Keyston Installs last 90 days

Finished work

Tight Schedules½ tile removal 1/8 mastic machine removal removal procedure was changed from Husqvarna 820 to the El Diablo. Keyston finished ahead of schedule with no challenges. Keyston did isolation , Negative air flow and constant monitor to ensure safety

Difference is in the Details and quality

PharmaceuticalMarking of patches Blue by Customer additional done by Keyston

Whole area done instead of 100 patches customer very pleased new standard

Pharmaceutical

Preparation done with Husqvarna 820 Epoxy Grout coat prior to polishing steps due to the poor quality of concrete.

DetailsCove adhesive on walls prior to Keyston start up

Cove after cut out new steel Cleaned walls

CovingCondition start- Keyston requested corners to be finished and in fill t Response no time in schedule Keyston suggested a 45% Hospital cove instead of a radius cove. Customer issued a change order for material and labor difference and a new plant standard established.

Custom Coving Borders and walkways

Expert Project ManagementConcrete elevations off ½” to ¾ over 3’ coves recessed ¾ to 1 “ Finished Floor

Food Manufacturing

Food

Tough Conditions

Husqvarna Prep Urethane with Aluminum oxide

Containment pit

r

Finished Pit- job was stopped due to steel structure above being unsafe. TM, Plant Manager and Project Manager appreciated the PM brought in a team o support the structure with Steel Cables.

Thank You

Containment Pit Heavy Duty Flooring with Line Striping