Jon Wakelin, Physics & ACRC
Bristol
2 ACRC
• Server Rooms– PTR – 48 APC water cooled racks (Hot aisle, cold aisle)– MVB – 12 APC water cooled racks (Hot aisle, cold aisle)
• HPC– IBM, ClusterVision, ClearSpeed.
• Storage – 2008-2011?– Petabyte scale facility
• 6 Staff– 1 Director, 2 HPC Admins, 1 Research Facilitator– 1 Visualization Specialist, 1 e-Research Specialist– (1 Storage admin post?)
3 ACRC Resources
• Phase 1 – ~ March 07– 384 core - AMD Opteron 2.6 Ghz dual-socket dual-core system, 8GB Mem.– MVB server room– CVOS and SL 4 on WN. GPFS, Torque/Maui, QLogic InfiniPath
• Phase 2 - ~ May 08– 3328 core - Intel Harpertown 2.8Ghz dual-socket, quad-core, 8GB Mem.– PTR server room - ~600 meter from MVB server room.– CVOS and SL? WN. GPFS, Torque/Moab, QLogic InfiniPath
• Storage Project (2008 - 2011)– Initial purchase of additional 100 TB for PP and Climate Modelling groups– PTR server room – Operational by ~ sep 08.– GPFS will be installed on initial 100TB.
4 ACRC Resources
184 Registered Users
54 Projects
5 Faculties
• Eng
• Science
• Social Science
• Medicine & Dentistry
• Medical & Vet.
5 PP Resources
• Initial LCG/PP setup– SE (DPM), CE and 16 core PP Cluster, MON and UI– CE for HPC (and SE and GridFTP servers for use with ACRC facilities)
• HPC Phase 1 – PP have a 5% target fair-share, and up to 32 concurrent jobs– New CE, but uses existing SE - accessed via NAT (and slow).– Operational since end of Feb 08
• HPC Phase 2– SL 5 will limit PP exploitation in short term.– Exploring Virtualization – but this is a medium- to long-term solution– PP to negotiate larger share of Phase 1 system to compensate
• Storage– 50TB to arrive shortly, operational ~ Sep 08 – Additional networking necessary for short/medium-term access.
6 Storage
• Storage Cluster – Separate to HPC cluster – Will run GPFS– Being installed and configure ‘as we speak’
• Running a ‘test’ Storm SE– This is the second time
• Due to changes in the underlying architecture
– Passing simple SAM SE tests• But, now removed from BDII
– Direct access between storage and WN• Through multi-cluster GPFS (rather than NAT)
• Test and Real system may differ in the following ways…– Real system will have a separate GridFTP server– Possibly NFS export for Physics Cluster– 10Gb NICs (Myricom Myri10G PCI-Express)
7
8
9
10
11
12
13
145510-48
5510-48
5510-48
5510-48
5510-24
5510-48
5510-48
5510-48
5510-48
5530
8683
8683
8683
8683
86838648 GTR
5510-48
5510-48
5510-48
5510-48
5510-24
5510-48
5510-48
5510-48
5510-48
5530
5510-48
5510-48
5510-48
x3650 + Myri-10G
x3650 + Myri-10G
x3650 + Myri-10G
x3650 + Myri-10G
Storage
HPC Phase 2
HPC Phase 1
MVB Server Room
PTR Server Room
NB: All components are Nortel
155510-48
5510-48
5510-48
5510-48
5510-24
5510-48
5510-48
5510-48
5510-48
5530
8683
8683
8683
8683
86838648 GTR
5510-48
5510-48
5510-48
5510-48
5510-24
5510-48
5510-48
5510-48
5510-48
5530
5510-48
5510-48
5510-48
x3650 + Myri-10G
x3650 + Myri-10G
x3650 + Myri-10G
x3650 + Myri-10G
Storage
HPC Phase 2
HPC Phase 1
MVB Server Room
PTR Server Room
5530
NB: All components are Nortel
16
17 SoC
• Separation of Concerns– Storage/Compute managed independently of Grid Interfaces– Storage/Compute managed by dedicated HPC experts.– Tap into storage/compute in the manner the ‘electricity grid’ analogy suggested
• Provide PP with centrally managed compute and storage– Tarball WN install on HPC– Storm writing files to a remote GPFS mount (devs. and tests confirm this)
• In theory this is a good idea - in practice it is hard to achieve– (Originally) implicit assumption that admin has full control over all components
• Software now allows for (mainly) non-root installations– Depend on others for some aspects of support
• Impact on turn-around times for resolving issues (SLAs?!?!!)
18 General Issues
• Limit the number of task that we pass on to HPC admins– Set up user, ‘admin’ accounts (sudo) and shared software areas– Torque - allow remote submission host (i.e. our CE)– Maui – ADMIN3 access for certain users (All users are A3 anyway)– NAT
• Most other issues are solvable with less privileges– SSH Keys – RPM or rsync for Cert updates– WN tarball for software
• Other issues– APEL accounting assumes ExecutingCE == SubmitHost (Bug report)– Work around for Maui client - key embedded in binaries!!! (now changed)– Home dir path has to be exactly the same on CE and Cluster.– Static route into HPC private network
19 Q’s?
• Any questions…
• https://webpp.phy.bris.ac.uk/wiki/index.php/Grid/HPC_Documentation
• http://www.datadirectnet.com/s2a-storage-systems/capacity-optimized-configuration
• http://www.datadirectnet.com/direct-raid/direct-raid
• hepix.caspur.it/spring2006/TALKS/6apr.dellagnello.gpfs.ppt