐ $ 7,044 $ 7,044 W‐ESD No Vendor Yes $ ‐ $ 28,165 $ 28,165 MWL‐ESD No Exteriminator Yes $ ‐ $ 11,085 $ 11,085 MW‐ESD No Security Yes $ ‐ $ 418,739 $ 418,739 M‐ESD No Scheduling Yes $ ‐ $ 13,050 $ 13,050 M‐ESD No Construction and Civil Engineering Yes $ ‐ $ 337,003 $ 337,003
$ ‐ $ 1,315,593 $ 1,296,953 $ ‐ $ 1,315,593 $ 1,296,953
Non‐MWL Tier II Total $ ‐ $ ‐ $ ‐ 0% 2% 2%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier II Grand TotalMWL Tier II Total
MWL % of Tier I
JT Hicks AssociatesBasu Technology Inc
Skanska Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Velez OrganizationThe Olympic Glove & Safety Co IncDeb RomainCarter, Milchman & FrankPestrol IncEddington Security Inc
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Skanska University ForumConstruction Management General Conditions659 West 131st Street, New York, NY 10027 347-918-78716/30/2019 In Progress
COMPANY (Tier I)
85
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ ‐ $ 1,333,419 $ 1,323,633
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Utilities Yes $ 1,277,929 $ 1,307,930 $ 1,307,930 L No Electrical Yes $ ‐ $ 25,489 $ 25,489
$ 1,277,929 $ 1,333,419 $ 1,333,419 $ 1,277,929 $ 1,333,419 $ 1,333,419
Non‐MWL Tier II Total $ ‐ $ ‐ $ ‐ 0% 100% 101%
Date: 06/30/2019
Tier II Grand TotalMWL Tier II Total
MWL % of Tier I
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Name Trade
Lend Lease Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:MFM Contracting CorpMFM Contracting Corp
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease University Forum
COMPANY (Tier I)
Construction Management622 West 132nd, 2nd fl, New York, NY 10027 347-918-78716/30/2019 In Progress
86
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 9,542,100 $ 10,873,323 $ 10,873,323
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
MW‐ESD No Trucking/Disposal of Soil Yes $ 650,000 $ 820,719 $ 820,719 W‐ESD No Rebar Detailer Yes $ 20,900 $ 28,020 $ 28,020 W‐ESD No Dewatering Yes $ 1,000,000 $ 1,000,000 $ 683,491 M‐ESD No Waterproofing Yes $ 328,600 $ 429,336 $ 407,903 W‐ESD No Furnish/Install Rebar Yes $ 950,000 $ 1,253,810 $ 1,253,810 M‐ESD No Main Switch Electrical Yes $ 25,000 $ 140,858 $ 133,815
Yes
NON No Equipment/Pump Rental Yes $ 51,000 $ 159,553 $ 159,553 NON No Concrete Supplier Yes $ 172,000 $ 550,582 $ 550,582 NON No Furnish/Install Temp. Fence Yes $ 157,036 $ 172,141 $ 172,141 NON No Supplier Yes $ 33,341 $ 36,571 $ 36,571 NON No Furnish/Install Piles Yes $ 185,500 $ 185,500 $ 185,500 NON No Furnish/Install Temp Water Svc Yes $ 43,400 $ 43,400 $ 41,230 NON No Furnish/Install DIP for Storm Yes $ 40,500 $ 51,300 $ 48,735 NON No Furnish/Install Tie‐Backs Yes $ 276,000 $ 276,000 $ 262,200
$ 3,933,277 $ 5,147,790 $ 4,784,270 $ 2,974,500 $ 3,672,743 $ 3,327,758
Non‐MWL Tier III Total $ 958,777 $ 1,475,047 $ 1,456,512 31% 34% 31%
Date: 06/30/2019
Excavation/Foundation
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
SkanskaRuttura & Sons Co Inc University Forum
Green Earth Solutions
200 Cabot Street, West Babylon, NY 11704 631-454-02916/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Ruttura & Sons Co Inc Excavation/Foundation
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Moretrench American Corp
Madeline LulleyAMG Demolition IncD Star WaterproofersCGS Rebar IncA Tech Electric Enterprise Inc
NON:Our Rental CorpJenna Concrete CorpEagle FenceTulnoy LumberJet‐Drive ContractingBancker Construction CorpMetropolitan Sewer
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
87
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,038,000 $ 1,235,260 $ 1,089,616
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Install Rebar Yes $ 107,036 $ 107,036 $ 107,036 W‐ESD No Rebar Detailer Yes $ 800 $ 1,480 $ 1,480 W‐ESD No Pump Rental Yes $ 7,621 $ 14,643 $ 14,643
NON No Concrete Supplier Yes $ 99,478 $ 196,313 $ 196,313 NON No Rebar Supplier Yes $ 28,674 $ 29,046 $ 29,046
$ 243,609 $ 348,518 $ 348,518 $ 115,457 $ 123,159 $ 123,159
Non‐MWL Tier III Total $ 128,152 $ 225,359 $ 225,359 11% 10% 11%
Date: 06/30/2019
Barker Steel
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
Madeline LulleyOur Rental Pumps
NON:USC Jenna
CGS Rebar Inc
200 Cabot Street, West Babylon, NY 11704 631-454-02916/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Ruttura & Sons Co Inc Elevated Slabs on Deck
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Elevated Slabs on Deck
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
SkanskaRuttura & Sons Co Inc University Forum
88
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 4,497,000 $ 6,810,745 $ 6,810,745
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Steel Supplier Yes $ 161,000 $ 230,000 $ 207,557 M‐ESD No Trucking Yes $ 78,000 $ 110,000 $ 101,200 W‐ESD No Steel Supplier Yes $ 10,000 $ 30,000 $ 27,657 M‐ESD No Intumenscent Painting Yes $ 550,000 $ 565,811 $ 565,811
NON No Structural Steel Erection Yes $ 907,000 $ 3,003,341 $ 2,918,313 NON No Surveying Yes $ 30,000 $ 60,000 $ 53,042
$ 1,736,000 $ 3,999,152 $ 3,873,580 $ 799,000 $ 935,811 $ 902,225
Non‐MWL Tier III Total $ 937,000 $ 3,063,341 $ 2,971,355 18% 14% 13%
Date: 06/30/2019
NON:Gabriel Steel Erectors Inc
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
Contractors Line & Grade So LLC
Interstate Steel Sales Inc
36 Maybrook Road, Montgomery, NY 12549 845-769-30006/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Orange County Iron Works Structural Steel
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Speedway Transportation Inc
Fine Painting & Decorating Company Inc
Structural Steel
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
SkanskaOrange County Iron Works University Forum
The Steel Supply Co Inc
89
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 6,697,000 $ 7,589,761 $ 6,772,257
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Sheetmetal Yes $ 1,736,000 $ 1,736,000 $ 1,736,000
$ 1,736,000 $ 1,736,000 $ 1,736,000 $ 1,736,000 $ 1,736,000 $ 1,736,000
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 26% 23% 26%
Date: 06/30/2019
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
United Air Conditioning HVAC
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Center Sheet Metal
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
SkanskaUnited Air Conditioning University ForumHVAC27-20 Skillman Ave. Long Island City, NY 11101 718-893-67006/30/2019 In Progress
COMPANY (Tier II)
90
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,129,413 $ 1,569,615 $ 1,462,808
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Ironwork Yes $ 230,000 $ 642,237 $ 642,237
$ 230,000 $ 642,237 $ 642,237 $ 230,000 $ 642,237 $ 642,237
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 20% 41% 44%
Date: 06/30/2019
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
Transcontinental Steel Misc Metals
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Anvil Iron Works
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
SkanskaTranscontinental Steel University ForumMisc Metals27-20 Skillman Ave. Long Island City, NY 11101 718-893-67006/30/2019 In Progress
COMPANY (Tier II)
91
Schedule M3
CM Name:Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 5,000,000 $ 6,395,320 $ 5,921,160
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W No Lather Yes $ 75,788 $ 84,898 $ 84,898 M‐ESD No Accoustical Wall Panels Yes $ 41,370 $ 23,661 $ 23,661 W‐ESD No Firestopping Yes $ 52,435 $ 71,857 $ 71,857 W No Taper Yes $ 181,311 $ 162,781 $ 162,781 M‐ESD No Materials Yes $ ‐ $ 192,919 $ 192,919 W No Materials Yes $ ‐ $ 28,899 $ 28,899
$ 350,904 $ 565,015 $ 565,015 $ 350,904 $ 565,015 $ 565,015
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 7% 9% 10%
Date: 06/30/2019
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
Cord Contracting Millwork
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Central LathingEco SpecialtiesHailey Insulation CorpLinda Lee ConstructionPark Avenue Building & Roofing Supplies LLCCity Lumber
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
SkanskaCord Contracting University ForumMillwork80 Crossways Park Drive, Ste. 300, Woodbury, NY 11797 516-626-88006/30/2019 In Progress
COMPANY (Tier II)
92
GC/CM: Skanska
Date Range: 8/1/2008 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
Tier II A Tech Electric Enterprises Inc 34,252 81% 0 0% 0 0% 1,336 3% 0 0% 0 0% 0 0% 35,588 84% 6,933 16% 42,521 39 72% 15 28% 54Main Switch ElectricalARI Products 363 64% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 363 64% 202 36% 565 5 83% 1 17% 6Access FlooringAshlar Construction LLC 5,685 50% 7 0% 8 0% 0 0% 1,225 11% 0 0% 0 0% 6,924 61% 4,465 39% 11,389 32 68% 15 32% 47MasonryBarrett 3,093 74% 0 0% 0 0% 0 0% 8 0% 0 0% 0 0% 3,101 74% 1,079 26% 4,180 40 77% 12 23% 52RoofingCord Contracting Co Inc 4,971 31% 0 0% 0 0% 0 0% 622 4% 0 0% 310 2% 5,903 37% 10,250 63% 16,152 17 26% 49 74% 66MillworkCrown Sign Systems 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 8 100% 8 0 0% 1 100% 1SignageCurrent Fire Protection Inc 1,471 42% 0 0% 0 0% 0 0% 42 1% 0 0% 0 0% 1,513 43% 1,967 57% 3,480 8 53% 7 47% 15Fire ProtectionEddington Security Inc 13,916 78% 0 0% 0 0% 0 0% 3,940 22% 0 0% 0 0% 17,856 100% 0 0% 17,856 36 100% 0 0% 36SecurityFromkin Brothers 1,678 42% 0 0% 113 3% 0 0% 16 0% 0 0% 0 0% 1,807 45% 2,169 55% 3,976 16 67% 8 33% 24PaintingGarcia Marble & Tile 1,628 96% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 1,628 96% 70 4% 1,698 9 90% 1 10% 10TilingGiachetti Plumbing & Heating Corp 1,793 24% 0 0% 0 0% 116 2% 0 0% 0 0% 0 0% 1,909 25% 5,593 75% 7,502 4 10% 37 90% 41PlumbingMcKeon Door East 240 67% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 240 67% 120 33% 360 6 86% 1 14% 7Overhead DoorsOrange County Ironworks, LLC 7,541 46% 0 0% 0 0% 183 1% 0 0% 0 0% 0 0% 7,724 47% 8,569 53% 16,293 32 38% 53 62% 85Structural SteelPyramid Floor Covering 175 65% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 175 65% 96 35% 271 2 29% 5 71% 7FlooringRuttura & Sons 19,645 55% 163 0% 0 0% 0 0% 304 1% 0 0% 0 0% 20,112 56% 15,529 44% 35,640 115 45% 138 55% 253Excavation/FoundationTranscontinental Contracting Inc 3,763 86% 0 0% 0 0% 0 0% 113 3% 0 0% 0 0% 3,876 88% 515 12% 4,391 24 86% 4 14% 28Misc MetalsUnited Air Conditioning Corp 5,544 55% 0 0% 0 0% 0 0% 171 2% 0 0% 0 0% 5,715 57% 4,361 43% 10,076 12 57% 9 43% 21HVAC
105,756 170 121 1,635 6,441 0 310 114,431 61,925 176,355 397 356 75360% 0% 0% 1% 4% 0% 0% 65% 35% 100% 53% 47% 100%
Contractor Start A Tech Electric Enterprises Inc 11/23/2016ARI Products 4/16/2018Ashlar Construction LLC 5/23/2017Barrett 1/8/2017Cord Contracting Co Inc 7/2/2017Crown Sign Systems 6/30/2018Current Fire Protection Inc 10/3/2017Eddington Security Inc 8/17/2016Fromkin Brothers 11/6/2017Garcia Marble & Tile 3/18/2018Giachetti Plumbing & Heating Corp 11/22/2016McKeon Door East 5/11/2018Orange County Ironworks, LLC 1/6/2017Pyramid Floor Covering 8/7/2018Ruttura & Sons 1/4/2016Transcontinental Contracting Inc 5/21/2017United Air Conditioning Corp 8/22/2017
University ForumSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
* Denotes active contractors1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
12/31/2018
Total Hours
12/31/2018
Overall % of Total
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
12/31/2018
93
GC/CM: Skanska
Date Range: 4/1/2019 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
Tier II A Tech Electric Enterprises Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Main Switch ElectricalARI Products 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Access FlooringAshlar Construction LLC 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0MasonryBarrett 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0RoofingCord Contracting Co Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0MillworkCrown Sign Systems 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0SignageCurrent Fire Protection Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Fire ProtectionEddington Security Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0SecurityFromkin Brothers 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0PaintingGarcia Marble & Tile 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0TilingGiachetti Plumbing & Heating Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0PlumbingMcKeon Door East 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Overhead DoorsOrange County Ironworks, LLC 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Structural SteelPyramid Floor Covering 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0FlooringRuttura & Sons 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Excavation/FoundationTranscontinental Contracting Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Misc MetalsUnited Air Conditioning Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0HVAC
0 0 0 0 0 0 0 0 0 0 0 0 00% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
University ForumSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total HoursOverall % of Total
* Denotes active contractors
94
Phase 2 Below Grade
95
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 189,000
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Pest Control Yes $ ‐ $ 337 $ 337 L No Electrical Yes $ ‐ $ 3,117 $ 3,117 W No Printing Service Yes $ ‐ $ 4,034 $ 4,034 L No General Contractor Yes $ ‐ $ 51,306 $ 51,306 WL‐ESD No General Contractor Yes $ ‐ $ 5,621 $ 5,621 MWL‐ESD No Cleaning Yes $ ‐ $ 100,003 $ 100,003 W No Signage Yes $ ‐ $ 488 $ 488 L No Plumbing Yes $ ‐ $ 1,731 $ 1,731 W‐ESD No Air Conditioning Yes $ ‐ $ 3,637 $ 3,637
NON No Security Systems Yes $ ‐ $ 185 $ 185 NON No Waste Management Yes $ ‐ $ 518 $ 518 NON No Doors & Windows Yes $ ‐ $ 304 $ 304 NON No Telecommunication Yes $ ‐ $ 17,719 $ 17,719
$ ‐ $ 189,000 $ 189,000 $ ‐ $ 170,274 $ 170,274
Non‐MWL Direct Spend Total $ ‐ $ 18,726 $ 18,726 0% 90% 90%
Date: 06/30/2019
NON:Access Control Technologies IncAction Carting Environmental ServicSOS Locksmith CorpStarCom Communications Service
Name Trade
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
Doumas Electric IncGreen Girl Printing and Messenger Inc
Scrub Clean Maintenance CorpThe Sign Works IncWatsons Plumbing and Heating
Izzo Construction CorpKing Rose of NY Inc
M & J Mechanical Corp
Black Widow Termite & Pest Control Corp
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Phase 2 Below Grade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
6/30/2019 In Progress
OWNER
96
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 181,058,419
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Construction Management Yes $ ‐ $ 181,058,419 $ 181,058,419
$ ‐ $ 181,058,419 $ 181,058,419 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ ‐ $ 181,058,419 $ 181,058,419 0% 0% 0%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Lend Lease US Construction LMB
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Phase 2 Below Grade
97
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ ‐ $ 181,058,419 $ 181,058,419
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Excavation Yes $ ‐ $ 65,968,287 $ 62,259,801 L No Foundation Yes $ ‐ $ 77,120,384 $ 74,290,337 MW‐ESD No Security Yes $ ‐ $ 101,285 $ 101,285 M No Utility Yes $ ‐ $ 5,467,000 $ 1,565,768 MWL‐ESD No Security Yes $ ‐ $ 1,353,325 $ 1,353,325
The McKissack Group Inc MWL‐ESD No Construction Management Yes $ ‐ $ 174,218 $ 174,218 M No Concrete Yes $ ‐ $ 9,295,490 $ 8,276,008
NON No Structural Steel Yes $ ‐ $ 16,858,509 $ 16,420,113 NON No Protection Yes $ ‐ $ 434,927 $ 424,000 NON No Electrical Yes $ ‐ $ 1,500,576 $ 1,443,568
$ ‐ $ 178,274,001 $ 166,308,423 $ ‐ $ 159,479,989 $ 148,020,742
Non‐MWL Tier II Total $ ‐ $ 18,794,012 $ 18,287,681 0% 88% 82%
Date: 06/30/2019MWL % of Tier I
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier II Grand TotalMWL Tier II Total
Par Environmental CorpASR Electrical Contracting Inc
Cives Corp
Lend Lease Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Civetta Cousins
Eddington Security Inc
Johnson Security Bureau Inc
NON:
Civetta Cousins
Roger & Sons Concrete Inc
J. D'Annunzio & Sons, Inc.
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease Phase 2 Below GradeConstruction Management622 West 132nd, 2nd fl, New York, NY 10027 212-939-95806/30/2019 In Progress
COMPANY (Tier I)
98
Schedule M3
CM Name:Company Name: Civetta Cousins Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sL No $ 65,968,287 $ 65,968,287 $ 62,259,801
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Reinforcing Steel Supplier Yes $ 42,120 $ 107,809 $ 107,809 W‐ESD No Reinforcing Steel Installation Yes $ 91,800 $ 123,827 $ 117,635 W No Saw Cutting & Core Drilling Yes $ 177,965 $ 203,798 $ 191,908
NON No Waterproofing Yes $ 177,900 $ 179,381 $ 175,793 NON No Electrical Contractor Yes $ 425,000 $ 508,235 $ 503,308 NON No Furnish & Installation of Deep Wells Yes $ 660,000 $ 849,688 $ 677,709 NON Yes Installation of Piles and Anchors Yes $ 12,500,000 $ 14,447,368 $ 14,242,660
$ 14,074,785 $ 16,420,106 $ 16,016,822 $ 311,885 $ 435,434 $ 417,352
Non‐MWL Tier III Total $ 13,762,900 $ 15,984,672 $ 15,599,470 0% 1% 1%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeasePhase 2 Below Grade
Excavation
CFS Steel Co
1100 East 156th Street Bronx, NY 10474 718-991-51006/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Civetta Cousins Excavation
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
J&E Industries LLC
NON:
JJ Rosenberg Electrical ContractorsMoretrench American CorpMoretrench / Hayward Baker Inc
Eagle One Roofing Contractors Inc
JP Hogan Coring
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
99
Schedule M3
CM Name:Company Name: Civetta Cousins Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sL No $ 77,120,384 $ 77,120,384 $ 74,290,337
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Reinforcing Steel Supplier Yes $ 2,500,000 $ 2,500,000 $ 2,439,148 W‐ESD No Reinforcing Steel Installation Yes $ 5,750,000 $ 5,750,000 $ 5,063,488
NON Yes Installation of Piles and Anchors Yes $ 24,000,000 $ 24,000,000 $ 23,072,500 NON No Electrical Contractor Yes $ 652,000 $ 745,817 $ 588,999 NON No Waterproofing Yes $ 3,300,000 $ 3,454,063 $ 1,616,887
$ 36,202,000 $ 36,449,880 $ 32,781,022 $ 8,250,000 $ 8,250,000 $ 7,502,636
Non‐MWL Tier III Total $ 27,952,000 $ 28,199,880 $ 25,278,386 11% 11% 10%
Date: 06/30/2019
MWL % of Tier II
Tier III Grand TotalMWL Tier III Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
JA Lee Electrical ServicesMelric Systems Corp
J&E Industries LLC
NON:Moretrench / Hayward Baker Inc
Civetta Cousins Foundation
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:CFS Steel Co
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeasePhase 2 Below Grade
Foundation1100 East 156th Street Bronx, NY 10474 718-991-51006/30/2019 In Progress
COMPANY (Tier II)
100
Schedule M3
CM Name:Company Name: Par Environmental Corp Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 434,927 $ 434,927 $ 424,000
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON Yes Concrete Masonry Fireproofing Yes $ 33,672 $ 33,672 $ 33,672
$ 33,672 $ 33,672 $ 33,672 $ ‐ $ ‐ $ ‐
Non‐MWL Tier III Total $ 33,672 $ 33,672 $ 33,672 0% 0% 0%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
NON:Commodore Construction Corporation
Par Environmental Corp Protection
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
313 Spook Rock Road, Suffern, New York 10901 854-369-75006/30/2019 In Progress
COMPANY (Tier II)
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeasePhase 2 Below Grade
Protection
101
Schedule M3
CM Name:Company Name: Cives Corp Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 16,858,509 $ 16,858,509 $ 16,420,113
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Misc Steel Yes $ 500,000 $ 654,352 $ 652,511 W‐ESD No Material Yes $ 1,750,000 $ 1,787,268 $ 1,779,435
NON No Steel Erection Yes $ 8,790,000 $ 9,152,394 $ 7,928,185
$ 11,040,000 $ 11,594,014 $ 10,360,131 $ 2,250,000 $ 2,441,620 $ 2,431,946
Non‐MWL Tier III Total $ 8,790,000 $ 9,152,394 $ 7,928,185 13% 14% 15%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
Commonwealth Metal Co
NON:JF Stearns
Baco Enterprises Inc
8 Church Street, Gouverneur, NY 13642 315-287-22006/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Cives Corp Structural Steel
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeasePhase 2 Below Grade
Structural Steel
102
Schedule M3
CM Name:Company Name: Roger & Sons Concrete Inc Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sM No $ 9,295,490 $ 9,295,490 $ 8,276,008
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Reinforcing Supply Yes $ 2,606,273 $ 2,699,773 $ 2,699,773 W‐ESD No Concrete Pumping Yes $ 75,770 $ 75,770 $ 6,668 M‐ESD No Concrete Pumping Yes $ 75,770 $ 75,770 $ 58,079
$ 2,757,813 $ 2,851,313 $ 2,764,520 $ 2,757,813 $ 2,851,313 $ 2,764,520
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 30% 31% 33%
Date: 06/30/2019
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Roger & Sons Concrete Inc Concrete
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Tonage IncOur Rental PumpsPrecision Concrete
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Lend LeasePhase 2 Below Grade
Concrete1474 RT. 55 LAGRANGEVILLE, NY 12540 845-227-60336/30/2019 In Progress
COMPANY (Tier II)
103
GC/CM: Lend Lease
Date Range: 8/1/2008 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 5,385 46% 2,357 20% 8 0% 0 0% 0 0% 0 0% 0 0% 7,750 67% 3,864 33% 11,614 11 65% 6 35% 17Construction Management
* Tier II ASR Electrical Contracting Inc 545 12% 0 0% 0 0% 48 1% 0 0% 0 0% 0 0% 593 13% 3,877 87% 4,469 5 19% 22 81% 27Electrical
* Cives Steel 7,133 15% 0 0% 0 0% 8 0% 165 0% 0 0% 0 0% 7,306 16% 39,170 84% 46,476 31 24% 98 76% 129Structural Steel
* Civetta Cousins JV 107,064 36% 2,192 1% 368 0% 2,568 1% 3,978 1% 0 0% 0 0% 116,170 39% 183,025 61% 299,195 235 38% 379 62% 614Street Structures
* J D'Annunzio & Sons 1,124 35% 0 0% 0 0% 0 0% 8 0% 0 0% 0 0% 1,132 35% 2,119 65% 3,251 14 35% 26 65% 40Utility
* Par Environmental Corporation 2,283 55% 0 0% 0 0% 16 0% 0 0% 0 0% 0 0% 2,299 55% 1,875 45% 4,174 19 54% 16 46% 35Protection
* Roger & Sons 17,957 38% 47 0% 0 0% 192 0% 287 1% 0 0% 68 0% 18,551 39% 28,824 61% 47,375 135 43% 180 57% 315Concrete
141,491 4,596 376 2,832 4,438 0 68 153,800 262,752 416,552 450 727 1,17734% 1% 0% 1% 1% 0% 0% 37% 63% 100% 38% 62% 100%
Contractor Start ASR Electrical Contracting Inc 12/6/2017Cives Steel 10/8/2016Civetta Cousins JV 10/8/2016J D'Annunzio & Sons 12/29/2018Par Environmental Corporation 5/7/2017Roger & Sons 2/27/2018
* Denotes active contractors1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In Progress
In Progress
In ProgressIn Progress
In Progress
In Progress
Overall % of Total
Phase 2 Below GradeSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
Total Hours
104
GC/CM: Lend Lease
Date Range: 4/1/2019 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 497 28% 510 28% 8 0% 0 0% 0 0% 0 0% 0 0% 1,015 57% 781 43% 1,795 3 50% 3 50% 6Construction Management
* Tier II ASR Electrical Contracting Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Electrical
* Cives Steel 55 30% 0 0% 0 0% 0 0% 43 23% 0 0% 0 0% 98 53% 87 47% 185 3 50% 3 50% 6Structural Steel
* Civetta Cousins JV 632 25% 0 0% 0 0% 0 0% 194 8% 0 0% 0 0% 826 33% 1,655 67% 2,481 12 32% 26 68% 38Street Structures
* J D'Annunzio & Sons 1,116 36% 0 0% 0 0% 0 0% 8 0% 0 0% 0 0% 1,124 36% 1,975 64% 3,099 13 34% 25 66% 38Utility
* Par Environmental Corporation 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Protection
* Roger & Sons 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 64 100% 64 0 0% 2 100% 2Concrete
2,299 510 8 0 245 0 0 3,062 4,561 7,623 31 59 9030% 7% 0% 0% 3% 0% 0% 40% 60% 100% 34% 66% 100%
* Denotes active contractors1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total HoursOverall % of Total
Phase 2 Below GradeSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
105
Columbia Business School
106
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ ‐ $ 148,015 $ 148,015
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Electrical Yes $ ‐ $ 2,765 $ 2,765 W No Signs Yes $ ‐ $ 10,984 $ 10,984 L No General Contractor Yes $ ‐ $ 663 $ 663 MWL‐ESD No Cleaning Yes $ ‐ $ 42,455 $ 42,455
NON No AV/Cable/Telecom Yes $ ‐ $ 91,148 $ 91,148
$ ‐ $ 148,015 $ 148,015 $ ‐ $ 56,867 $ 56,867
Non‐MWL Direct Spend Total $ ‐ $ 91,148 $ 91,148 0% 38% 38%
Date: 06/30/2019MWL % of Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
King Rose of NY Inc
NON:Construction Documentation of NYC LLC
Scrub Clean Maintenance Corp
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Doumas Electric IncGreen Girl Printing and Messenger Inc
Columbia University Owner
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Columbia Business School Above Grade410 West 118th Street, NY, NY 100276/30/2019 In Progress
OWNER
Name Trade
107
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ ‐ $ 53,573,899 $ 53,573,899
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Construction Management Yes $ ‐ $ 53,573,899 $ 53,573,899
$ ‐ $ 53,573,899 $ 53,573,899 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ ‐ $ 53,573,899 $ 53,573,899 0% 0% 0%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Turner Construction Company
Columbia University Owner
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Columbia Business School Above Grade410 West 118th Street, NY, NY 100276/30/2019 In Progress
OWNER
Name Trade
108
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No $ ‐ $ 53,573,899 $ 53,573,899
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Office Supplies Yes $ ‐ $ 34 $ 34 L No Miscellanous Expenses Yes $ ‐ $ ‐ $ 2,564 L No Miscellanous Expenses Yes $ ‐ $ 135 $ 135 L No Miscellanous Expenses Yes $ ‐ $ 33 $ 33 MW‐ESD No Office Supplies Yes $ ‐ $ 30,284 $ 31,945 MW No Safety Supplies Yes $ ‐ $ 54,473 $ 6,199 M‐ESD No Site Safety Yes $ 196,280 $ 196,280 $ 45,418 W‐ESD No Fire Protection Yes $ 3,961,400 $ 3,961,400 $ 475,723 M No Concrete Yes $ 10,887,633 $ 11,383,155 $ 4,441,173 M‐ESD No Fire Alarm Yes $ 7,882,146 $ 7,882,146 $ 582,282 M‐ESD No Perimeter Fence Yes $ 1,450,000 $ 1,450,000 $ 142,135 MW‐ESD No Pest Control Yes $ 49,952 $ 49,952 $ 5,960 M‐ESD No Site Security Yes $ 568,038 $ 568,038 $ 267,814
NON No Structural Steel Yes $ 34,842,383 $ 38,732,791 $ 29,581,341 NON No Spray Fireproofing Yes $ 1,361,500 $ 1,361,500 $ 321,192 NON No Misc. Metals Yes $ 3,380,000 $ 3,380,000 $ 1,230,580 NON No Roofing & Waterproofing Yes $ 3,107,892 $ 3,107,892 $ 89,248 NON No Metal Wall Panels Yes $ 4,895,000 $ 4,895,000 $ 386,654 NON No Façade Maintenance Yes $ 1,787,170 $ 1,787,170 $ 225,729 NON No Elevators Yes $ 8,558,816 $ 8,558,816 $ 809,037 NON No Above Grade Plumbing Yes $ 8,619,000 $ 8,536,000 $ 664,356 NON No Pre‐Purchase CRAC Units Yes $ 308,675 $ 308,675 $ 41,671 NON No Pre‐Purchase Indoor AHUs Yes $ 634,418 $ 634,418 $ 146,616 NON No Pre‐Purchase Outdoor AHUs‐DOAs/RTUs Yes $ 4,213,575 $ 4,213,575 $ 3,412,996 NON No Pre‐Purchase Chilled Beams Yes $ 899,812 $ 899,812 $ 121,475 NON No HVAC AG Piping Yes $ 37,300,000 $ 37,300,000 $ 2,116,825 NON No HVAC Site 6B Airside Yes $ 8,350,000 $ 8,350,000 $ 766,938 NON No HVAC Site 7 Airside Yes $ 11,500,000 $ 11,500,000 $ 1,542,625 NON No AG BMS Controls Yes $ 4,655,000 $ 47,792,665 $ 321,790 NON No Pre‐Purchase Electrical Switchgear Yes $ 2,413,235 $ 2,552,235 $ 1,504,264 NON No AG Electrical Yes $ 16,674,277 $ 16,674,277 $ 1,560,959 NON No Hoist & Protection Yes $ 3,010,000 $ 3,010,000 $ 683,598 NON No Early Sitework Yes $ 891,871 $ 891,871 $ 131,869 NON No Ornamental Metals Yes $ 9,290,000 $ 9,290,000 $ 95,482 NON No Ornamental Metals Yes $ 3,961,299 $ 4,153,299 $ 177,025 NON No Overhead Doors Yes $ 650,000 $ 1,055,000 $ 291,203 NON No Light Fixtures Yes $ 3,544,297 $ 3,394,092 $ 1,395,567
$ 199,843,669 $ 247,955,018 $ 53,620,455 $ 24,995,449 $ 25,575,930 $ 6,001,415
Non‐MWL Tier II Total $ 174,848,220 $ 222,379,088 $ 47,619,040 0% 48% 11%
Date: 06/30/2019
Turner Logistics LLCTurner Logistics LLCTurner Logistics LLC
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
MWL % of Tier I
Tier II Grand TotalMWL Tier II Total
FW SimsHeritage MechanicalPJ MechanicalSchneider Electric
Zwicker ElectricTurner Logistics LLC
Safway AtlanticConcrete IndustriesJEM ArchitecturalChampion Metal & GlassPost RoadTurner Logistics LLC
Transel ElevatorAlmar Plumbing
BAMCO Inc.Global BMU, LLC
Infinite Consulting
Island International Enterprises
Allran Electric
Cives Corp
Wolkow Braker
PJP InstallersPestrolJohnson Security Bureau
Turner Logistics LLC
Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:433 Hardware Supplies Inc
NON:
Fairway Market
A & H Co
Sugar Hill CreameryGolden Deli
First Women's Fire SystemsRoger & Sons Concrete Inc
Venus Fire Protection
United Structural Works, Inc
Turner Construction Company
Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction Company Columbia Business School Above GradeConstruction Management375 Hudson Street, 6th Floor, New York, NY 10014 (212) 229-60006/30/2019 In Progress
COMPANY (Tier I)
Name
109
Schedule M3
CM Name:Company Name: Cives Corp Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 34,842,383 $ 38,732,791 $ 29,581,341
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Misc. Steel & Deck Yes $ 600,000 $ 937,521 $ 886,715 W‐ESD No Metals Service Center Yes $ 4,000,000 $ 4,000,000 $ 3,391,770 M‐ESD No Galv'd Screen Wall Fabrication Yes $ 500,000 $ 500,000 $ 45,299
NON No Steel & Deck Erection Yes $ 18,800,000 $ 18,800,000 $ 1,682,141 NON No Stair Supply & Erection Yes $ 2,910,000 $ 2,910,000 $ 494,485
$ 26,810,000 $ 27,147,521 $ 6,500,410 $ 5,100,000 $ 5,437,521 $ 4,323,784
Non‐MWL Tier III Total $ 21,710,000 $ 21,710,000 $ 2,176,626 15% 14% 15%
Date: 06/30/2019
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Berlin Steel Construction Company
Cives Corp Structural Steel
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Commonwealth Metal CoErection & Welding Contractors LLC
NON:South Shore Construction Services
Baco Enterprises Inc
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction CompanyColumbia Business School Above Grade
Structural Steel8 Church Street, Gouverneur, NY 13642 315-287-22006/30/2019 In Progress
COMPANY (Tier II)
110
Schedule M3
CM Name:Company Name: Almar Plumbing & Heating Corp. Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 8,619,000 $ 8,536,000 $ 664,356
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Supplies Yes $ 600,000 $ 600,000 $ 88,190
$ 600,000 $ 600,000 $ 88,190 $ 600,000 $ 600,000 $ 88,190
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 7% 7% 13%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction CompanyColumbia Business School Above Grade
Plumbing
NY Plumbing Wholesale & Supply
50 Bethpage Road, Hicksville, NY 11801 516-740-59006/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Almar Plumbing & Heating Corp. Plumbing
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
NON:
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
111
Schedule M3
CM Name:Company Name: Roger & Sons Concrete, Inc. Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sM No $ 10,887,633 $ 11,383,155 $ 4,441,173
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Rebar Installation Yes $ 1,181,754 $ 1,181,754 $ 107,323 M‐ESD No Concrete Pump Services Yes $ 204,413 $ 204,413 $ 4,016
$ 1,386,167 $ 1,386,167 $ 111,339 $ 1,386,167 $ 1,386,167 $ 111,339
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 13% 12% 3%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction CompanyColumbia Business School Above Grade
Concrete
Tonage Inc
1474 Route 55, LaGrangeville, NY 12540 845-227-60336/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Roger & Sons Concrete, Inc. Concrete
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Precision Concrete
NON:
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
112
Schedule M3
CM Name:Company Name: Transel Elevator Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 8,558,816 $ 8,558,816 $ 809,037
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Elevator Cabs and Entrances Yes $ 775,369 $ 775,369 $ 77,537
$ 775,369 $ 775,369 $ 77,537 $ 775,369 $ 775,369 $ 77,537
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 9% 9% 10%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction CompanyColumbia Business School Above Grade
Elevator
A&D
30-30 47th Ave, LIC, Queens NY 11101 716-609-25046/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Transel Elevator Elevator
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
NON:
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
113
Schedule M3
CM Name:Company Name: Zwicker Electric Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 16,674,277 $ 16,674,277 $ 1,560,959
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M No Fabricator Yes $ 25,000 $ 25,000 $ 1,130 L No Supplier Yes $ 500,000 $ 500,000 $ 8,545 W‐ESD No Supplier Yes $ 30,000 $ 30,000 $ 1,280 L No Supplier Yes $ 20,000 $ 20,000 $ 1,000
$ 575,000 $ 575,000 $ 11,955 $ 575,000 $ 575,000 $ 11,955
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 3% 3% 1%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction CompanyColumbia Business School Above Grade
Electricians
NB Electrical Enclosure Manufacturer
360 Park Ave South 212-477-84006/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Zwicker Electric Electricians
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
BenfieldCassone Leasing IncSunbelt Rentals
NON:
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
114
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ ‐ $ 95,179 $ 95,179
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
WL‐ESD No General Contractor Yes $ ‐ $ 86,326 $ 86,326
NON No AV/Cable/Telecom Yes $ ‐ $ 7,500 $ 7,500 NON No Electrical Yes $ ‐ $ 1,353 $ 1,353
$ ‐ $ 95,179 $ 95,179 $ ‐ $ 86,326 $ 86,326
Non‐MWL Direct Spend Total $ ‐ $ 8,853 $ 8,853 0% 91% 91%
Date: 06/30/2019MWL % of Total
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Mamais Contracting Corp
NON:Construction Documentation of NYC LLCDal Electrical Corp
Columbia University Owner
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Columbia Business School Below Grade410 West 118th Street, NY, NY 100276/30/2019 In Progress
OWNER
Name Trade
115
Schedule M1
Owner Name: Project:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ ‐ $ 16,513,061 $ 16,513,061
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
NON No Construction Management Yes $ ‐ $ 16,513,061 $ 16,513,061
$ ‐ $ 16,513,061 $ 16,513,061 $ ‐ $ ‐ $ ‐
Non‐MWL Direct Spend Total $ ‐ $ 16,513,061 $ 16,513,061 0% 0% 0%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Direct Spend Grand TotalMWL Direct Spend Total
MWL % of Total
6/30/2019 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:Turner Construction Company
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Columbia Business School Below Grade
116
Schedule M2
Company Name: Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ ‐ $ 16,513,061 $ 16,513,061
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
L No Office Supplies Yes $ ‐ $ 17 $ 17 L No Miscellanous Expenses Yes $ ‐ $ 930 $ 941 L No Miscellanous Expenses Yes $ ‐ $ 71 $ 71 L No Miscellanous Expenses Yes $ ‐ $ 16 $ 16 MW‐ESD No Office Supplies Yes $ ‐ $ 14,755 $ 14,755 MW No Safety Supplies Yes $ ‐ $ 1,600 $ 1,600 W‐ESD No Fire Protection Yes $ 2,768,600 $ 2,768,600 $ 800,058 M No Concrete Yes $ 3,739,879 $ 6,410,907 $ 3,709,694 M‐ESD No Fire Alarm Yes $ 3,082,854 $ 3,082,854 $ 236,454 M No Doors Yes $ 322,000 $ 322,000 $ 47,324 M‐ESD No Site Safety Yes $ 84,120 $ 84,120 $ 11,736 MW‐ESD No Pest Control Yes $ 21,408 $ 21,408 $ 1,840
NON No Spray Fireproofing Yes $ 1,138,500 $ 1,138,500 $ 885,461 NON No Roofing & Waterproofing Yes $ 2,377,108 $ 2,377,108 $ 137,700 NON No Elevator Yes $ 596,900 $ 596,900 $ 25,035 NON No Plumbing Yes $ 6,600,000 $ 6,600,000 $ 1,615,501 NON No HVAC Wetside Yes $ 9,344,124 $ 9,344,124 $ 2,291,564 NON No HVAC Airside Yes $ 5,350,000 $ 5,350,000 $ 1,035,106 NON No Pre‐Purchase Electrical Switchgear Yes $ 3,392,505 $ 3,462,115 $ 2,154,128 NON No Pre‐Purchase Indoor AHU's Yes $ 582,706 $ 582,706 $ 471,992 NON No Pre‐Purchase CRAC Units Yes $ 534,039 $ 534,039 $ 72,095 NON No BMS Controls Yes $ 1,475,000 $ 1,480,720 $ 88,793 NON No Electrical Yes $ 15,320,723 $ 15,320,723 $ 1,059,915 NON No Masonry Yes $ 6,200,000 $ 5,660,002 $ 2,561,553 NON No Misc. Metal Yes $ 1,450,000 $ 1,450,000 $ 195,240 NON No Ornamental Metals Yes $ 38,700 $ 38,700 $ 2,036 NON No Light Fixtures Yes $ 352,485 $ 367,485 $ 158,618
$ 64,771,651 $ 67,010,400 $ 17,579,243 $ 10,018,861 $ 12,707,278 $ 4,824,506
Non‐MWL Tier II Total $ 54,752,790 $ 54,303,122 $ 12,754,737 0% 77% 29%
Date: 06/30/2019
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier II Grand TotalMWL Tier II Total
MWL % of Tier I
Turner Logistics LLCSchneider ElectricZwicker ElectricRad & D'AprilePost RoadChampion Metal & GlassTurner Logistics LLC
Turner Logistics LLC
Island International EnterprisesWolkow BrakerTransel Elevator & ElectricAlmar PlumbingPJ MechanicalHeritage MechanicalTurner Logistics LLC
433 Hardware Supplies IncFairway Market
A & H Co
NON:
Sugar Hill CreameryGolden Deli
First Women's Fire SystemsRoger & Sons Concrete IncAllran Electric
Venus Fire Protection
Park AveInfinite ConsultingPestrol
Turner Construction Company Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction Company Columbia Business School Below GradeConstruction Management375 Hudson Street, 6th Floor, New York, NY 10014 (212) 229-60006/30/2019 In Progress
COMPANY (Tier I)
117
Schedule M3
CM Name:Company Name: Island International Enterprises, LLC Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 1,138,500 $ 1,138,500 $ 885,461
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
W‐ESD No Labor Supplier Yes $ 190,000 $ 194,000 $ 40,946 W‐ESD No Supplies Yes $ 14,000 $ 14,000 $ 2,404 W‐ESD No Fuel Supplier Yes $ 4,000 $ 5,542 $ 5,542
$ 208,000 $ 213,542 $ 48,892 $ 208,000 $ 213,542 $ 48,892
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 18% 19% 6%
Date: 06/30/2019
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction CompanyColumbia Business School Below Grade
Spray Fireproofing1101 Scott Avenue, Calverton NY 11933 631-208-35006/30/2019 In Progress
COMPANY (Tier II)
Island International Enterprises, LLC Spray Fireproofing
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:Pristine Services incHighway Safety Protection CorpNaughton Energy Corp
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
118
Schedule M3
CM Name:Company Name: Roger & Sons Concrete, Inc. Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sM No $ 3,739,879 $ 6,410,907 $ 3,709,694
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Rebar Installation Yes $ 515,987 $ 515,987 $ 19,223 M‐ESD No Concrete Pump Services Yes $ 10,000 $ 11,070 $ 11,070
$ 525,987 $ 527,057 $ 30,293 $ 525,987 $ 527,057 $ 30,293
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 14% 8% 1%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction CompanyColumbia Business School Below Grade
Concrete
Tonage Inc
1474 Route 55, LaGrangeville, NY 12540 845-227-60336/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Roger & Sons Concrete, Inc. Concrete
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Precision Concrete
NON:
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
119
Schedule M3
CM Name:Company Name: Transel Elevator Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 596,900 $ 596,900 $ 25,035
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M‐ESD No Elevator Cabs and Entrances Yes $ 58,361 $ 58,361 $ 5,836
$ 58,361 $ 58,361 $ 5,836 $ 58,361 $ 58,361 $ 5,836
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 10% 10% 23%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction CompanyColumbia Business School Below Grade
Elevator
A&D
30-30 47th Ave, LIC, Queens NY 11101 716-609-25046/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Transel Elevator Elevator
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
NON:
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
120
Schedule M3
CM Name:Company Name: Zwicker Electric Project:Trade: Contract:Address: Telephone:As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'sNON No $ 16,674,277 $ 16,674,277 $ 1,560,959
MWL Designation Joint Venture? Trade Awarded? Original Plan Amount $'s
Current Plan Amount (incl CO's)
$'s
Total Payment to Date
$'s
M No Fabricator Yes $ 25,000 $ 25,000 $ 1,130 L No Supplier Yes $ 500,000 $ 500,000 $ 8,545 W‐ESD No Supplier Yes $ 30,000 $ 30,000 $ 1,280 L No Supplier Yes $ 20,000 $ 20,000 $ 1,000
$ 575,000 $ 575,000 $ 11,955 $ 575,000 $ 575,000 $ 11,955
Non‐MWL Tier III Total $ ‐ $ ‐ $ ‐ 3% 3% 1%
Date: 06/30/2019
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction CompanyColumbia Business School Below Grade
Electricians
NB Electrical Enclosure Manufacturer
360 Park Ave South 212-477-84006/30/2019 In Progress
COMPANY (Tier II)
Name Trade
Zwicker Electric Electricians
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
BenfieldCassone Leasing IncSunbelt Rentals
NON:
If there is no Original Plan then vendors were paid on an as‐needed basis or vendors were contracted after the Original Plan
Tier III Grand TotalMWL Tier III Total
MWL % of Tier II
121
GC/CM: Turner Construction Company
Date Range: 8/1/2008 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Turner Construction Company 3,523 45% 33 0% 0 0% 8 0% 72 1% 0 0% 1,284 16% 4,919 63% 2,875 37% 7,794 24 60% 16 40% 40Construction Management
* Tier II Almar Plumbing 1,671 16% 0 0% 0 0% 1,099 11% 0 0% 0 0% 0 0% 2,770 27% 7,628 73% 10,398 11 37% 19 63% 30Plumbing
* Cives Steel Company 18,029 24% 0 0% 0 0% 0 0% 161 0% 0 0% 0 0% 18,190 24% 58,006 76% 76,196 41 29% 99 71% 140Structural Steel
* Island International Enterprises 4,894 87% 0 0% 0 0% 0 0% 550 10% 0 0% 0 0% 5,444 97% 192 3% 5,636 19 83% 4 17% 23SOFP
* Roger & Sons 17,499 42% 8 0% 12 0% 8 0% 482 1% 0 0% 143 0% 18,152 44% 23,180 56% 41,331 108 42% 149 58% 257Concrete
* Safway Atlantic 2,045 45% 0 0% 0 0% 0 0% 40 1% 0 0% 0 0% 2,085 46% 2,466 54% 4,550 46 48% 49 52% 95Hoisting & Public Protection
* Zwicker Electric Company 477 7% 0 0% 0 0% 0 0% 227 3% 0 0% 0 0% 704 10% 6,132 90% 6,836 4 22% 14 78% 18Electrical
* First Women's Fire Systems 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 3,002 100% 3,002 0 0% 4 100% 4Fire Protection
* United Structural Works 3,216 39% 0 0% 106 1% 0 0% 0 0% 0 0% 0 0% 3,322 40% 4,938 60% 8,259 10 40% 15 60% 25Misc. Metals
* Wolklow Braker 211 36% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 211 36% 376 64% 587 4 31% 9 69% 13Roofing & Waterproofing
* F.W. Sims 33 1% 0 0% 8 0% 0 0% 0 0% 0 0% 0 0% 41 2% 2,354 98% 2,395 2 10% 19 90% 21HVAC AG PipingPJP Installers Inc 304 97% 0 0% 0 0% 0 0% 8 3% 0 0% 0 0% 312 100% 0 0% 312 9 100% 0 0% 9HVAC Site 7 AirsidePost Road Iron Works 8 22% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 8 22% 29 78% 37 1 25% 3 75% 4Overhead DoorsRad & D’Aprile 3,765 50% 0 0% 0 0% 0 0% 64 1% 0 0% 0 0% 3,829 51% 3,730 49% 7,559 30 49% 31 51% 61MasonryHeritage Mechanical 577 61% 0 0% 0 0% 0 0% 55 6% 0 0% 0 0% 632 67% 312 33% 944 8 80% 2 20% 10HVACAllran Electric 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 8 100% 8 0 0% 1 100% 1Fire AlarmPJ Mechanical 265 51% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 265 51% 255 49% 520 5 63% 3 38% 8HVACCurtis Partition 1,638 58% 248 9% 0 0% 0 0% 0 0% 0 0% 0 0% 1,886 67% 939 33% 2,824 16 67% 8 33% 24Drywall
* Concrete Industries 60 18% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 60 18% 268 82% 328 1 17% 5 83% 6Early Sitework
58,212 289 126 1,115 1,659 0 1,427 62,826 116,687 179,513 339 450 78932% 0% 0% 1% 1% 0% 1% 35% 65% 100% 43% 57% 100%
Contractor Start Almar Plumbing 6/19/2018Cives Steel Company 11/25/2018Island International Enterprises 12/25/2018Roger & Sons 10/16/2018Safway Atlantic 10/17/2018Zwicker Electric Company 12/26/2018First Women's Fire Systems 12/25/2018United Structural Works 1/6/2019Wolklow Braker 2/27/2019F.W. Sims 3/5/2019PJP Installers Inc 3/17/2019Post Road Iron Works 6/8/2019Rad & D’Aprile 4/9/2019Heritage Mechanical 6/5/2019Allran Electric 6/26/2019PJ Mechanical 5/8/2019Curtis Partition 5/12/2019Concrete Industries 4/16/2019
In Progress
In Progress
Columbia Business SchoolSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
In Progress
Total MWL Non-MWL
* Denotes active contractors
In ProgressIn Progress
Total HoursOverall % of Total
In Progress
In Progress
Non-MWL Total MWL
In ProgressIn ProgressIn Progress
EndIn Progress
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
In ProgressIn Progress
In ProgressIn ProgressIn ProgressIn ProgressIn Progress
122
GC/CM: Turner Construction Company
Date Range: 4/1/2019 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Turner Construction Company 2,219 48% 15 0% 0 0% 8 0% 72 2% 0 0% 652 14% 2,965 65% 1,617 35% 4,582 17 68% 8 32% 25Construction Management
* Tier II Almar Plumbing 991 22% 0 0% 0 0% 840 19% 0 0% 0 0% 0 0% 1,831 41% 2,618 59% 4,449 8 42% 11 58% 19Plumbing
* Cives Steel Company 9,984 23% 0 0% 0 0% 0 0% 161 0% 0 0% 0 0% 10,145 24% 32,913 76% 43,058 31 29% 77 71% 108Structural Steel
* Island International Enterprises 3,206 89% 0 0% 0 0% 0 0% 384 11% 0 0% 0 0% 3,590 99% 24 1% 3,614 14 93% 1 7% 15SOFP
* Roger & Sons 11,815 42% 0 0% 0 0% 0 0% 345 1% 0 0% 135 0% 12,295 44% 15,603 56% 27,898 84 46% 97 54% 181Concrete
* Safway Atlantic 532 29% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 532 29% 1,277 71% 1,808 23 43% 31 57% 54Hoisting & Public Protection
* Zwicker Electric Company 477 13% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 477 13% 3,197 87% 3,674 3 21% 11 79% 14Electrical
* First Women's Fire Systems 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 2,002 100% 2,002 0 0% 4 100% 4Fire Protection
* United Structural Works 2,038 39% 0 0% 106 2% 0 0% 0 0% 0 0% 0 0% 2,144 41% 3,026 59% 5,169 7 39% 11 61% 18Misc. Metals
* Wolklow Braker 168 35% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 168 35% 311 65% 479 4 36% 7 64% 11Roofing & Waterproofing
* F.W. Sims 33 2% 0 0% 8 0% 0 0% 0 0% 0 0% 0 0% 41 2% 2,065 98% 2,106 2 11% 17 89% 19HVAC AG PipingPJP Installers Inc 200 96% 0 0% 0 0% 0 0% 8 4% 0 0% 0 0% 208 100% 0 0% 208 9 100% 0 0% 9HVAC Site 7 AirsidePost Road Iron Works 8 22% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 8 22% 29 78% 37 1 25% 3 75% 4Overhead DoorsRad & D’Aprile 3,765 50% 0 0% 0 0% 0 0% 64 1% 0 0% 0 0% 3,829 51% 3,730 49% 7,559 30 49% 31 51% 61MasonryHeritage Mechanical 577 61% 0 0% 0 0% 0 0% 55 6% 0 0% 0 0% 632 67% 312 33% 944 8 80% 2 20% 10HVACAllran Electric 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 8 100% 8 0 0% 1 100% 1Fire AlarmPJ Mechanical 265 51% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 265 51% 255 49% 520 5 63% 3 38% 8HVACCurtis Partition 1,638 58% 248 9% 0 0% 0 0% 0 0% 0 0% 0 0% 1,886 67% 939 33% 2,824 16 67% 8 33% 24Drywall
* Concrete Industries 60 18% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 60 18% 268 82% 328 1 17% 5 83% 6Early Sitework
37,973 263 114 848 1,089 0 787 41,072 70,192 111,264 263 328 59134% 0% 0% 1% 1% 0% 1% 37% 63% 100% 45% 55% 100%
Columbia Business SchoolSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
* Denotes active contractors1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total HoursOverall % of Total
123
Shared Services
124
GC/CM: Lend Lease
Date Range: 8/1/2008 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 92,640 32% 2,939 1% 13,996 5% 19,956 7% 49,345 17% 0 0% 2,537 1% 181,413 63% 107,940 37% 289,353 133 42% 182 58% 315Construction Management
* Tier II Johnson Security Inc 152,969 60% 0 0% 2,042 1% 31,652 12% 54,836 21% 0 0% 11,142 4% 252,642 99% 3,084 1% 255,726 300 97% 8 3% 308Security
* Eddington Security Inc 110,679 76% 0 0% 0 0% 304 0% 35,032 24% 0 0% 0 0% 146,015 100% 8 0% 146,023 167 99% 1 1% 168Security
356,289 2,939 16,038 51,912 139,213 0 13,679 580,070 111,032 691,102 600 191 79152% 0% 2% 8% 20% 0% 2% 84% 16% 100% 76% 24% 100%
Contractor Start Johnson Security Inc 7/11/2010Eddington Security Inc 2/4/2010
Overall % of Total
Shared ServicesSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
In Progress
Total Hours
* Denotes active contractors1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
EndIn Progress
125
GC/CM: Lend Lease
Date Range: 4/1/2019 - 6/30/2019As of : 9/10/2019
Tier Contractor Total Hours TotalHrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Construction Management
* Tier II Johnson Security Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Security
* Eddington Security Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0Security
0 0 0 0 0 0 0 0 0 0 0 0 00% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Shared ServicesSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total HoursOverall % of Total
* Denotes active contractors
126