Janet Update
GridPP – 22 Aug 2014 - Ambleside
David Salmon
Topics
•Jisc / Janet status•Janet6•GriddPP Networking forward look•Test networks•E-Infrastructure & industry – Janet Reach…•Cloud & datacentre comments
Jisc / Janet
•Two companies– Jisc - now a charity – the holding company– Jisc Collections and Janet – a wholly owned subsidiary
•Governance– Universities UK, Guild HE, Association of Colleges (AoC) - 30% each– Institutional - 10%
•Janet network charge / Jisc subscription model– Jisc wrote to all organisations connected to Janet– Charging model changed – commencing this August (14/15)– Details on Jisc web site
•Some rationalisation taking place– See Jisc web site – “Front of House”
Janet 6
•Optical 40/100G•Long term – 10+ years for fibre leases•Transmission equipment refresh after ~7+ years•Roadmap to next capacity increment per wavelength (400G ?)•More flexible optical architecture•Direct management of optical infrastructure•Huge capability for additional capacity•Continued integration of Regions
Janet6 and e-Infrastructure fibre
GridPP Networking forward look
•Paper from GridPP management board– Very helpful – thanks !
•Discussions with Janet operations colleagues to incorporate into planning
Site connectivity to Janet
•Current Janet policy - provide IP capacity according to need•NO special arrangements for any T2 site - all Janet capacity
provided to organisations– some sites have local arrangements permitting PP groups to route traffic
selectively over site connections to Janet
•Janet Network inherently very capable– enormous latent capacity– does cost money to enable this (and take time)
• light extra 40/100 Gbit/s wavelengths• Procure extra access circuits
London
•Brunel - *•Imperial - *•QM - *•RHUL - *•UCL - *
•Key: * means connected to Janet fibre
NorthGRID
•Lancaster - *•Liverpool
– NNW fibre, should remain on fibre following regional reprocurement
•Manchester - *•Sheffield
– subject to YHMAN reprocurement
ScotGRID
•Edinburgh (ECDF - ACF) - *•Glasgow - *•Durham
– regional re-procurement - looking into fibre options
SouthGRID
•Birmingham -*•Bristol -*•Cambridge -*•(Culham) -*•Oxford -*•RAL -*•Sussex – Janet fibre to Hove – University has Dark Fibre to
connect
Ones to watch – no specific concerns though
•(Liverpool)•Sheffield•Durham
•NB – not on fibre doesn’t mean poor service !– But, access circuits needed to provide connection– Extra capacity implies eithe rupgrades or additional circuits
Janet Testbed facilities
•Aurora2 / NDFIS•SDN overlay
NDFIS Topology
NDFIS Topology
NPL
Harwell Oxford Campus – Satellite applications
Broader collaboration – NPL & Europe
• SDNs / Openflow• Strong theme at the conference (other talks)• Desire to collaborate• Broader UK discussions• Maybe 10+ UK Universities interested in some
way• Janet will help
– modest Openflow overlay to interconnect/interact• Research Council funded projects
– TOUCAN – EPSRC Programme Grant• Bristol, Edinburgh, Lancaster• £12M (£6M+£6M) – 5 Years• Photonic – Layer2 – Access (Wireless +??)
– Other smaller individual projects
Connecting “Testbeds”
Four node topology
LondonBristol
North
Edinburgh
Lancaster
Bristol
GEANT…World
Midlands
• Maybe 2 physical 10G paths per node
• Others would be VPNs/logical paths
• Not determined precise configuration yet
• NOT Exclusive, but only TOUCAN lead sites shown
SDN Overlay & Aurora2• Janet service components
• Layer 3 (IP)– Tunnels/VPNs
• Layer 2– Janet “Lightpaths”
• Ethernet / MPLS– committed capacity– VPNs – uncommitted capacity -
future• Layer 1
– Optical: whole wavelengths– 40G / 100G in coreLondo
nBristol
North
Edinburgh
Lancaster
BristolGEANT…World
Janet - e-Infrastructure & Industry
•Outreach with moonshot pilot (AAI)•Connecting to Janet – Janet Reach
– State aid compliant scheme– Industry organisation must apply
• Innovative project• Meet state aid funding proportionalities
– Janet connection value / total project value• Should be a high-capacity need
– Scheme operating on 2 monthly cycles until around April 2015 (perhaps a little longer)
Datacentres
•Slough– Procurement & contracting complete– Janet Network provision in progress– Major centre on Janet– Very open - Tenants install their own racks & equipment
•Anchor tenants– QM, Kings, LSE, UCL, Crick, Sanger– Open to all
•Strong interest, probably more to come…
Cloud
•Building on brokerage work in past•Looking a central procurement of cloud “capacity/capability”•Cost savings through economies of scale ?•Soliciting requirements – what do people want ?
– c.f. yesterdays discussions– Is there a requirement for elastic expansion into commercial capacity ?– Very interested in peoples views here