Land Information System Brief Presentation on the Technical Guidelines/ Methodology for...

Post on 30-Dec-2015

218 views 4 download

Tags:

Transcript of Land Information System Brief Presentation on the Technical Guidelines/ Methodology for...

Land Information SystemBrief Presentation on the Technical Guidelines/

Methodology for Implementation of The National Land Records Modernization Programme

(NLRMP)

1

Pan India Consultants Pvt Ltd ( An ISO 9001 : 2000 Certified Company )

04/19/23 Confidential www.panindiagroup.com

Importance of cadastral records and land information systemsAccess and use of land are fundamental to life as we know it... Food,

fiber, habitation, recreation, and so forth. Land parcel is the basic unit for access and control of land, land use decisions.

Current, reliable land information necessary for many public programs, for example:

land planning infrastructure development and maintenance environmental protection and resource management services social service programs and so forth

basis for land markets, development, and other economic activity

PIC

204/19/23 Confidential www.panindiagroup.com

3

•Govt. of India has decided to implement the Centrally- Sponsored scheme in the shape of National Land Records Modernization Programme (NLRMP).

•The major component of NLRMP are : Computerization of Land Records, Integration of spatial &

non- spatial/textual information. Strengthening of Revenue Administrations and updating of

Land Records(SRA & ULR). Establishment of modern record rooms/ Land Record

Management centers at Tehsil/Revenue Circle/District level

04/19/23 Confidential www.panindiagroup.com

PIC

4

Geographical Information System (GIS) and Land Records?

Relating "legal" description of property to coordinate-based systems

To highlight / & then minimize ambiguous or overlapping boundaries

Complex attribute relations

Finally access to public

04/19/23 Confidential www.panindiagroup.com

PIC

Concept for a Multipurpose LIS PIC

504/19/23 Confidential www.panindiagroup.com

DIGITISATION & GEO-REFRENCING and linking of RoR data

ofVILLAGE CADASTRAL MAPS

PIC

604/19/23 Confidential www.panindiagroup.com

Process

•Collecting hardcopy maps/sheets from the concerned Land Record Department•Indexing & Coding•Scanning of Village/Cadastral map sheets

•Grid base generation or•Map grid generation•Grid correction of Cadastral images

•Digitization of individual scanned Village map sheets(grid corrected)•Edge Matching and Mosaicing up to Village Level•Cleanup and topology building•Quality Control/Checks- Rectify errors•Data Translation-GIS environment•Georeferencing of individual villages, mosaicing up to tehsil/district/state level•Quality assurance•Final deliverables

PIC

704/19/23 Confidential www.panindiagroup.com

Abbreviation Description

S State codeD District codeT Tahsil code

A/B Anchal/ block codeP Gram panchayat codeR Revenue circle codeH Halka codeV Village code in 2001 censusW Ward codeN Sheet no.

Indexing & Coding and Scanning of Input MapsFor scanned output *.tif will be coded as per Census 1991/2001

(DDTTRRHHHVVVnn) as refer in Table: Coding and Indexing.

PIC

804/19/23 Confidential www.panindiagroup.com

04/19/23 Confidential www.panindiagroup.com

9

PIC

04/19/23 Confidential www.panindiagroup.com

10

PIC

04/19/23 Confidential www.panindiagroup.com

11

PIC

PIC

1204/19/23 Confidential www.panindiagroup.com

PIC

1304/19/23 Confidential www.panindiagroup.com

Scanning

14

PIC

04/19/23 Confidential www.panindiagroup.com

Approach to generate true Replica of Input Maps

15

PIC

04/19/23 Confidential www.panindiagroup.com

Process to rectified scanned maps

16

A rectangle (vector) of known dimensions with 9 reference points created.

Grid used to minimize scanning distortion/input errors

PIC

04/19/23 Confidential www.panindiagroup.com

SCANNING PROCESSBefore proceeding for scanning we marked/transfer 9 reference points on each individual map sheets.

Context Scanner 6300

SHEET WISE SCANNED OUTPUT OF CADASTRAL MAP

ekSt+k % MqUMhx<+k

PIC

04/19/23 Confidential www.panindiagroup.com

18

PIC

Grid overlaid on the scanned Cadastral Map

19

PIC

04/19/23 Confidential www.panindiagroup.com

Rectified scanned map with overlaid grid

20

PIC

04/19/23 Confidential www.panindiagroup.com

Alternate Approach followed for scanning of

Input Maps

21

PIC

04/19/23 Confidential www.panindiagroup.com

Sheet wise scanned output of Cadastral Maps of a VillagePIC

2204/19/23 Confidential www.panindiagroup.com

Grid used to minimize scanning distortion/input errorsPIC

23Grid 1:1

04/19/23 Confidential www.panindiagroup.com

Grid overlaid on Cadastral Map

Distortion in Original grid lines of cadastral map with overlaid vector grid

PIC

2404/19/23 Confidential www.panindiagroup.com

Grid overlaid on Cadastral Map

Distortion minimized in scanned Cadastral maps using vector grid

PIC

2504/19/23 Confidential www.panindiagroup.com

Rectified/Un-rectified scanned maps –A Comparison

Rectified scanned map with overlaid grid

Un-rectified scanned map with overlaid grid

PIC

2604/19/23 Confidential www.panindiagroup.com

DIGITIZATION

27

PIC

04/19/23 Confidential www.panindiagroup.com

Concept for aMultipurpose Land Information System

PIC

2804/19/23 Confidential www.panindiagroup.com

Concept for aMultipurpose Land Information System

29

Different layers created for different features (poly/line/point etc.) keeping in mind their usage in the GIS data base

LIS- STANDERDS.DOC

PIC

04/19/23 Confidential www.panindiagroup.com

Standard Template & Legend

30

PIC

04/19/23 Confidential www.panindiagroup.com

Digitized output of the cadastral map { ekSt+k % MqUMhx<+k }

PIC

Final Digitized output with Legend

Enlarged View of Legend showing different layers

PIC

3204/19/23 Confidential www.panindiagroup.com

Different sheets mosaiced at Village level

PIC

3304/19/23 Confidential www.panindiagroup.com

Customize QC routine

PIC

35

Check print of the cadastral map { ekSt+k % MqUMhx<+k }

PIC

04/19/23 Confidential www.panindiagroup.com

ekSt+k % MqUMhx<+k with error report

PIC

Digitized out put(1:1 matching)

04/19/23 Confidential www.panindiagroup.com

37

Digitization using dimensions

04/19/23 Confidential www.panindiagroup.com

38

Enlarge view of map generated using dimensions

04/19/23 Confidential www.panindiagroup.com

39

Shift in features

Now the digitized output is ready for:

• Processing of digitized data to generate the out put as per the guidelines/specifications provided by LRD.

• Check plot generation for verification with original input map.

• Incorporation of errors/feedback or other remarks of first QC

• Finalization of data & composition of final map.

40

PIC

04/19/23 Confidential www.panindiagroup.com

Data Translation and linking with RoR data

The data would be converted from AutoCAD to Arc coverage/shape & Geo database by using data migration tools/customized routines/programme etc. These tools will be designed as per the LRD Specifications.

•The list of records/files will be verified to make sure that all the data is converted successfully. As soon as the migration is finished, the created error logs would be fixed. Also check the completeness of the data translation through internally developed software routines.

•These routines would ensure that all the features are translated by comparing the source and the target data. After the successful completion of the migration process, it can be noted that all the data is present in the geo-database without losing any information.

Feature coding for polygons/lines & points features i.e. preparation of coding scheme for different features present in maps, generation of code for whole tehsil and structure for respective backup table will be built strictly as per NIC/LRD requirement/guidelines for linking of RoR.

PIC

4104/19/23 Confidential www.panindiagroup.com

Sample output of RRSSC- Chattisgargh Project

04/19/23 Confidential www.panindiagroup.com

42

Sample from H.P. Land Records

04/19/23 Confidential www.panindiagroup.com

43

Sample from Orissa Land Records

04/19/23 Confidential www.panindiagroup.com

44

Quality Assurance•Verification of naming conventions , scanning, digitization, topological correctness, unique feature coding, completeness of data, accuracy and RMS errors will be checked.•Verification of positional accuracy, attribute accuracy, logical consistency, completeness, edge matching and Mosaicing will also be verified at village and then at tehsil level.•Quality Criteria will be as given below:

•Directory/folder structure: 100%•File naming convention: 100%•Data readability: 100%•Data structure: 100%•Data format: 100%•Topology: 99%•Attribute correctness: 98%•Attribute completeness: 98%•Meta data of each stage deliverables 98%

PIC

4504/19/23 Confidential www.panindiagroup.com

Unprojected output of the cadastral map { ekSt+k % MqUMhx<+k } with Attributes

PIC

47

Projected output of the cadastral map { ekSt+k % MqUMhx<+k } overlaid on QB Data

PIC

04/19/23 Confidential www.panindiagroup.com

48

Feature wise thematic map of NAMKUM block

PIC

04/19/23 Confidential www.panindiagroup.com

49

Village Thematic Map of NAMKUM Block

PIC

04/19/23 Confidential www.panindiagroup.com

Metadata format for final prints

PIC

51

Digitized output of the cadastral map

Enlarged view of legend showing different layers04/19/23 Confidential

www.panindiagroup.com

PIC

Following different clipped parts used for the final

composition of map

5204/19/23 Confidential www.panindiagroup.com

PIC

5304/19/23 Confidential www.panindiagroup.com

PIC

Input Village Map

5404/19/23 Confidential www.panindiagroup.com

PIC

5504/19/23 Confidential www.panindiagroup.com

PIC

5604/19/23 Confidential www.panindiagroup.com

PIC

Geo-referenced output of digitized revenue map

5704/19/23 Confidential www.panindiagroup.com

PIC

Thank You for being Patient

58

Quality Is Not anOvernight Affair- Philip Crosby

Krishan dev Sood

04/19/23 Confidential www.panindiagroup.com