JANE POXON Business Development Manager British Gas.

Post on 16-Jan-2016

218 views 0 download

Tags:

Transcript of JANE POXON Business Development Manager British Gas.

JANE POXON

Business Development Manager

British Gas

THE PRODUCT

This unique “Plug and Save” technology and production is supported and developed by

World class companies.

CE marked and accredited with all the necessary safety requirements

Engineers from Copenhagen have developed and designed the highly efficient turbine blades for Windsave

DOMESTIC APPLICATION

• OUTPUT OF 1KILOWATT • ELECTRICITY FED DIRECTLY

INTO THE CUSTOMERS INSTALLATION

• DOES NOT REQUIRE BATTERIES

• VIRTUALLY NO VIBRATION OR NOISE

• PROVIDES ADDITIONAL INCOME THROUGH “GREEN DIVIDENDS”

• GRANTS AVAILABLE TOWARDS INSTALLATION COSTS.

THE

INSTALLATION

Plug ‘n’ Save

• USUALLY INSTALLED WITHIN HALF A DAY

• NO INTERNAL ADDITIONAL WIRING REQUIRED

• PLUG IN AND SAVE

New Planning Policy Statement 22 (PPS22): Renewable Energy

Local Authorities requesting guidance

General Permitted Development Order

PLANNING

PER UNITMaximum Generator Output (kilowatts/unit) 1Average Wind speed (metres/second) 5.7Average Output per Unit (kilowatt) 0.158Annual Output per site (kilowatt hours) 1,384

Annual Savings on Electricity (£) 103.80Annual Dividend from ROCs (£) 63.06TOTAL ANNUAL SAVINGS 166.86

Climate Change Levy reduction (£) 59.51(where applicable)

CALCULATED SAVINGS

THE UNSEEN SAVING

APPROX 30,000

LITRES OF

POISONOUS

CARBON DIOXIDE GAS

SALES AND

AFTER SALES

SALES AND AFTER SALES PRODUCT PREDICTED LIFE CYCLE 10 YEARS PLUS

STATUTORY GUARANTEE SCENARIOS.

POSSIBLE EXTENDED WARRANTY COVER

CARE PRODUCT SCENARIOS

ANY QUESTIONS