Post on 03-Aug-2020
Kilmovee Waste Water Discharge Certificate Application Attachment A.1
A.1 Non-Technical Summary 1. Waste Water Discharge Background Mayo County Council, Aras an Chontae, Castlebar, County Mayo is making an Application, to the Environmental Protection Agency (EPA) for a Waste Water Discharge certificate, for the Kilmovee Waste Water Treatment Plant (WWTP) & Agglomeration, in compliance with the Waste Water Discharge (Authorisation) Regulations 2007 (S.I. No. 684 of 2007). Under Schedule 2 of the above regulations, the prescribed date for submission of Waste Water Discharge Certificate for agglomerations with a population equivalent of less than 500 PE is 22nd December 2009. The waste water works at Kilmovee falls under this category, presently having an agglomeration with a population equivalent of 170 PE. The scheme was financed by funding from DoEHLG under the Small Schemes Programme and Mayo County Council. 2. Description Of Kilmovee Waste Water Works / Sewerage Kilmovee Waste Water Treatment Plant was commissioned in early 2008 to serve a design population equivalent PE of 300 and is currently operated by Mayo County Council. The Waste Water Works in Kilmovee consists of a wastewater treatment plant with a collection network of 225mm diameter foul sewers and 2 no pumping stations. Treated Effluent from the plant is discharged to the Kilmovee River (Primary Discharge Point). The WWTP is based on the attached growth process and designed to treat sewage from a population equivalent of 300 PE. The Waste Water Treatment process takes place in a package plant consisting of the following;
Influent sampling point Influent chamber Primary settlement tank Sludge storage in primary settlement tank Two attached growth reactors with final settlement tank Final effluent sampling points
A.1 Page 1 of 3
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment A.1
3. Sources of Emissions The treated final effluent from the waste water treatment plant is discharged to the Kilmovee River through an outfall labelled SW1 (P) (154635E, 293456N). This is the primary discharge point. The Kilmovee River is a tributary of the Lung River which flows into Lough Gara and forms part of the Shannon River Catchment. There are no secondary or storm water discharges. 4. Nature and Quantities of Foreseeable Emissions The wastewater treatment works is designed to treat the wastewater to the standards required by the Urban Wastewater Treatment Regulations. i.e. BOD 25mg/L, COD 125mg/L and SS 35mg/L The average volume currently discharged from the municipal effluent stream of the treatment plant is estimated at 38.25m³/day (170 PE @ 225L/per P.E. day). This is equivalent to an estimated maximum discharge of 0.96kg BOD/day and 1.34kg/day Suspended Solids. It is expected that the PE being treated by the Kilmovee Waste Water Works will increase to 200 PE in the medium term which would mean an increase in the average discharge from the treatment works to 45m³/day. The discharge from the treatment plant is to the Kilmovee River which flows into the Lung River which in turn flows into Lough Gara in Roscommon. The Kilmovee River is not designated Salmonid or Nutrient Sensitive. No SAC, SPA, or NHA have been identified near the plant. 5. Technology for Prevention or Reduction of Emissions Emissions from the WWTP are monitored and the treatment process is adjusted to maximise the efficiency of the plant in removing any pollutants. The process, as has already been summarised above, is successful in removing BOD, and suspended solids from the final effluent which results in a reduction of harmful emissions from the treatment works. 6. Further Measures Planned to Eliminate or Reduce Emissions There are no immediate proposals.
A.1 Page 2 of 3
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment A.1
A.1 Page 3 of 3
7. Supervision of works The WWTP is visited by an operative on a regular basis to monitor plant operation and maintenance. 8. Measures planned to monitor emissions to the environment It is proposed to carry out routine sampling on a bi-annual basis.
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Ogham Stone
Tobernaborhilla
(Site of)
(Site of)
Killerrikeen
(Site of)
CW
Knocknacreisha
(Site of)
Ringfort
FW
(site of)
Loughanalea
CW
RUSHEENS WEST
Caves
FW
CW
BALLINRUMPA
CW
Loughanenachista
CF
CW
Cloighard or Loighta
Lauaghnabra
UND
UN
D
CW
CF FF
CF
CDUND
CD
CF
CF
FW
CF
CS
CS
School
FF
CW
FF
UN
D
FF
CS
CD
CW
UN
D
CS
Cashel
(Site of)
Post Office
Cashel
(Site of)
Church
Kilmovee
CR
CS
KILMOVEE
UND
FW
UND
CD
FW
FF
UND
CW
Kilmover
Wild Wood
(Site of)
Ringfort
FF
CF
UND
CF
SRAHEENS
CR
9
9SP1SP1
aSW1u
aSW1dSW1(P)
PS1
PS2
Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192
Mayo County Council G.I.S. Section
Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2009/17 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2009.
99
Legend
Pumping Station
Primary Discharge Point
Inlet Sampling Point
Outlet Sampling Point
Upstream Sampling PointDownstream Sampling Point
Kilmovee WastewaterTreatment Plant Boundary
Agglomeration Boundary
Drg. Title:
Kilmovee Wastewater Treatment PlantAgglomeration
Project:
Waste Water Discharge Certificate Application
Scale: Date:
Drg. Nr: Rev:
Drawn By: Checked By: Approved By:
1:7,500 & 1:50,000 17/08/09
Map B.1 A
C Worsfold F Jennings T.ReidyFor ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192
Mayo County Council G.I.S. Section
Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2009/17 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2009.
99
Legend
Primary Discharge Point
Inlet Sampling Point
Outlet Sampling Point
Upstream Sampling PointDownstream Sampling Point
Kilmovee WastewaterTreatment Plant Boundary
Agglomeration Boundary
Drg. Title:
Kilmovee Wastewater Treatment PlantSite Layout
Project:
Waste Water Discharge Certificate Application
Scale: Date:
Drg. Nr: Rev:
Drawn By: Checked By: Approved By:
1:250 17/08/09
Map B.2 A
C Worsfold F Jennings T.Reidy
SP2
SP1
Secondary Settlement Tank
Control HousePrimary Settlement Tank
SP2
SP1
Secondary Settlement Tank
Control HousePrimary Settlement Tank
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Post Office
Church
Kilmovee9
9
SP2
SP1
SP2
SP1
aSW1u
aSW1d
SW1P
Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192
Mayo County Council G.I.S. Section
Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2009/17 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2009.
99
Legend
Primary Discharge Point
Inlet Sampling Point
Outlet Sampling Point
Upstream Sampling PointDownstream Sampling Point
Kilmovee WastewaterTreatment Plant Boundary
Agglomeration Boundary
Drg. Title:
Kilmovee Wastewater Treatment PlantPrimary Discharge Licence SW1(P)
Project:
Waste Water Discharge Certificate Application
Scale: Date:
Drg. Nr: Rev:
Drawn By: Checked By: Approved By:
1:1,000 17/08/09
Map B.3 A
C Worsfold F Jennings T.ReidyFor ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment B.6
B.6 Planning Authority Decision Planning Permission was granted under the provision of Part 8 of the Local Government (Planning & Development) Regulations 2001. The following report was subsequently passed by the council.
B.6 Page 1 of 1
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
(
TO:
FROM:
DATE:
RE:
FILE:
COMHAIRLE CONTAE MHAIGH EO
MAYO COUNTY COUNCIL
CAPITAL WORKS SECTION
MEMO
JOE BEIRNE, DIRECTOR OF SERVICES & COUNTY ENGINEER
MR. PAT COMMONS, SEO
14th December, 2005
~LMOVEESEWERAGESCHEME-PART8
S/K6/1
I refer to the above matter and in accordance with Part 8 of the Local Government Planning and Development (Regulations 2001) the Council are in the process of carrying out the requirements for planning in respect of the above development.
The time limit for receipt of observations from notice of proposed development has expired and the closing date of receipt of such observations was the i h December, 2005.
2 No. observations (copies attached) has been received from:
1. Department of the Environment, Heritage & Local Government, Dun Sceine, Harcourt Lane, Dublin 2.
2. Joseph & Margaret O'Dowd, Kilmovee, Ballinvoher, Co. Mayo. (Also including copy of response by Pat Commons, SEO, to letter dated 25/11105).
In accordance with Article 84 of the regulations it is necessary for the Council to prepare a Report for sublnission to the Council Members for consideration.
I would be grateful if you could prepare a Report in relation to Article 1 79(4 )(b) to evaluate the likely implications if any of the proposed development with respect to the proper planning and sustainable development of the area and to which development is situated.
Pat Commons, S.E.O. Encls.
(
TO:
FROM:
DATE:
RE:
FILE:
COMHAIRLE CONTAE MHAIGH EO
MAYO COUNTY COUNCIL
CAPITAL WORKS SECTION
MEMO
JOE BEIRNE, DIRECTOR OF SERVICES & COUNTY ENGINEER
MR. PAT COMMONS, SEO
14th December, 2005
~LMOVEESEWERAGESCHEME-PART8
S/K6/1
I refer to the above matter and in accordance with Part 8 of the Local Government Planning and Development (Regulations 2001) the Council are in the process of carrying out the requirements for planning in respect of the above development.
The time limit for receipt of observations from notice of proposed development has expired and the closing date of receipt of such observations was the i h December, 2005.
2 No. observations (copies attached) has been received from:
1. Department of the Environment, Heritage & Local Government, Dun Sceine, Harcourt Lane, Dublin 2.
2. Joseph & Margaret O'Dowd, Kilmovee, Ballinvoher, Co. Mayo. (Also including copy of response by Pat Commons, SEO, to letter dated 25/11105).
In accordance with Article 84 of the regulations it is necessary for the Council to prepare a Report for sublnission to the Council Members for consideration.
I would be grateful if you could prepare a Report in relation to Article 1 79(4 )(b) to evaluate the likely implications if any of the proposed development with respect to the proper planning and sustainable development of the area and to which development is situated.
Pat Commons, S.E.O. Encls.
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
I ' - '
COMHAIRLE CONTAE MHAIGH EO MAYO COUNTY COUNCIL
Local Government (Planning & Development) Regulations 2001 (PART 8)
KILMOVEE SEWERAGE SCHEME ursuant to the requirements of Part 8 of the Planning & Development
. egulations, 2001, notice is hereby given that MAYO COUNTY COUNCIL oroposes to undertake the following works, in connection with the ab6ve Scheme, oarticulars of which are set out in the Schedule hereunder.
lans and particulars of the proposed development will be available for inspection at:- '
rhe Offices of Mayo County Council, Aras an Chontae, Castlebar, Co. Mayo. Swinford Area Office" College House, Station Road, Swinford, Co. Mayo.
""rom 9.00am to 5.00pm on each day during which the said office is open for rransaction for business, for a period ~eginning the 25th October, 2005 and ending :he 23rd November, 2005.
Submissions or observations with respect to the proposed development, dealing ith the proper planning and sustainable development of the area in which the
fievelopment is situated, may be made in writing to Mayo County Council not later han 5pm on 7th December, 2005.
SCHEDULE
Location Nature & ~ent of Development
Kilmovee The Scheme will ,tnclude the following works:
(a) The cons~~~ction of 2310 ' metres of 225mm gravity foul sewage 'pipelines and associated manholes.
(b) The construction of 1060 metres of 100mm rising. (c) Provision of a modern sewage treatment plant with a
design capacity Q( 300 population equivalent. (d) The construction of 2 no. Pumping Stations. (e) The construction of outfall pipe to Kilmovee river.
Mr. John Condon, County Secretary, I
~ayo County Council, Aras an Chontae, astlebar, County Mayo.
P8 FRIESIAN BULL FOR SALE Very quiet animal, calves, high in milk
~nd protein. Can be
seen.
Tel. (087) 6972731.
BONNICONLON GUN CLUB
To whom it may concern. Shooting on lands, lakes and rivers in the Bonniconlon area is strrctly r~served for club members only.
NO SHOOTING
On my lands at Rathnagussane and Rusheens, Kilmovee.
Signed: Mary Higgins.
r"\_ .... _ L _ , _ "'\ re "" __ _
Trespass Notice We, the undersigned, strictly forbid, by day or night, any day of the year, trespassing or
shooting on our properties at:
Barroe, Calve, Cloonfane, Fauleens, Castleduff, Park,
Cranmore, Corragoola, Lismulgee, Cloonmore, Tonnagh,
. Carrowntober, Botinny, Ballintadder, Lavagh, Cloonmeen,
Clooncouse, Gowel, Brackloonagh, Cloonaweema, Lecarrow, Lurga,
Puntabeg, Speck, Chappalcurragh, Palmfield, Gowlaun, Brackloon,
Sraugh, Tavneena, Glan, Choppolcurragh, Floughana,
Cloonlumney, Curry-East, Lowpark, Fuel . .
Signed:
William Grady, John McManus, John Con nor, Tommie Grady, Martin Casey, .Danilo Dozio, Pat Boland, Mary Casey, Michael McDonnell, Pat Richardson, Maureen Aldred, Liam Brennan, Marty Owens, John Regan, Jack Gallagher, Jim Durcan, Jim Halligan, Michael Carrabine, John J. Davy, Chris Duffy, Micky Grady, John McDermot, Theresa Feeney, Luke Feeney, Liam Regan, Mark Callaghan, Paddy Brennan, Geraldine O'Donnell, Vincent Coleman, Kevin Regan, Johnny Hunt, Sean Griffin, Eddie Dooney, Michael Morris, Thomas B. Ryan, Paddy Beirne, Eddie Connor, L. Gallagher, Michael Gallagher, J. Martin Flannery, Brendan McLoughlin, John, McLoughlin, Mick Peyton, Michael Peyton, John McNicholas, Pat Murphy, John O'Connor, Eddie Murphy, Willie Vesey, Sean Regan, John Madden, Joe Reid, M. Dyson, Michael J. Ryan, Tom Morley, Rachel Hunt, Johnny Cawley, Michael Fleming, Maureen Walsh, Francis Doherty, Darren Fahy and Martin Henry (Eamonn).
I ' - '
COMHAIRLE CONTAE MHAIGH EO MAYO COUNTY COUNCIL
Local Government (Planning & Development) Regulations 2001 (PART 8)
KILMOVEE SEWERAGE SCHEME ursuant to the requirements of Part 8 of the Planning & Development
. egulations, 2001, notice is hereby given that MAYO COUNTY COUNCIL oroposes to undertake the following works, in connection with the ab6ve Scheme, oarticulars of which are set out in the Schedule hereunder.
lans and particulars of the proposed development will be available for inspection at:- '
rhe Offices of Mayo County Council, Aras an Chontae, Castlebar, Co. Mayo. Swinford Area Office" College House, Station Road, Swinford, Co. Mayo.
""rom 9.00am to 5.00pm on each day during which the said office is open for rransaction for business, for a period ~eginning the 25th October, 2005 and ending :he 23rd November, 2005.
Submissions or observations with respect to the proposed development, dealing ith the proper planning and sustainable development of the area in which the
fievelopment is situated, may be made in writing to Mayo County Council not later han 5pm on 7th December, 2005.
SCHEDULE
Location Nature & ~ent of Development
Kilmovee The Scheme will ,tnclude the following works:
(a) The cons~~~ction of 2310 ' metres of 225mm gravity foul sewage 'pipelines and associated manholes.
(b) The construction of 1060 metres of 100mm rising. (c) Provision of a modern sewage treatment plant with a
design capacity Q( 300 population equivalent. (d) The construction of 2 no. Pumping Stations. (e) The construction of outfall pipe to Kilmovee river.
Mr. John Condon, County Secretary, I
~ayo County Council, Aras an Chontae, astlebar, County Mayo.
P8 FRIESIAN BULL FOR SALE Very quiet animal, calves, high in milk
~nd protein. Can be
seen.
Tel. (087) 6972731.
BONNICONLON GUN CLUB
To whom it may concern. Shooting on lands, lakes and rivers in the Bonniconlon area is strrctly r~served for club members only.
NO SHOOTING
On my lands at Rathnagussane and Rusheens, Kilmovee.
Signed: Mary Higgins.
r"\_ .... _ L _ , _ "'\ re "" __ _
Trespass Notice We, the undersigned, strictly forbid, by day or night, any day of the year, trespassing or
shooting on our properties at:
Barroe, Calve, Cloonfane, Fauleens, Castleduff, Park,
Cranmore, Corragoola, Lismulgee, Cloonmore, Tonnagh,
. Carrowntober, Botinny, Ballintadder, Lavagh, Cloonmeen,
Clooncouse, Gowel, Brackloonagh, Cloonaweema, Lecarrow, Lurga,
Puntabeg, Speck, Chappalcurragh, Palmfield, Gowlaun, Brackloon,
Sraugh, Tavneena, Glan, Choppolcurragh, Floughana,
Cloonlumney, Curry-East, Lowpark, Fuel . .
Signed:
William Grady, John McManus, John Con nor, Tommie Grady, Martin Casey, .Danilo Dozio, Pat Boland, Mary Casey, Michael McDonnell, Pat Richardson, Maureen Aldred, Liam Brennan, Marty Owens, John Regan, Jack Gallagher, Jim Durcan, Jim Halligan, Michael Carrabine, John J. Davy, Chris Duffy, Micky Grady, John McDermot, Theresa Feeney, Luke Feeney, Liam Regan, Mark Callaghan, Paddy Brennan, Geraldine O'Donnell, Vincent Coleman, Kevin Regan, Johnny Hunt, Sean Griffin, Eddie Dooney, Michael Morris, Thomas B. Ryan, Paddy Beirne, Eddie Connor, L. Gallagher, Michael Gallagher, J. Martin Flannery, Brendan McLoughlin, John, McLoughlin, Mick Peyton, Michael Peyton, John McNicholas, Pat Murphy, John O'Connor, Eddie Murphy, Willie Vesey, Sean Regan, John Madden, Joe Reid, M. Dyson, Michael J. Ryan, Tom Morley, Rachel Hunt, Johnny Cawley, Michael Fleming, Maureen Walsh, Francis Doherty, Darren Fahy and Martin Henry (Eamonn).
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment C.1
C.1 Operational Information Requirements 1. Description Of Kilmovee Waste Water Works / Sewerage scheme Kilmovee wastewater treatment plant (WWTP) was designed by NUI Galway for a population of 300 population equivalent (PE) for organic carbon and solids removal from the wastewater to the European Urban Wastewater Treatment Directive discharge limits of 25 mg BOD5/l and 35 mg SS/l (European Directive EEC/23/91) with three months primary and secondary sludge storage. The treatment process employed at Kilmovee is a pumped flow biofilm reactor (PFBR), combining the advantages of the sequencing batch reactor (SBR) and attached growth (biofilm) processes to form a sequencing batch biofilm reactor (SBBR). The reactors of the WWTP are fed in batches. An attached growth process, the system is characterised by: its ease of operation and maintenance; low operating costs; and comprising no moving parts or compressors, other than hydraulic pumps. Aeration is achieved by alternatively exposing the biofilm (attached to plastic media blocks) in each of the two reactor tanks to atmospheric air, thereby eliminating the need for forced aeration. The WWTP comprises two separate tank units: a Primary Settlement Tank (PST) unit (Figure 1); and, a Treatment Tank (TT) unit (Figure 3). A summary of the WWTP tanks, compartments and equipment is provided in Table 1.
Table 1 Summary of WWTP
Tank Compartment Equipment Level sensor
PST unit Primary Settlement Zone
Balance Tank 1
TT unit Balance Tank 2 Feed Pump Low water level
Reactor 1 Circulation Pump 1
Low & High water levels
Motorised Valve
Reactor 2 Circulation Pump 2
Low & High water levels
Discharge Pump
As above
Clarifier Clarifier Pump Low water level
C.1 Page 1 of 5
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment C.1
Wastewater enters the WWTP through a pumped rising main from Pumping Station No. 2 located at the Church in Kilmovee Village and leaves the plant from a gravity outfall linked to a nearby stream (Figure 1).
Figure 1 - Flow paths at Kilmovee WWTP showing the access points to the Inlet Chamber (INF) and Intermediate Chamber (INT) between the tank units.
C.1 Page 2 of 5
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment C.1
The PST unit (2.6 m diameter and 10.5 m in length) is divided internally into two compartments: settlement of solids occurs in the first compartment (Primary Settlement Zone: working volume = 47 m3); the second compartment acts as a balance tank (Balance Tank 1: working volume = 12 m3) to the connecting TT (Figure 2). When the wastewater has passed through the primary settlement zone, it overflows through a 25 mm vertical bar screen into the adjoining balance tank. Access point, INF, allows entry to the inlet chamber where the rising main from Pumping Station No. 2 terminates. 5 No. access points are provided in the PST unit: PS 1 – 3 and BT1 1 and 2 (Figure 2).
Primary Settlement Balance Tank 1
Flow fromPumpingStation No. 2
Flow toBalanceTank 2
Screen
PS1
PS2
BT-11
BT-12
PS3
INF
Elevation View
Plan View
Figure 2 - Sketch elevation and plan views of the Primary Settlement Tank unit with access points labelled
Eleven access points are provided in the TT unit (Figure 3): one in Balance Tank 2 (BT2-1); four in Reactor 1 (R1 1 – 4); three in Reactor 2 (R2 1 – 3); two in the Clarifier (C 1 and 2) and one at the gravity outfall (OUT).
C.1 Page 3 of 5
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment C.1
The TT (2.6 m diameter and 12.8 m in length) unit is divided internally into four compartments: Balance Tank 2, Reactor 1, Reactor 2 and Clarifier (Figure 3). Balance Tank 2 (working volume = 12 m3) is connected to Balance Tank 1 in the PST unit by a gravity pipe.
Flow fromBalanceTank 1
BalanceTank 2
Reactor 1Reactor 2Clarifier
Gravityoutfall
Plan View
Section View
BT-21
R11
R12
R13
R14
R21
R22
R23
C1
C2
OUT
Storm overflowStorm overflow
Clarifier Pump
Figure 3 - Sketch elevation and plan views of the Treatment Tank (TT) unit showing Clarifier Pump and storm overflow locations, and labelled access points
C.1 Page 4 of 5
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment C.1
C.1 Page 5 of 5
C.1.1 Storm Water Overflows There are no storm overflows from Kilmovee Sewerage Works. C.1.2 Pumping Stations Due to the topography of the agglomeration it is necessary to serve the Carracastle Road by gravity to a pumping station at the rear of the Church. The sewage is pumped from here via a 100mm rising main to the Treatment Plant. The Kilkelly Road is served by gravity to a pumping station 430m from the crossroads in the centre of the village. The sewage is pumped from here via a 100mm rising main to a manhole at the crossroads in the centre of the village. There is a minimum of 8 hours storage provided in the two pump sumps in the event of a power failure and there are two submersible pumps in each pumping station which operate on a duty and standby basis. There are no emergency overflows provided from the pumping stations and no breakdowns have occurred since they were commissioned in early 2008. Table C.1.2.A – Pump station details
No. Pumps Reference Location
Capacity (m3) Duty Assist Standby
PS1 Kilkelly Road 12.60 1 1
PS2 Carracastle Road 17.30 1 1
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Treated EffluentTo Kilmovee River
FinalSettlementTankBalancing
TankReactor x 2
Sludge to Swinford WWTP
Raw Waste WaterInlet
Primary SettlementTank
Sludge to Swinford WWTP
BalancingTank
Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192
Mayo County Council G.I.S. Section
Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2009/17 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2009.
Drg. Title:
Kilmovee Wastewater Treatment PlantProcess Flow Diagram
Project:
Waste Water Discharge Certificate Application
Scale: Date:
Drg. Nr: Rev:
Drawn By: Checked By: Approved By:
NTS 29/07/09
Map C.1. A
C WorsfoldF Jennings
T. Reidy
No Window
Return Liquors
Raw Wastewater
Stormwater
Sludge
Final Effluent
Flow to Secondary Tanks
Legend:
Dewatered Sludge
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 1
WWD Licence Application
Agglomeration details
Contact details
Leading Local Authority Mayo County CouncilCo-ApplicantsAgglomeration KilmoveePopulation Equivalent 300Level of Treatment SecondaryTreatment plant address Kilmovee Waste Water Treatment Plant
KilmoveeCounty Mayo
Grid Ref (12 digits, 6E, 6N) 154588 / 293384EPA Reference No:
Contact Name: Paddy MahonContact Address: Director of Services
Ballina Town CouncilCivic OfficesArran PlaceCo. Mayo
Contact Number: 096 76100Contact Fax: 096 76199Contact Email: pmahon@mayococo.ie
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 2
WWD Licence Application Annex I
Table D.1(i)(a): EMISSIONS TO SURFACE/GROUND WATERS (Primary Discharge Point)
Discharge Point Code: SW-1
Emission Details:
Local Authority Ref No: SW1(P)Source of Emission: Kilmovee WWTPLocation: Final Effluent Discharge PointGrid Ref (12 digits, 6E, 6N) 154635 / 293456Name of Receiving waters: Kilmovee RiverWater Body: River Water BodyRiver Basin District Shannon IRBDDesignation of Receiving Waters: noneFlow Rate in Receiving Waters: 0.004 m3.sec-1 Dry Weather Flow
0.008 m3.sec-1 95% Weather FlowAdditional Comments (e.g.commentary on zero flow or otherinformation deemed of value)
(i)Volume emittedNormal/day 38.25 m3 Maximum/day 114.75 m3
Maximumrate/hour
4.78 m3 Period of emission(avg)
60 min/hr 24 hr/day 365 day/yr
Dry Weather Flow 0.000442708m3/sec
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 3
WWD Licence Application Annex I
Table D.1(i)(b): EMISSIONS TO SURFACE/GROUND WATERS - Characteristics of The Emission
(Primary Discharge Point)
Discharge Point Code: SW-1
For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45µm filter paper
For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.
Substance As discharged
Unit ofMeasurement
Sampling Method Max Daily Avg. kg/day
pH pH Grab = 7.3
Temperature °C Grab = 18.6
Electrical Conductivity (@ 25°C) µS/cm Grab = 594
Suspended Solids mg/l Grab = 9 0.344
Ammonia (as N) mg/l Grab = 11.667 0.4463
Biochemical Oxygen Demand mg/l Grab = 10 0.3825
Chemical Oxygen Demand mg/l Grab = 77 2.945
Total Nitrogen (as N) mg/l Grab = 19.63 0.7508
Nitrite (as N) mg/l Grab = 0.816 0.0312
Nitrate (as N) mg/l Grab = 1.964 0.075
Total Phosphorous (as P) mg/l Grab = 4.171 0.1595
OrthoPhosphate (as P) mg/l Grab = 2.738 0.1047
Sulphate (SO4) mg/l Grab = 20.2 0.77265
Phenols (Sum) µg/l Grab = 5 0.00019125
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 4
WWD Licence Application Annex I
Table D.1(i)(c): DANGEROUS SUBSTANCE EMISSIONS TO SURFACE/GROUND WATERS -
Characteristics of The Emission (Primary Discharge Point)
Discharge Point Code: SW-1
For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45µm filter paper
For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.
Substance As discharged
Unit ofMeasurement
Sampling Method Max Daily Avg. kg/day
Atrazine µg/l Grab = 0.02 0.000000765
Dichloromethane µg/l Grab = 1 0.00003825
Simazine µg/l Grab = 0.031 0.000001185
Toluene µg/l Grab = 1 0.00003825
Tributyltin µg/l Grab = 0.02 0.000000765
Xylenes µg/l Grab = 1 0.00003825
Arsenic µg/l Grab = 0.7 0.000026775
Chromium µg/l Grab = 0.5 0.000019125
Copper µg/l Grab = 14 0.0005355
Cyanide µg/l Grab = 100 0.003825
Flouride µg/l Grab = 100 0.003825
Lead µg/l Grab = 0.8 0.0000306
Nickel µg/l Grab = 0.8 0.0000306
Zinc µg/l Grab = 87 0.00332775
Boron µg/l Grab = 39 0.00149
Cadmium µg/l Grab = 0.5 0.000019125
Mercury µg/l Grab = 0.05 0.000001912
Selenium µg/l Grab = 0.5 0.000019125
Barium µg/l Grab = 24 0.000918
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application
D.2 Tabular Data on Discharge Points
Attachment D.2
PT_CD PT_TYPE LA_NAME RWB_TYPE RWB_NAME DESIGNATION EASTING NORTHING VERIFIED
SW1(P) PrimaryMayo County Council River Kilmovee River None 154635 293456 Y
D.2 1 of 1
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 5
WWD Licence Application Annex I
TABLE E.1(i): WASTE WATER FREQUENCY AND QUANTITY OF DISCHARGE – Primary and
Secondary Discharge Points
Identification Code for Discharge point Frequency of discharge (days/annum) Quantity of Waste Water Discharged
(m³/annum)
SW-1 365 13961.25
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 6
WWD Licence Application Annex I
TABLE E.1(ii): WASTE WATER FREQUENCY AND QUANTITY OF DISCHARGE – Storm Water
Overflows
Identification Code for Dischargepoint
Frequency of discharge(days/annum)
Quantity of Waste WaterDischarged (m³/annum)
Complies with Definition of StormWater Overflow
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment E.2
E.2 Monitoring and Sampling Points Programme of Environmental Monitoring Kilmovee wastewater treatment plant is designed to treat municipal wastewater to the standards required under the Urban Waste Water Treatment Regulations, 2001. It is proposed to carry out routine sampling on a bi-annual basis. Sampling Methods Sampling is currently by grab only Provision of sampling points and safe means of access Sampling points are provided at the wastewater treatment plant at both the inlet works manhole (SP1) and at the outlet final effluent chamber (SP2). The location of these sampling points is shown on Drawing No.5 (Map E.2). Receiving water monitoring points are located upstream and downstream of the primary discharge point. The monitoring points, labelled aSW1u (upstream) and ASW1d (downstream) are shown on Drawing No. 5 (Map E.2).
E.2 Page 1 of 2
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment E.2
E.2 Page 2 of 2
Analytical and Quality Control Procedures Two samples per year from both sampling and monitoring points (detailed in section E.3) will be taken by Complete Laboratory Solutions (CLS) for UWWT returns to the EPA and analysed by an external laboratory for the following parameters:
Temperature Dissolved Oxygen pH Chemical Oxygen Demand Biochemical Oxygen Demand Suspended Solids Total Phosphorous as P Total Nitrogen as N TON as N Orthophosphate as P Ammonium as NH4
The external laboratory has INAB ISO 17025 accreditation for the following parameters:
pH Chemical Oxygen Demand Biochemical Oxygen Demand Suspended Solids TON as N Orthophosphate as P Ammonium as NH4
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Post Office
Church
Kilmovee9
9
SP2
SP1
SP2
SP1
aSW1u
aSW1d
SW1P
Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192
Mayo County Council G.I.S. Section
Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2009/17 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2009.
99
Legend
Primary Discharge Point
Inlet Sampling Point
Outlet Sampling Point
Upstream Sampling PointDownstream Sampling Point
Kilmovee WastewaterTreatment Plant Boundary
Agglomeration Boundary
Drg. Title:
Kilmovee Wastewater Treatment PlantSampling and Monitoring Points
Project:
Waste Water Discharge Certificate Application
Scale: Date:
Drg. Nr: Rev:
Drawn By: Checked By: Approved By:
1:1,000 17/08/09
Map E.2 A
C Worsfold F Jennings T.ReidyFor ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application
E.3 Tabular Data On Monitoring And Sampling Points
Attachment E.3
PT_CD PT_TYPE MON_TYPE EASTING NORTHING VERIFIEDSW1(p) Primary S 154635 293456SP1 Inlet Sampling Point S 154601 293378 YSP2 Outlet Sampling Point S 154606 293390 YaSW1u Upstream Monitoring Point (aSW-1u) S 154625 293460 YaSW1d Downstream Sampling Point S 154764 293408 Y
1 of 1
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application E.4 Attachment
E.4 Sampling Data The Urban Waste Water Treatment Directive 91/271/EEC sets standards for final
effluent discharged to the receiving waters as follows;
Biochemical Oxygen Demand 25 mg/L O2
Chemical Oxygen Demand 125 mg/L O2
Total Suspended Solids 35 mg/L
Sampling by an external laboratory (CLS, Ros Muc, Co.Galway) with
INAB ISO 17025 accreditation has been carried out.
See Attachments D.1 & F.1.
E.4 Page 1 of 1
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment F.1
F.1 Assessment of impact on Receiving Water
Mayo County Council will carry out an “appropriate assessment” if required, in accordance with – Note on Appropriate Assessments for the purposes of the Waste Water Discharge (Authorisation) Regulations, 2007 (S.I. No. 684 of 2007) as part of the Waste Water Discharge Certificate process for Kilmovee. The Kilmovee WWTP discharges into the Kilmovee River, which is not designated as salmonid (under the National Salmonid Regulations) and is not designated as nutrient sensitive under the UWWT Regulations. There is a complex of adjoining / overlapping sites located approximately 18.4km downstream of (to the east of) the primary discharge point, within County Roscommon. The complex includes:
Tullaghanrock Bog NHA and SAC (Site Codes 2013 and 2354), Lough Gara pNHA (Site Code 000587) and SPA (Sited Code 4048) Callow Bog SAC (Sited Code 000595)
There are no designated shellfish waters in proximity to the Kilmovee Waste Water Treatment Plant and agglomeration although it is at the upper reaches of the West Shannon catchment area. West Shannon which is approximately 100 miles away includes the following designated shellfish areas:
Ballylongford Poulnasharry Bay Carrigaholt Rinevella
North Roscommon Regional Water Supply Scheme abstracts water from Lough Gara which is approximately 23km downstream of the Kilmovee Waste Water Plant.
F.1 Page 1 of 1
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 7
WWD Licence Application Annex I
TABLE F.1(i)(a): SURFACE/GROUND WATER MONITORING
Primary Discharge Point
For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45µm filter paper
For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.
Discharge Point Code: SW-1MONITORING POINT CODE: aSW-1dGrid Ref (12 digits, 6E, 6N) 154764 / 293408 (Verifed using GPS)
Parameter Results (mg/l) Samplingmethod
Limit ofQuantitation
Analysismethod /technique
22/07/09
pH = 7.5 Grab 2 CLS 26
Temperature = 15.1 Grab -5 PROBE
Electrical Conductivity (@25°C)
= 142.1 Grab 5 PROBE
Suspended Solids = 2 Grab 2 CLS 13
Ammonia (as N) = 0.006 Grab 0.005 KONELABCLS 40
Biochemical Oxygen Demand = 1 Grab 2 CLS 12
Chemical Oxygen Demand = 58 Grab 10 CLS 52
Dissolved Oxygen = 9.4 Grab 0.1 CLS 75
Hardness (as CaCO3) = 65.5 Grab 20 KONELABCLS 77
Total Nitrogen (as N) = 1.561 Grab 0.5 CLS 55
Nitrite (as N) = 0.005 Grab 0.01 KONELABCLS 37
Nitrate (as N) = 0.12 Grab 0.1 KONELABCLS 39
Total Phosphorous (as P) = 0.068 Grab 0.01 CLS 151
OrthoPhosphate (as P) = 0.01 Grab 0.01 KONELABCLS 35
Sulphate (SO4) = 5 Grab 5 KONELABCLS 88
Phenols (Sum) = 5 Grab 5 SPE/GCMS
Additional Comments:
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 8
WWD Licence Application Annex I
TABLE F.1(i)(b): SURFACE/GROUND WATER MONITORING (Dangerous Substances)
Primary Discharge Point
Discharge Point Code: SW-1MONITORING POINT CODE: aSW-1dGrid Ref (12 digits, 6E, 6N) 154764 / 293408 (Verifed using GPS)
Parameter Results (µg/l) Samplingmethod
Limit ofQuantitation
Analysismethod /technique
22/07/09
Atrazine = 0.04 Grab 0.04 GC/MS
Dichloromethane = 1 Grab 1.0 GCMS,(USEPA8260B)
Simazine = 0.04 Grab 0.04 GC/MS
Toluene = 1 Grab 1.0 GCMS,(USEPA8260B)
Tributyltin = 0.02 Grab 0.02 GC
Xylenes = 1 Grab 1.0 GCMS,(USEPA8260B)
Arsenic = 1 Grab 0.5 ICP-MS CLS129
Chromium = 0.6 Grab 0.5 ICP-MS CLS129
Copper = 2 Grab 1.0 ICP-MS CLS129
Cyanide = 100 Grab 100 COLORIMETRIC
Flouride = 100 Grab 100 LC
Lead = 0.5 Grab 0.5 ICP-MS CLS129
Nickel = 0.5 Grab 0.5 ICP-MS CLS129
Zinc = 5 Grab 5 ICP-MS CLS129
Boron = 14 Grab 10 ICP-MS CLS129
Cadmium = 0.5 Grab 0.5 ICP-MS CLS129
Mercury = 0.05 Grab 0.05 ICP-MS CLS103
Selenium = 0.5 Grab 0.5 ICP-MS CLS129
Barium = 82 Grab 0.5 ICP-MS CLS129
Additional Comments:
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 9
WWD Licence Application Annex I
TABLE F.1(i)(a): SURFACE/GROUND WATER MONITORING
Primary Discharge Point
For Orthophosphate: this monitoring should be undertaken on a sample filtered on 0.45µm filter paper
For Phenols: USEPA Method 604, AWWA Standard Method 6240, or equivalent.
Discharge Point Code: SW-1MONITORING POINT CODE: aSW-1uGrid Ref (12 digits, 6E, 6N) 154625 / 293460
Parameter Results (mg/l) Samplingmethod
Limit ofQuantitation
Analysismethod /technique
22/07/09
pH = 7.5 Grab 2 CLS 26
Temperature = 15.1 Grab -5 PROBE
Electrical Conductivity (@25°C)
= 141.8 Grab 5 PROBE
Suspended Solids = 2 Grab 2 CLS 13
Ammonia (as N) = 0.03 Grab 0.005 KONELABCLS 40
Biochemical Oxygen Demand = 1 Grab 2 CLS 12
Chemical Oxygen Demand = 55 Grab 10 CLS 52
Dissolved Oxygen = 9.3 Grab 0.1 CLS 75
Hardness (as CaCO3) = 64.7 Grab 20 KONELABCLS 77
Total Nitrogen (as N) = 1.486 Grab 0.5 CLS 55
Nitrite (as N) = 0.005 Grab 0.01 KONELABCLS 37
Nitrate (as N) = 0.13 Grab 0.1 KONELABCLS 39
Total Phosphorous (as P) = 0.067 Grab 0.01 CLS 151
OrthoPhosphate (as P) = 0.01 Grab 0.01 KONELABCLS 35
Sulphate (SO4) = 5 Grab 5 KONELABCLS 88
Phenols (Sum) = 5 Grab 5 SPE/GCMS
Additional Comments:
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 10
WWD Licence Application Annex I
TABLE F.1(i)(b): SURFACE/GROUND WATER MONITORING (Dangerous Substances)
Primary Discharge Point
Discharge Point Code: SW-1MONITORING POINT CODE: aSW-1uGrid Ref (12 digits, 6E, 6N) 154625 / 293460
Parameter Results (µg/l) Samplingmethod
Limit ofQuantitation
Analysismethod /technique
22/07/09
Atrazine = 0.04 Grab 0.04 GC/MS
Dichloromethane = 1 Grab 1.0 GCMS,(USEPA8260B)
Simazine = 0.04 Grab 0.04 GC/MS
Toluene = 1 Grab 1.0 GCMS,(USEPA8260B)
Tributyltin = 0.02 Grab 0.02 GC
Xylenes = 1 Grab 1.0 GCMS,(USEPA8260B)
Arsenic = 1 Grab 0.5 ICP-MS CLS129
Chromium = 0.6 Grab 0.5 ICP-MS CLS129
Copper = 2 Grab 1.0 ICP-MS CLS129
Cyanide = 100 Grab 100 COLORIMETRIC
Flouride = 100 Grab 100 LC
Lead = 0.5 Grab 0.5 ICP-MS CLS129
Nickel = 0.6 Grab 0.5 ICP-MS CLS129
Zinc = 5 Grab 5 ICP-MS CLS129
Boron = 11 Grab 10 ICP-MS CLS129
Cadmium = 0.5 Grab 0.5 ICP-MS CLS129
Mercury = 0.05 Grab 0.05 ICP-MS CLS103
Selenium = 0.5 Grab 0.5 ICP-MS CLS129
Barium = 85 Grab 0.5 ICP-MS CLS129
Additional Comments:
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application
F.2 Tabular Data on Drinking Water Abstraction Point(s)
Attachment F.2
ABS_CD AGG_SERVED ABS_VOL PT_CD DIS_DS EASTING NORTHING VERIFIED
Abstraction Code
Agglomeration ServedAbstraction volume in
M³/day
Point Code Provide label
ID's
Distance Downstream in
meters from Emission Point to Abstraction Point
6E-digit GPS Irish National
Grid Reference
6N-digit GPS Irish National
Grid Reference
Y = GPS used
N = GPS not used
Lough Gara
North Roscommon Regional Water
Supply Scheme P.E. 5,750
7,264m3/day
North Roscommon
Regional Water SupplyAbstraction
Point
23,000m 169818 295828 Y
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Aras An Chontae,The Mall, Castlebar, Co. Mayo, IrelandTel: (094) 904 7149Fax: 094 904 7192
Mayo County Council G.I.S. Section
Includes Ordnance Survey Ireland data reproduced under OSi Licence number 2009/17 CCMA / Mayo County Council. © Ordnance Survey Ireland , 2009.
Legend
North Roscommon Regional Water SupplyAbstraction Point
Agglomeration Boundary
Waste Water Treatment PlantSite Boundary
Primary Discharge Point
Drg. Title:
Kilmovee Wastewater Treatment PlantAbstraction Point
Project:
Waste Water Discharge Certificate Application
Scale: Date:
Drg. Nr: Rev:
Drawn By: Checked By: Approved By:
1:55,000 17/08/09
Map F.2 A
C Worsfold F Jennings T.ReidyFor ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment G.1
G.1 Compliance with Council Directives Kilmovee wastewater treatment plant and agglomeration were planned and designed in such a way that the emissions from the agglomeration would comply with and not result in the contravention of all relevant Council Directives. All upgrades, expansions and improvements to Kilmovee Waste Water Treatment Plant and agglomerations in the future will ensure that the emissions from the agglomeration would comply with and not result in the contravention of the following Directives;
Dangerous Substance Directive 2006/11/EC Water Framework Directive 2000/60/EC Birds Directive 79/409/EEC Groundwater Directive 80/68/EEC & 2006/118/EC Drinking Water Directive 80/778/EEC Urban Waste Water Treatment Directive 91/271/EEC Habitats Directive 92/43/EEC Environmental Liabilities Directive 2004/35/EC Bathing Water Directive 76/160/EEC Shellfish Directive 79/923/EEC
Dangerous Substances Directive 2006/11/EC This Directive is transposed into Irish law by the Water Quality (Dangerous Substances) Regulations, 2001 (S.I. No. 12 of 2001) Pesticides and Solvents Substances standards and Metal and other Substances standards, listed in the Standards Schedule of the Regulations are related to analysis data from upstream and downstream of the Kilmovee primary discharge on the Kilmovee River. The primary outfall SW1(P) was monitored for relevant substances as part of the wastewater discharge certificate application. It is proposed to monitor this outfall on a biannual basis. The results are contained in Attachments D.1 & F.1
Attachment D.1(i)(c) Page 4 Attachment F.1(i)(b) Page 8 Attachment F.1(i)(b) Page 10
G.1 Page 1 of 4
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment G.1
Water Framework Directive 2000/60/EC
This Directive is transposed into Irish law by the European Communities (Water Policy) Regulations, 2003-2008
A draft River Basin Management Plan for to the Shannon International River Basin District has been produced in accordance with the requirements of the Water Framework Directive. (To download a copy www.shannonrbd.com). The Shannon International River Basin District is cross-border; partly in Ireland and partly in Northern Ireland. Only a very small portion of the Shannon International District lies in Northern Ireland. Consequently the drafting of this plan has been led by the authorities in Ireland. Full consultation has been maintained with the authorities in Northern Ireland, who are represented on the Shannon District’s Steering Group. This draft plan is issued by the county councils Cavan, Clare, Cork, Galway, Kerry, Laois, Letrim, Limerick, Longford, Mayo, Meath, Offaly Roscommon, Sligo, Tipperary North, Tipperary South and Westmeath and Limerick City Council.
If adopted, Mayo County Council will pay regard to this Plan in its management of Kilmovee Waste Water Treatment Plant.
Birds Directive 79/409/EEC This Directive is transposed into Irish law by the European Communities (Conservation of Wild Birds) Regulations, 1999-2006 There are no SPA’s in close proximity to the Kilmovee Waste Water Treatment Plant outfall. Groundwater Directive 80/68/EEC & 2006/118/EC This Directive is transposed into Irish law by the Protection of Groundwater Regulations, 1999 (S.I. No. 41 of 1999) There are no direct groundwater discharges from the Kilmovee Waste Water Treatment Plant and agglomeration.
G.1 Page 2 of 4
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment G.1
Drinking Water Directive 80/778/EEC This Directive is transposed into Irish law by the European Communities (Drinking Water) (No.2) Regulations, 2007 (S.I. No. 278 of 2007) There is no surface water abstraction point in close proximity to the Kilmovee Waste Water Treatment Plant and agglomeration. There is a drinking water abstraction point from Lough Gara in County Roscommon which is approximately 23,000m downstream from the Kilmovee WWTP. Urban Waste Water Directive 91/271/EEC This Directive is transposed into Irish law by the Urban Waste Water Treatment Regulations, 2001 (S.I. No. 254 of 2001) The primary outfall SW1(P) was monitored for relevant substances as part of the wastewater discharge certificate application. It is proposed to monitor this outfall on a biannual basis. The results are contained in Attachments D.1 & F.1
Attachment D.1(i)(b) Page 3 Attachment F.1(i)(a) Page 7 Attachment F.1(i)(a) Page 9
Kilmovee waste water treatment plant discharges to the Kilmovee River and this is not listed as Salmonoid or Nutrient Sensitive under the Regulations. Other provisions of the Regulations, in relation to collection systems and treatment, are adhered to. Habitat’s Directive 92/43/EEC This Directive is transposed into Irish law by the European Communities (Natural Habitats) Regulations, 1997-2005 There are no SAC’s in close proximity to the Kilmovee Waste Water Treatment Plant outfalls.
G.1 Page 3 of 4
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
Kilmovee Waste Water Discharge Certificate Application Attachment G.1
G.1 Page 4 of 4
Bathing Water Directive76/160/EEC This Directive is transposed into Irish law by the as transposed into Irish Law by Bathing Water Quality Regulations, 2008 (S.I. No. 79 of 2008) There are no designated Bathing Waters in proximity to the Kilmovee Waste Water Treatment Plant and agglomeration. Environmental Liabilities Directive 2004/35/EEC This Directive is transposed into Irish law by the as transposed into Irish Law by the European Communities (Environmental Liability) Regulations 2008 (S.I. No. 547 of 2008). All upgrades, expansions and improvements to Kilmovee Wastewater Treatment Plant and agglomerations in the future, will ensure that the emissions from the agglomeration would comply with and not result in the contravention of these Regulations. Shellfish Directive 79/923/EEC This Directive is transposed into Irish law by the European Communities (Quality of Shellfish Waters) Regulations, 2006 (S.I. No. 268 of 2006) There are no designated shellfish waters in proximity to the Kilmovee Waste Water Treatment Plant and agglomeration although it is at the upper reaches of the West Shannon catchment area: West Shannon which is approximately 100 miles away includes the following designated shellfish areas:
Ballylongford Poulnasharry Bay Carrigaholt Rinevella
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 11
WWD Licence Application Annex II
Annex 2: Check List For Regulation 16 Compliance
Regulation 16 of the waste water discharge (Authorisation) Regulations 2007 (S.I. No. 684 of 2007) sets out the information which must, in all
cases, accompany a discharge licence application. In order to ensure that the application fully complies with the legal requirements of regulation 16
of the 2007 Regulations, all applicants should complete the following.
In each case, refer to the attachment number(s), of your application which contains(s) the information requested in the appropiate sub-article.
Regulation 16(1)In the case of an application for a waste water discharge licence, the application shall -
Attachment Number Checked by Applicant
(a) give the name, address, telefax number (if any) and telephone number of theapplicant (and, if different, of the operator of any treatment plant concerned) and theaddress to which correspondence relating to the application should be sent and, if theoperator is a body corporate, the address of its registered office or principal office,
Not Applicable No
(b) give the name of the water services authority in whose functional area the relevantwaste water discharge takes place or is to take place, if different from that of theapplicant,
Not Applicable No
(c) give the location or postal address (including where appropriate, the name of thetownland or townlands) and the National Grid reference of the location of the wastewater treatment plant and/or the waste water discharge point or points to which theapplication relates,
Not Applicable No
(d) state the population equivalent of the agglomeration to which the application relates, Not Applicable No
(e) specify the content and extent of the waste water discharge, the level of treatmentprovided, if any, and the flow and type of discharge,
Not Applicable No
(f) give details of the receiving water body, including its protected area status, if any, anddetails of any sensitive areas or protected areas or both in the vicinity of thedischarge point or points likely to be affected by the discharge concerned, and fordischarges to ground provide details of groundwater protection schemes in place forthe receiving water body and all associated hydrogeological and geologicalassessments related to the receiving water environment in the vicinity of thedischarge.
Not Applicable No
(g) identify monitoring and sampling points and indicate proposed arrangements for themonitoring of discharges and, if Regulation 17 does not apply, provide details of thelikely environmental consequences of any such discharges,
Not Applicable No
(h) in the case of an existing waste water treatment plant, specify the sampling datapertaining to the discharge based on the samples taken in the 12 months precedingthe making of the application,
Not Applicable No
(i) describe the existing or proposed measures, including emergency procedures, toprevent unintended waste water discharges and to minimise the impact on theenvironment of any such discharges,
Not Applicable No
(j) give particulars of the nearest downstream drinking water abstraction point or pointsto the discharge point or points,
Not Applicable No
(k) give details, and an assessment of the effects, of any existing or proposed emissionson the environment, including any environmental medium other than those into whichthe emissions are, or are to be made, and of proposed measures to prevent oreliminate or, where that is not practicable, to limit any pollution caused in suchdischarges,
Not Applicable No
(l) give detail of compliance with relevant monitoring requirements and treatmentstandards contained in any applicable Council Directives of Regulations,
Not Applicable No
(m) give details of any work necessary to meet relevant effluent discharge standards anda timeframe and schedule for such work.
Not Applicable No
(n) Any other information as may be stipulated by the Agency. Not Applicable No
Regulation 16(3)Without prejudice to Regulation 16 (1) and (2), an application for a licence shall beaccompanied by -
Attachment Number Checked by Applicant
(a) a copy of the notice of intention to make an application given pursuant to Regulation9,
Not Applicable No
(b) where appropriate, a copy of the notice given to a relevant water services authorityunder Regulation 13,
Not Applicable No
(c) Such other particulars, drawings, maps, reports and supporting documentation as arenecessary to identify and describe, as appropriate -
Not Applicable No
(c) (i) the point or points, including storm water overflows, from which a discharge ordischarges take place or are to take place, and
Not Applicable No
(c) (ii) the point or points at which monitoring and sampling are undertaken or are to beundertaken,
Not Applicable No
(d) such fee as is appropriate having regard to the provisions of Regulations 38 and 39. Not Applicable No
For ins
pecti
on pu
rpose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
WWD Licence Application - Kilmovee - Page: 12
WWD Licence Application Annex II
Regulation 16(4)An original application shall be accompanied by 2 copies of it and of all accompanyingdocuments and particulars as required under Regulation 16(3) in hardcopy or in an electronicor other format as specified by the Agency.
Attachment Number Checked by Applicant
1 An Original Application shall be accompanied by 2 copies of it and of allaccompanying documents and particulars as required under regulation 16(3) inhardcopy or in electronic or other format as specified by the agancy.
Not Applicable No
Regulation 16(5)For the purpose of paragraph (4), all or part of the 2 copies of the said application andassociated documents and particulars may, with the agreement of the Agency, be submitted inan electronic or other format specified by the Agency.
Attachment Number Checked by Applicant
1 Signed original. Not Applicable No
2 2 hardcopies of application provided or 2 CD versions of application (PDF files)provided.
Not Applicable No
3 1 CD of geo-referenced digital files provided. Not Applicable No
Regulation 17Where a treatment plant associated with the relevant waste water works is or has beensubject to the European Communities (Environmental Impact Assessment) Regulations 1989to 2001, in addition to compliance with the requirements of Regulation 16, an application inrespect of the relevant discharge shall be accompanied by a copy of an environmental impactstatement and approval in accordance with the Act of 2000 in respect of the said developmentand may be submitted in an electronic or other format specified by the Agency
Attachment Number Checked by Applicant
3 2 CD versions of EIS, as PDF files, provided. Not Applicable No
1 EIA provided if applicable Not Applicable No
2 2 hardcopies of EIS provided if applicable. Not Applicable No
Regulation 24In the case of an application for a waste water discharge certificate of authorisation, theapplication shall –
Attachment Number Checked by Applicant
(a) give the name, address, telefax number (if any) and telephone number of theapplicant and the address to which correspondence relating to the application shouldbe sent and, if the operator of the waste water works is a body corporate, the addressof its registered office or principal office
Section B.1 Yes
(b) give the name of the water services authority in whose functional area the relevantwaste water discharge takes place or is to take place, if different from that of theapplicant,
Not Applicable Yes
(c) give the location or postal address (including where appropriate, the name of thetownland or townlands) and the National Grid reference of the location of thedischarge point or points to which the application relates,
Section B.2 Yes
(d) state the population equivalent of the agglomeration to which the application relates, Section B.8 (i) Yes
(e) in the case of an application for the review of a certificate, specify the referencenumber given to the relevant certificate in the register,
Not Applicable Yes
(f) specify the content and extent of the waste water discharge, the level of treatmentprovided and the flow and type of discharge,
Attachement D.1 Yes
(g) give details of the receiving water body, its protected area status, if any, and details ofany sensitive areas or protected areas, or both, in the vicinity of the discharge point orpoints or likely to be affected by the discharge concerned,
Attachment D.1(i)(a) &Attachment F.1
Yes
(h) identify monitoring and sampling points and indicate proposed arrangements for themonitoring of discharges and of the likely environmental consequences of any suchdischarges,
Attachment E.2including Map,Attachment E.3 & F.1
Yes
(i) in the case of an existing discharge, specify the sampling data pertaining to thedischarge based on the samples taken in the 12 months preceding the making of theapplication,
Attachment D.1(i)(b)&(c)
No
(j) describe the existing or proposed measures, including emergency procedures, toprevent unauthorised or unexpected waste water discharges and to minimise theimpact on the environment of any such discharges,
Attachment G.1 No
(k) give particulars of the location of the nearest downstream drinking water abstractionpoint or points to the discharge point or points associated with the waste water works,
Attachment F.2 Yes
(l) give details of any designation under any Council Directive or Regulations that applyin relation to the receiving waters,
Attachment G.1 No
(m) give details of compliance with any applicable monitoring requirements and treatmentstandards,
Attachment G.1 No
(n) give details of any work necessary to meet relevant effluent discharge standards anda timeframe and schedule for such work,
Not Applicable Yes
(o) give any other information as may be stipulated by the Agency, and Not Applicable Yes
(p) be accompanied by such fee as is appropriate having regard to the provisions ofRegulations 38 and 39.
Section B.8 (iii) Yes