Post on 17-Apr-2020
KEYYANG PRECISION
Green Energy Company
01. Turbocharger is…
Enhance Fuel Efficiency
Emission Reduction incl. Co2
Utilize Wasting Energy
Improve Power Output
Utilizing exhaust gas from engine, turbocharger generate highly compressed air and inject
to engine chamber. This compressed air result stronger explosion power with higher fuel
efficiency and complete combustion with reduced environmental pollutant.
Turbocharger works,
Turbine Compressor
02. Related Industries and Applications
Casting Industry
Precision processing
Industry
Air Compressor Other Turbo -Machinery
Locomotive
Aircraft
Medical Device
Industrial Engine
Heavy Equipment Agriculture-Machinery Shipbuilding Vehicle Truck
Ultra-High Heat Resistant
Material I Industry
Power plant ‘s Turbine
Turbocharger Related Industries
03. Company Profile
▣ Established : 17 Oct. 1994
▣ Founder & CEO : Byung-kee Chung
▣ Employees : 183 (R&D : 48 Engineers, 26%)
▣ Turnover : KRW 113.6 Bil. [USD 110 Mil.)(FY 2016)
▣ Headquarter : Gimcheon-si, Gyeongsangbuk-do
- Factory #1 : High-tech Welding, Precision Balancing, & Machining Lines
- Factory #2 : Center Section Assembly & Balancing, General Turbocharger Assembly Line
- R&D Center : R&D, Test evaluation , Prototype Production
High-Performance Tuning Turbo Development
▣ Seoul Office : Sales, Finance, R&D Center
▣ Ulsan, Pyeongtaek Factories : Modular assembly / Quality Management
▣ Overseas Subsidiaries
- Shanghai Office : Sales (Oct. 2013)
- Wuxi Factory : Production (Jun. 2014)
1st Factory
2nd Factory
China Wuxi Factory
R&D Center
Shanghai Office
[Sales]
Seoul Office
Sales HQ
R&D Center
Finance
Pyeongtaek Factory
Module assembly
Gimcheon HQ & Factory
R&D Center
Management Support HQ
Accounting
Production HQ
Quality HQ
Ulsan Factory
Module assembly
Wuxi Factory [Production]
04. Company Profile - Location
04. Company Profile - Production Capacity
Production Capacity of
1st Factory and 2nd Factory
0.85M / year
[Machining, C/R & T/C Assembly]
Gimcheon Factory
1st Factory
2nd Factory
R&D Center
3rd Factory & R&D Center (Plan to construct in 2021
Production Capacity of 3rd Factory
(Start of construction in 2019)
2.15M / year
[Machining, C/R & T/C Assembly]
Total Production Capacity
3M / year
1994 2000 2005 2008 2013 2022
Foundation Production
Technology Key Components
Procurement
Core Technology
Development Multi-national
Operation
Global Top
Turbocharger Maker
• Entering
Turbocharger
market
• Technical
Cooperation
with Mitsubishi
Heavy
Industries
• Localization of
key components
assembling
technology
• Localizing of
core
component’s
material and
machining
• Establishment of
R&D Center and
second facility
• Commended,
Advanced
Technology
Center (ATC)
• Extended local
application
• Global Production
Network
• Customer Oriented local supply & service
to Global OEMs
• GM 2014 SOY Award
• MOU With TAMU
• Technical cooperation with FEV
• Cooperation of overseas R&D Centers
2017
04. Company Profile - Our History
• Simple
Assembly
04. Company Profile - Organization
CEO
Management HQ Quality HQ Sales HQ
Auditor
BOD
Admin. Team
IT Team
Accounting Team
SQE Team
QM Team
Sales Team
Sales Management
Team
Production
Management Team
Production HQ
Production Team
Production
Engineering Team
R&D Center
AE Team
Advanced Design
Team
Mass Production
Design Team
Planning Team
Test & Evaluation
Team
Proto Sample
Procurement Team
Parts Sourcing
Team Wuxi Corporation
Shanghai
Corporation
Finance Team
Expecting Higher Growth Rate for Turbocharged Vehicle
General Vehicle sales Predictions Turbo Vehicle sales Prediction
05. Market Outlook – Growth Forecast
Average growth rate 4%
Average growth rate 11%
05. Market Outlook – Growth Potential
2019
41%
2014
23%
2019
38%
2014
21%
CHINA NORTH AMERICA
INDIA JAPAN KOREA EUROPE
2019
48%
2014
46%
2019
23% 2014
18%
2019
45% 2019
24% 2014
42% 2014
17%
2019
69%
2014
67%
SOUTH AMERICA
Turbo Vehicle Market Forecasts by Regions
06. Keyyang Records
Diesel WG Turbocharger
Diesel VG Turbocharger
Gasoline WG Turbocharger
“ WG Turbocharger for Gasoline and Diesel, VG Turbocharger for Diesel”
Hyundai Sonata
Product Segments in Last 6 Years
Increase of WG Turbocharger for Gsaoline
Hyundai i20
CHEVROLET
Captiva
2012 2013 2014 2015 2016 2017
Technical Partnership with Research Institutes
• Expending international technical cooperation network including TAMU in US, VKI in Belgium, and
FEV in Germany.
• As a member of commissioner group, we support Turbomachinery Research Consortium of TAMU.
• Building a strong Academic-Industrial cooperation with various Korean Universities and research
centers to update technical capabilities.
06. Academic-Industrial Cooperation
Technology Development Agreement with TAMU
• Minister of the Ministry of Trade, Industry & Energy had attended at the signing ceremony.
• Agreement for 5 years Joint Research Program with Texas A & M Univ.
• Program includes Rotor Dynamics Technology, Aerodynamic Analysis, and NVH of High-speed rotating
parts
06. Academic-Industrial Cooperation
Investment for Technology Development
• Investment in the highest spec. performance testing equipment and cutting-edge R&D Facilities
• KRW 6.5 billion [USD 6 Mil.] of average annual R & D investment, (Abt. 5% of sales)
-> Approximately KRW 28.4 billion [USD 27 Mil.] (Abt. 11% by 2020)
07. R&D – Investment
• Qiangyi Automotive Parts(Wuxi) Co., Ltd.
• Site : No. 6-12 Changhui Road, Wuxi Huishan Economic Development Zone
• Area :4,800㎡ ( 51,700 sq. ft. )
• Production Capacity: 1st stage 1.75 mil units/Yr,
2nd stage 3 mil units/Yr
• Established in Jun. 2014
08. Establishment of global production base
Keyyang at Shanghai Motor Show in 2015 & 2017
9. Drive into New Market
• Xcargot turbo for high-end performance engine also exhibited
[200 bhp ~ 800 bhp]
Serving Chinese market with cutting-edge technology
• Signing a business agreement with Shanghai Automotive (SAIC), one of 3 main
automotive groups in China
• Signing a partnership contract with Dongfeng Motor, an emerging automotive group in
China
• Supply to Beijing Automotive (BAIC) – Hyundai Motors (HMC), 4th Qtr., 2019
• Supply to Dongfeng Motor – Kia, 4th Qtr., 2019
09. Drive into New Market
Our cutting-edge technology acknowledged globally
• GM SOY AWARD 2014 & 2016 『SUPPLIER OF THE YEAR』 [General Motors in Detroit ]
- Keyyang is the first and only awarded Turbocharger Supplier for GM
• GM gave TASL (Technically Approved Supplier List) in the turbocharger design field
10. R&D - Achievement
▶ GM SOY : Award for 50 best companies of GM’s global 4000 companies.
▶ GM TASL : GM’s technical inspection system to register and approve as a global supplier.
Outstanding Engine Performance with Keyyang’s Technology
Hyundai / Kia awarded Top 10 Engines in America, 2017 [KAPPA 1.4L gasoline turbo Eng.]
Dongfeng awarded Top 10 Engines in China, 2017 [126 A 1.5L gasoline turbo Eng.]
10. R&D - Achievement
[ KAPPA 1.4L gasoline turbocharger ] [ 126A gasoline turbocharger ]
Keyyang Precision Co., Ltd.
- Green Energy Company -
Thank you