KX/ISA&G Requirements for EAS Jettison

Post on 09-Jan-2016

49 views 1 download

Tags:

description

KX/ISA&G Requirements for EAS Jettison. Sean Keefe x38215, Val Papanyan x35144 Donn Liddle x 39355, Ed Oshel x35335 Image Science & Analysis Group KX/ISA&G January 23, 2007. http://isag.jsc.nasa.gov. Topics for Discussion:. - PowerPoint PPT Presentation

Transcript of KX/ISA&G Requirements for EAS Jettison

KX/ISA&G Requirements for EAS Jettison

Sean Keefe x38215, Val Papanyan x35144 Donn Liddle x 39355, Ed Oshel x35335

Image Science & Analysis GroupImage Science & Analysis Group

KX/ISA&G January 23, 2007

http://isag.jsc.nasa.gov

Topics for Discussion:

• Recent changes to EAS Jettison position & SSRMS joint angles & required camera viws for jettison analysis (S. Keefe)

• EAS Jettison Lighting Requirements (S. Keefe & V. Papanyan)

• Results of internal EAS Jettison sim (V. Papanyan & E. Oshel) KX/ISA&G

• EAS Jettison: turn around time and expected accuracy of analysis (V. Papanyan)

• Golf ball jettison results (V. Papanyan)