architectural portfolio
JAMES F. MOLLOYmolloyjrjames@gmail.com
917.797.9431
PROJECT: uNioN couNtY JuVeNile DeteNtioN ceNter
2
JAMES F. M
OLLOY, JR.
3
CLIENT: uNioN couNtYLOCATION: liNDeN, NJPROJECT TYPE: NeW coNStructioNSquARE FOOTAgE: 72,000 SfCONSTRuCTION COST: $27 millioNROLE: proJect DeSigNer
2011 NY-AIA DesIgN AwArDs CItAtIoN, 2010 worlD ArChIteCture News (wAN) effeCtIveNess AwArD; 2008 MerIt AwArD froM the NJ-AIA
located in a semi-urban portion of linden, this 80-bed facility was designed as a thin build-ing only one room deep-wrapping around a one-acre outdoor courtyard. By arrang-ing all spaces along a common, glass-walled corridor, daylight to the interior was maximized. this design also allowed the building to act as a secure perimeter, avoiding the use of a razor-rib-bon fence, and providing a more normative ex-perience for both the juveniles inside and the com-munity surrounding the facility. this normative environment, one promoting positive behavior and a smooth transition back into the community, was at the core of the design concept.
EXTERIOR OF GYMNASIUM
DETAIL AT GYMNASIUM GROUND FLOOR pLAN
SITE pLAN
EXTERIOR OF HOUSING UNITCOURTYARD AT GYMNASIUM
DAYROOM CLASSROOM
INDEX: DRAWING 1-A
INDEX: DRAWING 1-B
INDEX: DRAWING 1-C
PROJECT: lehigh couNtY courthouSe
4
JAMES F. M
OLLOY, JR.
5
CLIENT: lehigh couNtYLOCATION: alleNtoWN, paPROJECT TYPE: reNoVatioN/NeW coNStr. SquARE FOOTAgE: 170,00/80,000 SfCONSTRuCTION COST: $62 millioNROLE: JoB captaiN
the two prime objectives of this project were to re-clad the existing 170,000 square-foot facil-ity with a high performance curtain wall, and to provide 80,000 square-feet of new courtroom and support space. the expansion of the exist-ing courthouse also required a phased renova-tion of the occupied building providing increased efficiency between agencies in order to meet best practices of courts operation and code compliance. located in economically distressed allentown, the new county courts building provides a mod-ern courts facility, a pedestrian friendly plaza, and exuberant new entrance, confirming the countys commitment to the city of allentown.
VIEW FROM WEST HAMILTON STREET
VIEW FROM NORTH pENN STREET
COURTROOM INTERIORSECOND FLOOR LOBBY
pHASES OF CONSTRUCTION
ORIGINAL COURTHOUSE NEW CURTAIN WALL CONSTRUCTION
SOUTH AND EAST ELEVATIONS
FLOOR pLAN
INDEX: DRAWING 2-A
INDEX: DRAWING 2-B
INDEX: DRAWING 2-C
INDEX: DRAWING 2-D
PROJECT: BRONX FAMILY CRIMINAL COURTHOUSE
6
CLIENT: DaSNaY / DocLOCATION: BroNX, NYPROJECT TYPE: reNoVatioN/NeW coNStr.SquARE FOOTAgE: 750,000 SfCONSTRuCTION COST: $40 millioN ROLE: proJect DeSigNer/JoB captaiN
this 10-story limestone structure, designed in 1977, houses two separate courts, family and criminal, along with multiple city agencies in-cluding the District attorney and NYpD, as well as numerous non-profit agencies (legal aid, Safe horizons, etc). the prime objective here was to reprogram the facility, reuse vacated space, and renovate spaces to suit the following priorities: improve the arrest to arraignment process; pro-vide larger code compliant courtrooms to family court; improve criminal court efficiency; reallo-cate and expand non-profit agencies space; and provide flexible administrative/office space. in ad-dition to this extensive asbestos abatement was required throughout the building.
VIEW FROM EAST 161ST STREET & SHERIDAN AVENUE
EXISTING COURTROOM LOBBY DETAIL OF EXISTING COURTROOM
JAMES F. M
OLLOY, JR.
7
EXISTING SECOND FLOOR pLAN
NEW LOBBY VESTIBULE
pROpOSED ARREST TO ARRAIGNMENT LAYOUT
NEW ARRAIGNMENT COURT
ARRAIGNMENT COURT ELEVATION
INDEX: DRAWING 3-A
INDEX: DRAWING 3-B
INDEX: DRAWING 3-C
INDEX: DRAWING 3-D
PROJECT: HUDSON COUNTY JUSTICE CENTER SPACE NEEDS ASSESSMENT
8
JAMES F. M
OLLOY, JR.
9
CLIENT: huDSoN couNtYLOCATION: JerSeY citY, NJPROJECT TYPE: Space NeeDS aSSeSSmeNtSquARE FOOTAgE: 462,000COST: $300-$345 mil. (proJectioN) ROLE: proJect maNager
faced with an aging courts facility, hudson county required a new programmatic master plan includ-ing space needs for courts and county agencies; developing options that accommodate those needs; and providing a conceptual cost estimate for those options. in addition to the development of four site options, the needs assessment study also included a review of the existing condition of the hudson county administration Building, de-velopment of a room-by-room program with cur-rent and projected needs, and the potential park-ing needs of a new facility. the option selected involves a two-phase project estimated at $300 million.
SITE CIRCULATION STUDY
SUN pATH STUDY
OpEN USE STUDY
LAND USE STUDY
BRENNAN COURTHOUSE HUDSON COUNTY COURTHOUSE
SITE SECTION
ENTIRE pROGRAM IS HOUSED IN ONE BUILDING ON THE CURRENTLY AVAILABLE pARkING LOT, AND THE EXISTING
ADMINISTRATION BUILDING IS DEMOLISHED AFTERWARDS. THE SITE IS DEVELOpED LATER.OPTION 1 INSIDE THE BOX $302
COURTS AND COUNTY AGENCIES ARE RELOCATED TO A TEMpORARY FACILITY. EXISTING ADMINISTRATION BUILDING
IS DEMOLISHED, AND THE ENTIRE pROGRAM IS HOUSED IN ONE BUILDING. OPTION 2: OuTSIDE THE BOX $345
pROGRAM IS BUILT IN TWO pHASES. pHASE I INCLUDES ALL COURT pROGRAMS AND IS BUILT ON THE CURRENTLY
AVAILABLE pARkING LOT. pHASE II THE EXISTING BUILDING IS DEMOLISHED AND A SECOND BUILDING IS BUILT FOR
ALL COUNTY AGENCIES.
OPTION 3: CIVIC PLAZA $302
OPTION 4: NEW COuRTHOuSE SquARE $300
pROGRAM IS BUILT IN TWO pHASES. pHASE I INCLUDES ALL CRIMINAL AND CIVIL COURTS. pHASE II COUNTY AGEN-
CIES ARE pERMANENTLY RELOCATED OFF-SITE. THE EXISTING BUILDING IS DEMOLISHED AND A SECOND BUILDING IS
BUILT FOR THE FAMILY COURTS AND pROBATION.
Space Needs Assessment: Hudson County Justice Center July 08, 2008
R I C C I G R E E N E A S S O C I A T E S Dean Marchetto Architects P.C.
Space Program Summary
Component Current Need 2017 Need 2027 Need Courts County Agency Building Support Total Net
191,471 104,530 6,555
302,556
194,626 107,609 6,555
308,790
206,643 109,050 6,555
322,248
Grossing Factor Total Gross SF
1.55
468,962
1.55
478,625
1.55
499,484
INDEX: DRAWING 4-A
Space Needs Assessment: Hudson County Justice Center July 08, 2008
R I C C I G R E E N E A S S O C I A T E S Dean Marchetto Architects P.C.
Judicial Summary (New Building) Current Need
2017 2027
Assignment Judge Criminal Court Judges Civil Court Judges Family Court Judges Central Judicial Processing Judge Recall Judges
1 7 4 11 1 2
1 7 4 12 1 2
1 8 5 13 1 2
Total Supreme Court Judges 26 27 30
Courtroom Summary (New Building) Current Need
2017 2027
Large Criminal Courtroom Criminal Court Courtrooms Civil Court Courtrooms Family Court Courtrooms Central Judicial Processing Courtroom
2 8 4 11 1
2 8 4 12 1
2 9 5 13 1
Total Courtrooms 26 27 30
Space Program Summary INDEX: DRAWING 4-B
Space Needs Assessment: Hudson County Justice Center July 08, 2008
R I C C I G R E E N E A S S O C I A T E S Dean Marchetto Architects P.C.
Guiding Principles BUILDING DESIGN
Provides daylight to both courts and public waiting areas. Provides optimal functional configuration for both Courts and County Government. The size of the building is appropriate for the site and judicial function.
SECURITY
Provides a single point of entry for both public and staff. Provides separation of public, prisoner, & staff movement within the building. Allows secure parking on site for Judges and elected officials.
URBAN DESIGN
Reinforces urban fabric. Provides a major public amenity in the heart of Jersey City. Provides access that accommodates both pedestrian and vehicular traffic.
RELATIONSHIP TO SITE
Orientation of the building is appropriate for the site, its surroundings, and sustainable principles.
New building compliments and respects the historic character of the Brennan Courthouse. Site design elevates the status of the government campus.
INDEX: DRAWING 4-C
Space Needs Assessment: Hudson County Justice Center July 08, 2008
R I C C I G R E E N E A S S O C I A T E S Dean Marchetto Architects P.C.
Option 1
Option 2
Option 3 (phase I & II)
$ 286 Million
$ 290 Million
$ 300 Million
$ 300.2 Million
TOTAL PROJECT COSTS
$ 31,000,000 $ 31,600,000 $ 32,800,000 $ 32,850,000 Construction Contingency
$ 34,400,000 $ 34,925,000 $ 36,200,000 $ 36,200,000 Owner Responsibility Costs (Design)
$ 2,700,000 $ 2,500,000 $ 2,500,000 $ 2,400,000 Owner Responsibility
Costs (Construction)
$ 10,800,000 $ 10,200,000 $ 9,680,000 $ 9,680,000 Supplemental Costs
$ 207,000,000 $ 211,000,000 $ 219,000,000 $ 219,000,000 Total Construction Cost
469,500 SF 469,500 SF 478,000 SF 478,000 SF Total Construction GSF
Conceptual Budget Estimate
$ 12 Million $ 10 Million $ 43 Million $ 0 SWING SPACE
$ 1.5 Million $ 1.5 Million $ 1.5 Million $ 1.5 Million SECURE PARKING (below grade)
Option 4 (phase I & II)
INDEX: DRAWING 4-D
PROJECT: BROOKLYN DETENTION CENTER: R
ENOVATION AND EXPANSION
10
JAMES F. M
OLLOY, JR.
11
CLIENT: Dept. of DeSigN & coNStructioNLOCATION: BrooKlYN, NYPROJECT TYPE: reNoVatioN/eXpaNSioNSIZE: 2,200 BeDSCOST: $430 mil. (proJectioN) ROLE: proJect DeSigNer
located in the heart of a lively retail/residential neighborhood, the existing Brooklyn Detention center required a design that was both operation-ally sound and aesthetically pleasing in order to be reopened. the project was part of an effort to place holding facilities for pre-trial inmates closer to borough courts, and re-establish a community-based trial jail system. in a joint venture with 1100 architect, the team was tasked with creating a new jail program, one that incorporated the existing and new portions of the facility into one jail. this effort also included the design of an exciting new curtain wall that would provide a building fitting for its neighborhood.
Brooklyn Detention CenterAugust 13, 2010
1100 Architect ricci greene AssociAtes joint venture 475 tenth Avenue new york ny 10018
DRaft
BOER
UMPL
ACE
ATLANTIC AVENUE
SMIT
HST
REET
STATE STREET
1
2
INTAKE AREA
LOADING DOCKDUMPSTER AREA
VISITATION SEATING CAPACITY
PROCESSED WAITING: 32
VISIT FLOOR TOTAL: 207 SEATS (210 SEATS + 7 ADA SEATS)
4 PERSON TABLES: 49 ADA TABLES: 7
288 SFOUT SP
225 SFELEV STAGING
90 SFOFFICE
181 SFMAIL
125 SFELEC
202 SFATTNY 113 SF
SP
8779 SFRETAIL
5555 SFRETAIL
436 SFINCOMING SP
1
2
3
BUS PARKING
217 SFPACKAGE 338 SF
RETURN
112 SFELEC
90 SFSEG RM
QUEUING AREA
90 SFSEG RM
90 SFSEG RM
90 SFSEG RM
NC
NC255 SF
SP
282 SFPROCESSING
273 SFISSUE
255 SF
CNTRLRM
116 SFSP
64 SFSRCH ST
157 SFOFFICE
JC
645 SF
PROCESSEDWAITING
4858 SFVISIT FLOOR
148 SFGN DRP
177 SFBAIL
652 SFLOBBY
4
138 SFSTATION
CORRIDOR
265 SF
FIRERESPONSE
TEAM
613 SFCONTROL ROOM
196 SFSP
338 SF
M0VEMENTOFFICE
152 SFHOLDING
178 SFHOLDING
180 SFHOLDING
185 SFHOLDING
144 SF
SRCHSHWR
95 SFARSNL
90 SFCERT
82 SF
TRGAS
CORRIDOR
150 SF
SEC EQROOM
105 SFOFFICE
545 SFMUSTER
458 SFSTAFF LOUNGE
112 SFOFFICE
112 SF
COATROOM
CORRIDOR
JC
105 SFSTA
77 SFHLD
106 SFHLD
96 SF
ETRYVSTBLE
16653 SFSALLYPORT
114 SFELEC
148 SFIDF
137 SFPT
58 SFHLDPT
TRANSPORT /TRANSFER
HOLDING CAPACITY 62 INMATES
132 SFPT
ST
125 SFFR CMND
PT
ST
58 SFSP
ST
ST
STCORRIDOR
56 SFCELL
54 SFCELL
634 SFLOBBY
193 SFSTATION
556 SFPRE-PROCESSED
PE1 PE2
SVE1 SVE2
FTE1
PE3 PE4
JC5
69 SFSTR
52 SFPT
RATEDCORRIDOR
RATEDCORRIDOR
EL. +4'-8"
EL. +1'-10"
EL. +0'-0"
EL. -1'-3"
EL. -4'-1"
EL. -2'-7"
EL. -1'-4"
EL. +0'-0"
3
EL. +4'-0"
EL. -1'-3"
VEHICLEENTRY
OFFICIAL ENTRY
PUBLICENTRY
EL. +3'-2"
OPEN TOBELOW
1100 ARCHITECT RICCI GREENE ASSOCIATES JOINT VENTURE475 TENTH AVENUE NEW YORK NY 10018
6432168
Scale: 1/32" = 1'-0"OPTION C : First Floor Plan
July 29, 2010BROOKLYN DETENTION CENTER
First FLoor
Brooklyn Detention CenterAugust 13, 2010
1100 Architect ricci greene AssociAtes joint venture 475 tenth Avenue new york ny 10018
DRaft
1
2
1346 SFDORMITORY
149 SFPANTRY
144 SFSP
346 SF
MULTIPURPOSEROOM
501 SF
OUTDOORRECREATION
1637 SFDAYROOM44 BEDS
250 SF
SHOWERSTOILETS
JC
ST 121 SFIDF
121 SF
SEC.EQUIP.
55 SFSTOR
1305 SF
INDOORRECREATION
659 SFWEIGHT RM.
1463 SF
RELIGIOUSSERVICE SPACE
120 SFELEC
131 SFCLERK
131 SFCLERK
130 SFCLERK
58 SFIT
56 SFIT
56 SFST
53 SFJC
63 SFIT
56 SFIT
56 SFST
53 SFJC
238 SFSTOR
489 SFSP
500 SF
OUTDOORRECREATION
503 SF
OUTDOORRECREATION
1030 SFDAYROOM
1030 SFDAYROOM
179 SFSP
124 SFPANTRY
JC
ST 117 SFPANTRY
CORRIDOR
677 SFMECHANICAL 675 SF
MECHANICAL
PE1 PE2
SVE1 SVE2
PE3 PE4
1020 SFCORR.
104 SFCLIN.
104 SFCLIN.
104 SFCLIN.
100 SFDISC.
100 SFDISC.
125 SFDISC.
141 SFOFFR.
155 SFPSY.
136 SFPSY.
142 SFPSY.
135 SF
UNT.CHF.
149 SFADM. STF.
174 SFGRP. INTRV.
115 SFWAIT.
42 SFTLT
287 SF
ADMIN.STAFF
221 SFLOCKER
1961 SFCORR.
100 SFTRI.
100 SFEXM.
436 SFPHARM.
100 SFEXM.
100 SFEXM.
184 SFWAIT.
40 SFHC
35 SFST
123 SFLAB
240 SFTREAT.
100 SFEXM.
100 SFHIV
100 SFMETD.
28 SFJC
160 SF
MED.REC.
90 SFOFFR.
129 SFP.A.
320 SFDENT.
222 SFLOCKER
200 SFNR. DIR.
116 SF
SITEDIR.
145 SF
HEALTHADMIN.
78 SF
MED.STR.
117 SFLOUNGE
122 SF
CLINIC.CAP'T
49 SFSEC.
80 SFLINEN
60 SFNT. 177 SF
NURSE43 SF
IN.
83 SF
GEN.STOR.
80 SFSUP.
99 SFDIS.
73 SFDENT.
47 SFEQP.
28 SFJC
60 SFHC
60 SFHC
3
EL. +83'-10"
ROOF
EL. +83'-10"ROOF
OPEN TO BELOW
OPEN TOBELOW
OPEN TO BELOW OPEN TO BELOW
EL. +87'-10"
1100 ARCHITECT RICCI GREENE ASSOCIATES JOINT VENTURE475 TENTH AVENUE NEW YORK NY 10018
6432168
Scale: 1/32" = 1'-0"OPTION C : Seventh Floor Plan
July 29, 2010BROOKLYN DETENTION CENTER
seventh FLoor
BROOKLYN DETENTION CENTERJuly 29, 2010
1100 ARCHITECT RICCI GREENE ASSOCIATES JOINT VENTURE 475 TENTH AVENUE NEW YORK NY 10018
DRAFTZONING
Zoning Lot Information
1. Zoning District: C6-2A2. Special Purpose District: DB (Downtown Brooklyn)3. Zoning Lot Size: 59,845.8 sq-ft4. Zoning Use Group: Commercial Use Group 8D, Prison
SMIT
H ST
.
ATLANT
IC AVE
(WIDE)
BOERUM PL. (WIDE)
SMITH STREET (WIDE)
STATE
STREET
(NARR
OW)
50' DEEP RETAIL PROGRAM WITH TRANSPARENT FACADE
EXISTING TOWER
50' DEEP RETAIL AREA
LEGEND
PERMITTED MAX. ZONING ENVELOPE
120' MAX. HEIGHT
EXISTING TOWER, APPX. 170' TALL
10' SETBACK AT WIDE STREET,15' SETBACK AT NARROW STREET
30'-0" NO RECESS
50'-0"RETAIL
30' FROM CORNER: NO RECESS ALLOWED
EXISTING BULKHEAD
MIN 60', M
AX 85'
NEW BUILD
ING MAX
120'
STRE
ET W
ALL
NOT TO SCALE
Maximum Zoning Envelope Diagram
Brooklyn Detention CenterAugust 13, 2010
1100 Architect ricci greene AssociAtes joint venture 475 tenth Avenue new york ny 10018
DRaft
1
2
150 SFPANTRY
315 SF
MULTIPURPSEROOM 122 SF
SP
480 SF
OUTDOORRECREATION
1794 SFDAYROOM
1654 SFDORMITORY
137 SFPANTRY
ST
253 SF
SHOWERSTOILETS
150 SFPANTRY
313 SF
MULTIPURPOSEROOM
242 SFSP
484 SF
OUTDOORRECREATION
1791 SFDAYROOM
1606 SFDORMITORY
234 SFSP
50 BEDS
317 SF
MULTIPURPOSE
ROOM
150 SFPANTRY
410 SF
MULTIPURPOSE
ROOM
50 SFST
63 SFSTR
50 BEDS
50 BEDS
80 SFINTV
80 SFINTV
CORRIDOR
150 SFMEDICAL
120 SFIDF
140 SF
HEARROOM
140 SF
HEARROOM
173 SFSP
JC55 SFSTR
ST
253 SF
SHOWERSTOILETS
JC 55 SFSTR
150 SFMEDICAL
150 SFMEDICAL
122 SFINTV
120 SF
SEC.EQUIP.
500 SF
OUTDOORRECREATION
253 SF
SHOWERSTOILETS
52 SFJC
2218 SFDAYROOM
500 SF
OUTDOORRECREATION
ST
1913 SFDAYROOM
50 BEDS
1445 SFDORMITORY 1210 SF
DORMITORY
JC
ST
JC
500 SF
OUTDOORRECREATION
315 SF
MULTIPURPOSEROOM
110 SFSP
2185 SFDORMITORY
1825 SFDAYROOM 50 BEDS
67 SFSTR
164 SFPANTRY
253 SF
SHOWERSTOILETS
118 SFELEC
119 SFELEC
125 SFGRIEV.
125 SFGRIEV.
127 SFHEARING ROOM
140 SF
HEARROOM
377 SFCONF
130 SFPRSNL.
149 SF
DPWARD
141 SF
DPWARD
141 SF
DPWARD
274 SFWARDEN
179 SF
FIREMARSH
254 SF
SECOFFICE
91 SFSPLY
STSTJC
JC
1512 SFADMIN.300 SF
MDF ROOM
251 SFICO
315 SFWAITING
50 SFVEST
1450 SFSTAFF DINING
355 SFSR STAFF
ST
ST
ST
JC
253 SF
SHOWERSTOILETS
PE1 PE2
SVE1 SVE2
PE3 PE4
EL. +19'-0"
AREAWAY
3
EL. +19'-0"
AREAWAY EL. +19'-0"
ROOF
EL. +19'-0"
ROOF
EL. +19'-0"
1100 ARCHITECT RICCI GREENE ASSOCIATES JOINT VENTURE475 TENTH AVENUE NEW YORK NY 10018
6432168
Scale: 1/32" = 1'-0"OPTION C : Third Floor Plan
July 29, 2010BROOKLYN DETENTION CENTER
thirD FLoor
AERIAL VIEW OF RENDERING
VIEW FROM ATLANTIC AVE. & SMITH STREETEXISTING FACILITY
MASSING STUDY
THIRD FLOOR
FIRST FLOOR
SEVENTH FLOOR
SITE pLAN
Brooklyn Detention CenterAugust 13, 2010
1100 Architect ricci greene AssociAtes joint venture 475 tenth Avenue new york ny 10018
DRaft
BOER
UMPL
ACE
ATLANTIC AVENUE
SMIT
HST
REET
STATE STREET
1
2
INTAKE AREA
LOADING DOCKDUMPSTER AREA
VISITATION SEATING CAPACITY
PROCESSED WAITING: 32
VISIT FLOOR TOTAL: 207 SEATS (210 SEATS + 7 ADA SEATS)
4 PERSON TABLES: 49 ADA TABLES: 7
288 SFOUT SP
225 SFELEV STAGING
90 SFOFFICE
181 SFMAIL
125 SFELEC
202 SFATTNY 113 SF
SP
8779 SFRETAIL
5555 SFRETAIL
436 SFINCOMING SP
1
2
3
BUS PARKING
217 SFPACKAGE 338 SF
RETURN
112 SFELEC
90 SFSEG RM
QUEUING AREA
90 SFSEG RM
90 SFSEG RM
90 SFSEG RM
NC
NC255 SF
SP
282 SFPROCESSING
273 SFISSUE
255 SF
CNTRLRM
116 SFSP
64 SFSRCH ST
157 SFOFFICE
JC
645 SF
PROCESSEDWAITING
4858 SFVISIT FLOOR
148 SFGN DRP
177 SFBAIL
652 SFLOBBY
4
138 SFSTATION
CORRIDOR
265 SF
FIRERESPONSE
TEAM
613 SFCONTROL ROOM
196 SFSP
338 SF
M0VEMENTOFFICE
152 SFHOLDING
178 SFHOLDING
180 SFHOLDING
185 SFHOLDING
144 SF
SRCHSHWR
95 SFARSNL
90 SFCERT
82 SF
TRGAS
CORRIDOR
150 SF
SEC EQROOM
105 SFOFFICE
545 SFMUSTER
458 SFSTAFF LOUNGE
112 SFOFFICE
112 SF
COATROOM
CORRIDOR
JC
105 SFSTA
77 SFHLD
106 SFHLD
96 SF
ETRYVSTBLE
16653 SFSALLYPORT
114 SFELEC
148 SFIDF
137 SFPT
58 SFHLDPT
TRANSPORT /TRANSFER
HOLDING CAPACITY 62 INMATES
132 SFPT
ST
125 SFFR CMND
PT
ST
58 SFSP
ST
ST
STCORRIDOR
56 SFCELL
54 SFCELL
634 SFLOBBY
193 SFSTATION
556 SFPRE-PROCESSED
PE1 PE2
SVE1 SVE2
FTE1
PE3 PE4
JC5
69 SFSTR
52 SFPT
RATEDCORRIDOR
RATEDCORRIDOR
EL. +4'-8"
EL. +1'-10"
EL. +0'-0"
EL. -1'-3"
EL. -4'-1"
EL. -2'-7"
EL. -1'-4"
EL. +0'-0"
3
EL. +4'-0"
EL. -1'-3"
VEHICLEENTRY
OFFICIAL ENTRY
PUBLICENTRY
EL. +3'-2"
OPEN TOBELOW
1100 ARCHITECT RICCI GREENE ASSOCIATES JOINT VENTURE475 TENTH AVENUE NEW YORK NY 10018
6432168
Scale: 1/32" = 1'-0"OPTION C : First Floor Plan
July 29, 2010BROOKLYN DETENTION CENTER
First FLoorINDEX: DRAWING 5-A
Brooklyn Detention CenterAugust 13, 2010
1100 Architect ricci greene AssociAtes joint venture 475 tenth Avenue new york ny 10018
DRaft
1
2
150 SFPANTRY
315 SF
MULTIPURPSEROOM 122 SF
SP
480 SF
OUTDOORRECREATION
1794 SFDAYROOM
1654 SFDORMITORY
137 SFPANTRY
ST
253 SF
SHOWERSTOILETS
150 SFPANTRY
313 SF
MULTIPURPOSEROOM
242 SFSP
484 SF
OUTDOORRECREATION
1791 SFDAYROOM
1606 SFDORMITORY
234 SFSP
50 BEDS
317 SF
MULTIPURPOSE
ROOM
150 SFPANTRY
410 SF
MULTIPURPOSE
ROOM
50 SFST
63 SFSTR
50 BEDS
50 BEDS
80 SFINTV
80 SFINTV
CORRIDOR
150 SFMEDICAL
120 SFIDF
140 SF
HEARROOM
140 SF
HEARROOM
173 SFSP
JC55 SFSTR
ST
253 SF
SHOWERSTOILETS
JC 55 SFSTR
150 SFMEDICAL
150 SFMEDICAL
122 SFINTV
120 SF
SEC.EQUIP.
500 SF
OUTDOORRECREATION
253 SF
SHOWERSTOILETS
52 SFJC
2218 SFDAYROOM
500 SF
OUTDOORRECREATION
ST
1913 SFDAYROOM
50 BEDS
1445 SFDORMITORY 1210 SF
DORMITORY
JC
ST
JC
500 SF
OUTDOORRECREATION
315 SF
MULTIPURPOSEROOM
110 SFSP
2185 SFDORMITORY
1825 SFDAYROOM 50 BEDS
67 SFSTR
164 SFPANTRY
253 SF
SHOWERSTOILETS
118 SFELEC
119 SFELEC
125 SFGRIEV.
125 SFGRIEV.
127 SFHEARING ROOM
140 SF
HEARROOM
377 SFCONF
130 SFPRSNL.
149 SF
DPWARD
141 SF
DPWARD
141 SF
DPWARD
274 SFWARDEN
179 SF
FIREMARSH
254 SF
SECOFFICE
91 SFSPLY
STSTJC
JC
1512 SFADMIN.300 SF
MDF ROOM
251 SFICO
315 SFWAITING
50 SFVEST
1450 SFSTAFF DINING
355 SFSR STAFF
ST
ST
ST
JC
253 SF
SHOWERSTOILETS
PE1 PE2
SVE1 SVE2
PE3 PE4
EL. +19'-0"
AREAWAY
3
EL. +19'-0"
AREAWAY EL. +19'-0"
ROOF
EL. +19'-0"
ROOF
EL. +19'-0"
1100 ARCHITECT RICCI GREENE ASSOCIATES JOINT VENTURE475 TENTH AVENUE NEW YORK NY 10018
6432168
Scale: 1/32" = 1'-0"OPTION C : Third Floor Plan
July 29, 2010BROOKLYN DETENTION CENTER
thirD FLoorINDEX: DRAWING 5-B
Brooklyn Detention CenterAugust 13, 2010
1100 Architect ricci greene AssociAtes joint venture 475 tenth Avenue new york ny 10018
DRaft
1
2
1346 SFDORMITORY
149 SFPANTRY
144 SFSP
346 SF
MULTIPURPOSEROOM
501 SF
OUTDOORRECREATION
1637 SFDAYROOM44 BEDS
250 SF
SHOWERSTOILETS
JC
ST 121 SFIDF
121 SF
SEC.EQUIP.
55 SFSTOR
1305 SF
INDOORRECREATION
659 SFWEIGHT RM.
1463 SF
RELIGIOUSSERVICE SPACE
120 SFELEC
131 SFCLERK
131 SFCLERK
130 SFCLERK
58 SFIT
56 SFIT
56 SFST
53 SFJC
63 SFIT
56 SFIT
56 SFST
53 SFJC
238 SFSTOR
489 SFSP
500 SF
OUTDOORRECREATION
503 SF
OUTDOORRECREATION
1030 SFDAYROOM
1030 SFDAYROOM
179 SFSP
124 SFPANTRY
JC
ST 117 SFPANTRY
CORRIDOR
677 SFMECHANICAL 675 SF
MECHANICAL
PE1 PE2
SVE1 SVE2
PE3 PE4
1020 SFCORR.
104 SFCLIN.
104 SFCLIN.
104 SFCLIN.
100 SFDISC.
100 SFDISC.
125 SFDISC.
141 SFOFFR.
155 SFPSY.
136 SFPSY.
142 SFPSY.
135 SF
UNT.CHF.
149 SFADM. STF.
174 SFGRP. INTRV.
115 SFWAIT.
42 SFTLT
287 SF
ADMIN.STAFF
221 SFLOCKER
1961 SFCORR.
100 SFTRI.
100 SFEXM.
436 SFPHARM.
100 SFEXM.
100 SFEXM.
184 SFWAIT.
40 SFHC
35 SFST
123 SFLAB
240 SFTREAT.
100 SFEXM.
100 SFHIV
100 SFMETD.
28 SFJC
160 SF
MED.REC.
90 SFOFFR.
129 SFP.A.
320 SFDENT.
222 SFLOCKER
200 SFNR. DIR.
116 SF
SITEDIR.
145 SF
HEALTHADMIN.
78 SF
MED.STR.
117 SFLOUNGE
122 SF
CLINIC.CAP'T
49 SFSEC.
80 SFLINEN
60 SFNT. 177 SF
NURSE43 SF
IN.
83 SF
GEN.STOR.
80 SFSUP.
99 SFDIS.
73 SFDENT.
47 SFEQP.
28 SFJC
60 SFHC
60 SFHC
3
EL. +83'-10"
ROOF
EL. +83'-10"ROOF
OPEN TO BELOW
OPEN TOBELOW
OPEN TO BELOW OPEN TO BELOW
EL. +87'-10"
1100 ARCHITECT RICCI GREENE ASSOCIATES JOINT VENTURE475 TENTH AVENUE NEW YORK NY 10018
6432168
Scale: 1/32" = 1'-0"OPTION C : Seventh Floor Plan
July 29, 2010BROOKLYN DETENTION CENTER
seventh FLoorINDEX: DRAWING 5-C
INDEX: DRAWING 5-D
SALLYpORT YARD AERIAL VIEW FROM STATE & SMITH STREETS
AERIAL VIEW FROM STATE STREET AERIAL VIEW FROM ATLANTIC & STATE STREET