Post on 31-Jan-2016
description
KM
28
4.0
00
KM
28
6.5
00
KM
29
1.7
60
KM
29
4.8
34
KM
29
5.0
00
KM
29
6.2
50
Km 296.50 to Km 297.96
KM
30
0.4
00
KM
30
2.5
00
KM
30
6.8
82
KM
31
0.6
30
KM
31
3.0
82
KM
31
7.7
82
.
KM
32
3.2
07
Km 326.754 to Km 325.460
KM
32
8.7
17
KM
33
3.5
72
K
M 3
34
.00
0K
M 3
34
.50
7
KM
34
1.0
00
KM
34
5.9
32
Tail
end
Br.
canal
DB
M 5
4
KM
13
.50
KM
2
KM
3
KM
13
.00
KM
16
.00
KM
71
.00
KM 55.00
KM 34.4
KM 20
KM
5
KM
5
KM
4
KM
4
KM
4
KM
39
.00
KM
9
KM
72
.00
KM 40
KM 20
DB
M 5
5
DB
M 5
6
DB
M 5
7
DB
M 5
9
DB
M 6
0
DB
M 6
1
DB
M 6
2
DB
M 6
3
DB
M 6
7
DB
M 6
8
DB
M 6
9
DB
M 7
0
DB
M 7
1
15,0
00 A
c
618
Ac
496
Ac
102
49
Ac
109
96
Ac
129
45
0 A
c
384
1 A
c.
407
1 A
c.
129
7 A
c
773
Ac
808
Ac
560
69
Ac
717
3 A
c
162
94
3 A
c
Infa
ll R
eg
ula
tor
MYLARAM B. R
ou
tfall R
eg
ula
tor
Package 3 EWE & FE of minors & sub-minors & FCs from KM 45 to 71 of DBM-60
Package 2 EWE & FE of minors & sub-minors & FCs from KM 0 to 45 of DBM-60
Package 1 CC lining of Kakatiya canal from KM 284 to 346
BA
YA
NN
AV
AG
U
B.R
Package 4 EWE & FE of dbm-69 FROM km 0 TO 39 including main, minors & sub-minors & FCs
Package7 EWE & FE of 38L to 77L of DBM-71 from km 40 to 72 main, minors & sub-minors & FCs
Package6 EWE & FE of 23R to 37L of DBM-71 from km 32 to 40 main, minors & sub-minors & FCs
Package5 EWE & FE of 1R to 22L of DBM-71 from km 0 to 32 main, minors & sub-minors & FCs
Works Completed
Works under execution
EPC works
WARANGAL (1,13,578 Ac.)
NALGONDA (2,57,508 Ac.)
KHAMMAM (68,914 Ac.)
SRI RAMA SAGAR PROJECT STAGE-II
1 Project Profile : Excavation of Kakatiya canal from 284 KM to 346 KM (62 KM) including Main canal lining CM & CD works, distributaries, field channels etc.
2 Administrative Sanction :G. O. Ms. No. 88, I & CAD, Dt: 11-07-2005 for Rs. 830.75 Crores
3 No. of EPC Packages : 7 No.
4 Agt. Value of 7 Pkgs : Rs. 427.37 Crs.
5 Budget Provision for 2006-07 : Rs. 265 Crs.
6 Expenditure of the Project
Old ongoing works upto 2004 : Rs. 133.62 Crs.
2004-05 : Rs. 21.37 Crs.
2005-06 : Rs. 167.47 Crs.
TOTAL : Rs. 321.46 Crs.
7 Utilisation : 24.405 TMC
8 Ayacut New Ayacut : 4,40,000 acres
Stabilisation : --
SRI RAMA SAGAR PROJECT STAGE-II
9 Land Acquisition
Required : 19,313 acres
Acquired : 5924 acres
Requisitioned : 4948 acres
10 Est. Cost for LA : Rs. 118 Crores
11 Est. Cost for R & R : Rs. 2 Crores
12 Clearances :All CWC clearances including investment clearance obtained
13 Mobilisation Advance : PaidRecovered
2004-05 : Rs. 21.37 Crs. --
2005-06 : Rs.3.65 Crs. Rs.8.88 Crs.
Total : Rs.25.02 Crs. Rs.8.88Crs.
14 Target date for completion : 9/2007
SRI RAMA SAGAR PROJECT STAGE-II
PKG No.
Description AwardedBid AmountRs. in Crs.
52SRSP Stage.II - Lining of Kakatiya Main Canal from Km.284.00 to 346.00
Sri K.Sudarshan Reddy & K.Venkateshwarlu & Co.(JV) 58.37
53Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of DBM-60 Distributory from Km.0.00 to Km.45.00
Ms R.M.Mohite & Co.,Bhoorathnam & Co., 62.15
54Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of DBM-60 Distributory from Km.45.00 to Km.71.00
M/s Rani Constructions 60.90
55Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of DBM-69 Distributory
M/s AKR-COASTAL 72.99
56Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of BM-71 Distributory from Km.0.00 to Km.32.00
M/s Ramky Infrastructure & Mr.V.Satya Murthy 72.00
57Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of BM-71 Distributory from Km.32.00 to Km.40.00
M/s Ramky Infrastructure & Mr.V.Satya Murthy 55.35
58Investigation, Designing, Estimating, E.W.E & F.E construction of CM&CD works of Majors, Minors, Sub-Minors & Field Channels of BM-71 Distributory from Km.40.00 to Km.72.00
M/s Rani Constructions 45.61
TOTAL 427.37
CATEGORY-II
SRI RAMA SAGAR PROJECT STAGE-II
Package No. 52/Cat-II : CC Lining in bed and sides of Kakatiya main canal from Km 284.00 to KM 346.00
SRSP - II
Name of the Contractor : M/s K. Sudhrashan Reddy &
M/s K. Venkateshwarlu & Co.(JV)
Agreement Amount : Rs. 58.37Crs.
Agreement Date : 11-03-2005
Period of Completion : 24 Months (8 milestones)
Date of completion : 11-03-2007
Investigation : KM 56 completed against 56 KM – Completed
Execution : Lining in good progress for entire length of 56 KM
Expenditure : Rs. 38.56 Crs. against Rs. 58.37 Crs. (including
Mob.Adv. of Rs.2.92Crs.)
Mob. Adv. Recovered : Rs. 2.92 Crores.
Package No. 53/Cat-II : DBM-60
distributory from KM 0.00 to KM
45.00 earth work excavation and
forming embankment, construction
of CM & CD works of Major & Minor.
SRSP - IIName of the Contractor : M/s R.M. Mohite & Bhooratnam
& Co.
Agreement Amount : Rs. 62.15 Crs.
Agreement Date : 07-03-2005
Period of Completion : 30 Months (10 milestones)
Date of completion : 07-09-2007
Investigation : KM 48 completed against 322 KM length
Designs : KM 48 approved against 322 KM of length
Execution : In slow progress due to land
acquisition
Expenditure : Rs. 3.70 Crs. against Rs. 62.15 Crs.
Land Acquisition : Required : 2127 Acres, Requisitioned : 149 Acres
Package No. 54/Cat-II : DBM-60
distributory from KM 45.00 to KM
71.00
SRSP - II
Name of the Contractor : M/s Rani Constructions
Agreement Amount : Rs. 60.90 Crs.
Agreement Date : 09-03-2005
Period of Completion : 30 Months (10 milestones)
Date of completion : 09-09-2007
Investigation : KM 42 completed against 278 KM of length
Designs : KM 42 against 278 KM of length
Execution : Excavation in progress in 3 KM length against total
length of 278 KM
Expenditure : Rs.3.84Crs. against Rs. 60.90 Crs. (in. MA of
Rs.3.04Crores)
Land Acquisition : Required 1500 Acres, Requisitioned : 214Acres.
Bottlenecks : Land Acquisition
Package No. 55/Cat-II : DBM-69 Main
and minors, sub minors & field
channels
SRSP - II
Name of the Contractor : M/s AKR – COASTAL
Agreement Amount : Rs. 72.99 Crs.
Agreement Date : 11-3-2005
Period of Completion : 30 Months (10 milestones)
Date of completion : 11-09-2007
Investigation : KM 27 completed against 125 KM of length
Designs : KM 27 approved against 125 KM of length
Execution : In good progress in the entire length of 125
Km
Expenditure : Rs. 28.43 Crs. against Rs. 72.99 Crs. (inc.
MA of Rs.7.30Crs.)
Mob. Adv. Recovered : Rs. 3.65 Crores.
Land Acquisition : Required 2880Acres, Requisitioned: 262 Acres
Package No. 56/Cat-II : DBM-71
distributary from Km 0.00 to Km
32.00
i) Earthwork excavation and forming
embankment.
ii) Construction of CM & CD works
iii) Investigation, design and estimation of
distributary system
iv) Distributaries Majors, Minors, sub-minors
and field channels of DBM-71 Branch
canal
SRSP - II
Name of the Contractor : M/s Ramky Infra
Structures &
V. Satyamurthy
Agreement Amount : Rs. 72.00 Crs.
Agreement Date : 06-3-2005
Period of Completion : 30 Months (10 milestones)
Date of completion : 06-09-2007
Investigation : Completed
Designs : Approved
Execution : Excavation in progress in 16 KM length against
total length of 96 Km
Expenditure : Rs. 15.00 Crs. against Rs. 72.00 Crs.(inc.
Mob.Adv. of Rs.3.60Crs)
Mob. Advance recovered : Rs. 1.26 Crores.
Land Acquisition : Required 2065 Acres, Requisitioned : 1345 Acres.
Package No. 57/Cat-II : DBM-71
distributary from Km 32.00 to
Km 40.00
i) Earthwork excavation and forming
embankment.
ii) Construction of CM & CD works
iii) Investigation, design and estimation of
distributary system
iv) Distributaries Majors, Minors, sub-minors
and field channels of DBM-71 Branch
canal
SRSP - II
Name of the Contractor : M/s Ramky Infra
Structures &
V. Satyamurthy
Agreement Amount : Rs. 55.35 Crs.
Agreement Date : 06-3-2005
Period of Completion : 30 Months (10 milestones)
Date of Completion : 06-09-2007
Investigation : Completed
Designs : Approved
Execution : Excavation in good progress in total length of
99 KM
Expenditure : Rs. 16.00 Crs. against Rs. 55.35 Crs.(inc.
MA of Rs.2.97Crs.)
Land Acquisition : Required 1264 Acs, Acquired : 378 Acs,
Requisitioned:739Acs.
Package No. 58/Cat-II : DBM-71
distributory from Km 40.00 to
Km 72.00
i) Earthwork excavation and forming
embankment.
ii) Construction of CM & CD works
iii) Distributaries Majors, Minors, sub-minors
and field channels of DBM-71 Branch
canal
SRSP - II
Investigation : KM 47 completed against 135 KMof length
Designs : KM 15 approved against 135 KM of length
Execution : Started Not in good progress
Expenditure : Rs. 3.67 Crs. against Rs. 45.60 Crs.
Land Acquisition : Required 1591 Acs, Acquired : 161 Acs,
Requisitioned:360Acs
Name of the Contractor : M/s Rani Constructions
Agreement Amount : Rs. 45.60 Crs.
Agreement Date : 09-03-2005
Period of Completion : 30 Months (10 milestones)
Date of completion : 09-09-2007
STATUS OF WORKS OF FLOOD FLOW CANAL PROJECT FROM SRSP
DISTRICT WISE AYACUT OF FFC FROM SRSP
Sl. No.
DistrictAyacut in Acres Total
Phase-I Phase-II
1 Karimnagar 1,00,000 30,000 1,30,000
2 Warangal --- 60,000 60,000
3 Nalgonda --- 30,000 30,000
TOTAL 1,00,000 1,20,000 2,20,000
MID MANAIR RESERVOIR 25.87 TMC
KM
(-)
0.8
5
KM
15
.00
KM
17
.00
KM
28
.40
0
KM
43
.00
0
KM
57
.00
KM
70
.00
KM
86
.00
KM
10
3.0
0
KM
12
2.0
0
FRL +318 M
FRL +318.00 M
1.646 TMC
7.0 TMC
FRL +311 M
THOTAPALLY RESERVOIR
25 kms 39 Kms
GOURAVELLI RESERVOIR
RIG
HT S
IDE G
RA
VIT
Y C
AN
AL
LEFT S
IDE G
RA
VIT
Y C
AN
AL
RIG
HT S
IDE
GR
AV
ITY
CA
NA
LLEFT S
IDE G
RA
VIT
Y C
AN
AL
NIZAMABAD KARIMNAGAR
1,00,000 Acres Phase-I
KARIMNAGAR
30,000 Acres Phase-II
WARANGAL
60,000 Acres
NALGONDA
30,000 Acres
FRL +398.5 M
1.090 TMC
TOTAL AYACUT : 2,20,000 Acres
Mothe Reservoir
INDEX
Works Completed
EPC Works in Progress
Reservoirs
District Border
Works under Investigation
1 Project Profile : Excavation of Flood Flow canal (122 KM) from SRSP reservoir to Mid Manair and formation of Mid Mannair Reservoir.
2 Administrative Sanction : G. O. Ms. No. 209, I & CAD, Dt: 17-11-1997 for Rs. 859 Crores
3 No. of EPC Packages : 7 Nos.
4 Agt. Value of 7 Pkgs + old ongoing works : Rs. 1514.75 Crs.
5 Budget Provision for 2006-07 : Rs.400.50Crs.
6 Expenditure
Ongoing works upto 2004 : Rs. 212.69 Crs.
2004-05 : Rs. 94.33 Crs.
2005-06 : Rs. 590.93 Crs.
TOTAL : Rs. 896.95 Crs.
7 Utilisation : 20 TMC
8 Ayacut New Ayacut : 2,20,000 acres
(Tenders to be called for canals & distributaries)
FLOOD FLOW CANAL FROM SRSP
9 Land Acquisition
Required : 19,313 acres
Acquired : 5,924 acres
Requisitioned : 4,948 acres
10 Est. Cost for LA : Rs. 368 Crs.
11 Est. Cost for R & R : Rs. 188.66 Crores
12 Clearances :All CWC clearances including investment clearance obtained
13 Mobilisation Advance : PaidRecovered
2004-05 : 73.65Crs
2005-06 : 10.93Crs.72.79Crs.
Total : 84.78 Crs. 72.79 Crs.
14 Target date for completion : 7/2007
FLOOD FLOW CANAL FROM SRSP
PKG No.
Description AwardedBid AmountRs. in Crs.
1Earth work excavation, construction of CM & CD works of FFC from SRSP in 8 (V) Main canal from KM 28.40 to KM 43.00
M/s Patel – Soma (JV) 165.50
2Earth work excavation, construction of CM & CD works of FFC from SRSP in 6 (V) Main canal from KM 43.00 to KM 57.00
M/s Jai Prakash-Gayatri (JV) 187.00
3Earth work excavation, construction of CM & CD works of FFC form SRSP in 9 (V) Main canal from KM 57.00 to KM 70.00
M/s. IVRCL – SEW & Prasad (JV) 195.03
15Earth work excavation, construction of CM & CD works of FFC from SRSP in Mallal (M) Main canal from KM 70 – KM 86
M/s. Simplex – Subash 218.77
16Earth work excavation, construction of CM & CD works of SRSP in Gangadhara (M) FFC Main canal from KM 86 – KM 103
M/s. Maytas – NCC (JV) 210.06
17Earth work excavation, construction of CM & CD works of FFC from SRSP in Ramadugu (M) Main canal from KM 103 – KM 122
Madhucon Projects Ltd., 199.00
OC Formation of Mid Mannair ReservoirM/s. ZVS-RATNA-
SUSHEEL (JV) 339.39
TOTAL 1514.75
FLOOD FLOW CANAL FROM SRSP
Package No.1/Cat-I : Earth work
excavation and forming
embankment including CM & CD
works from KM 28.40 to KM 43.00
(14.60 KM length)
FLOOD FLOW CANAL FROM SRSPName of the Contractor : M/s PATEL – SOMA(JV)
Agreement Amount : Rs. 165.57 Crores
Agreement Date : 23-10-2004
Period of Completion : 30 Months
(8milestones)
Date of Completion : 23-04-2007
Investigation : Completed
Designs (Structures) : Approved
Execution (canals) : Excavation in good progress for total length of 14.60 KM
Qty. of earth work done : 54.62 Lakh Cum against 125.6 Lakh Cum.
No. of Machinery : Deployed = 131 Nos (Excavators = 18 Nos., Dumpers =
56 Nos.,
Dozers = 13 Nos. etc)
Expenditure : Rs. 120.21Crs. (including Mob. Adv. of Rs.16.55Crs.)
against Rs. 165.50 Crs.
Mob. Adv. Recovered : Rs. 16.55 Crores.
Land Acquisition : Required 859 Acres, Acquired 739 Acres, Requisition:120Acs.
Package No.2 / Cat-I : Earth work
excavation and forming embankment
including CM & CD works from KM 43.00
to KM 57.00 (14.00 KM length)
FLOOD FLOW CANAL FROM SRSPName of the Contractor : M/s JayaPrakash-
Gayathri (JV)
Agreement Amount : Rs. 187.00 Crores
Agreement Date : 23-10-2004
Period of Completion : 30 Months
(10milestones)
Date of Completion : 23-04-2007 Investigation : Completed
Designs (Structures) : Approved
Execution (main canal) : Excavation in progress for total length of 14 KM
Qty. of earth work done : 62.40 Lakh Cum against 97.99 Lakh Cum.
No. of Machinery : Deployed = 168 Nos (Excavators = 18 Nos., Dumpers =
56 Nos.,
Dozers = 13 Nos. etc)
Expenditure : Rs. 104.31 Crs (including Mob. Adv. Of Rs.18.70Crs.) against Rs. 187 Crs.
Mob. Adv. Recovered : Rs. 18.70 Crores.
Land Acquisition : Required 769Acres, Acquired 710Acres, Requisitioned:59Acs.
Package No. 3 / Cat-I : Earth work
excavation and forming embankment
including CM & CD works from KM
57.00 to KM 70.00 (13.00 KM length)
FLOOD FLOW CANAL FROM SRSP
Name of the Contractor : M/s IVRCL-SEW &
Prasad (JV)
Agreement Amount : Rs. 195.03 Crores
Agreement Date : 20-10-2004
Period of Completion : 30 Months (10
milestones)
Date of Completion : 20-10-2007 Investigation : Completed
Designs : Approved
Execution : Excavation in good progress for a total
length of 13 KM
Qty. of earth work done : 75.47Lakh Cum against 131.27 Lakh Cum.
No. of Machinery : Deployed = 232 Nos (Excavators = 34 Nos., Dumpers =
… Nos.,
Dozers = 16 Nos. etc)
Expenditure : Rs. 136.35 Crs. (inc. Mob. Adv.Rs.9.75Crs.)
against Rs.195.03 Crs.
Mob. Adv. Recovered : Rs.9.75 Crs.
Land Acquisition : Required 825Acres, Acquired – 825.33Acs, Balance
Nil.
Package No. 15 / Cat-I : Earth work
excavation and forming embankment
including CM & CD works from KM 70.00
to KM 86 (16.00 KM length)
FLOOD FLOW CANAL FROM SRSP
Name of the Contractor : M/s Simplex –
Subhash
Agreement Amount : Rs. 218. 77 Crores
Agreement Date : 19-03-2005
Period of Completion : 30 Months
Date of Completion : 19-09-2007 Investigation : Completed
Designs (structures) : Completed
Execution : Excavation in progress in total length of 16.645 KM
Qty. of earth work done : 50.61Lakh Cum against 176.63 Lakh Cum.
No. of Machinery : Deployed = 84 Nos (Excavators = 14 Nos., Dozers = 5
Nos. etc)
Expenditure : Rs. 74.10 Crs. (inc. Mob. Adv. of
Rs.21.87Crs.) against Rs.218.77 Crs.
Mob. Advance recovered : Rs. 9.94 Crores
Land Acquisition : Required 1083Acs,Acquired 512.12Acs,Requisitioned
570.88 Acs
Package No. 16 / Cat-I : Earth work
excavation and forming embankment
including CM & CD works from KM 86.00
to KM 103.00
(17.00 KM length)
FLOOD FLOW CANAL FROM SRSPName of the Contractor : M/s Maytas –
NCC (JV)
Agreement Amount : Rs. 210.06 Crores
Agreement Date : 23-03-2005
Period of Completion : 30 Months (10
milestones)
Date of completion : 23-09-2007 Investigation : Completed
Designs : Approved
Execution : Excavation in good progress in total length
of 17 KM
Qty. of earth work done : 62.68 Lakh Cum against 142.14 Lakh Cum.
No. of Machinery : Deployed = 84 Nos (Excavators = 11 Nos., Dozers = 5
Nos. etc)
Expenditure : Rs. 63.80 Crs. (including Mob. Adv.) against
Rs. 210.06 Crs.
Land Acquisition : Required 1098Acs,Acquired 778.33Acs, Requisition
319.67Acs
Package No. 17 / Cat-I : Earth work
excavation and forming embankment
including CM & CD works from KM
103.00 to KM 122.00 (19.00 KM length)
FLOOD FLOW CANAL FROM SRSPName of the Contractor : M/s Madhucon–Sinc–
Hydro (JV)
Agreement Amount : Rs. 19900 Lakhs
Agreement Date : 19-3-2005
Period of Completion : 30 Months (10 milestones)
Date of Completion : 19-09-2007 Investigation : Completed
Designs (Structures) : 7Nos. Approved against 32Nos. Balance
with CE/CDO.
Execution : Excavation in good progress in total length
of 19.00 KM
Qty. of earth work done : 67.45 Lakh Cum against 141.3 Lakh Cum.
No. of Machinery : Deployed = 74 Nos (Excavators = 16 Nos., Dozers = 8
Nos. etc)
Expenditure : Rs. 94.90 Crs. (including Mob.
Adv.Rs9.95Crs.) against Rs. 199.00 Crs.
Mob. Adv. Recovered : Rs. 9.95 Crores.
Land Acquisition : Required 1108.40Acs,Acquired 606.12Acs,
Requisitioned:502.28Acs