Irda presentation

Post on 09-May-2015

3.126 views 10 download

Transcript of Irda presentation

“Iskandar Malaysia: Current Progress and Future Directions”

Content

• Introducing Iskandar Malaysia

• Roles & Responsibilities of IRDA

• Achievement Highlights

• Latest Progress Development in Iskandar Malaysia

• Investment in Iskandar Malaysia

• Summary

Formation of 5 Economic Corridors

Changi Airport

Senai Airport

Central Business District Singapore

Central Business District – Johor Bahru:

Jurong Port

Port of Tanjung Pelepas

Port of Tanjung LangsatJohor Port

Where are we?• ISKANDAR MALAYSIA is the Super

Economic Corridor that lies strategically at the heart of South East Asia on the southern tip of the Peninsula

• Centrally located in the heart of South East Asia

• Strategically located at the cross roads of the East-West trade lanes

• Within minutes to Singapore

2,217 sq km

Projected Growth 2006 to 2025

JB CITY CENTRENUSAJAYA

WESTERN GATE DEV

EASTERN GATE DEV

SENAI - SKUDAIIndicator 2006 2025

(CDP) Annual rate of change

(%)

Population (mil) 1.6 3.0 4.63%

GDP per capita (PPP) in USD

14,790 31,100 5.78%

Labour Force (mil) 0.62 1.46 7.00%

Employment (mil) 0.61 1.43 7.00%

To be A Strong and Sustainable Metropolis of International Standing

Vision of Iskandar Malaysia

E

AB

C

D

The Main Pillars

Support System

Basic Foundation

“Strong, Diversified, Dynamic and Global”

Electrical & Electronics

Petrochemical

&Oleo

chemical

Strong Supporting Institutions (Education, R&D, Government, Private & social institutions, communication &coordination system)

World-class Professionals and Technical Work Force

Logistic &

related Services

Tourism

Financial Services

Excellent Physical, Infrastructures, including IT

Stable Political, Social Environment

Strong Supporting Industries ( Metal Products, Engineering, Non-metallic, Manufacturing Related Services (MRS))

Iskandar Economy

Creative Industries

Food & Agro

Processing

Educational Services

Health

Services

Four New Service-Based Pillars’Five Main ‘Pillars’ to be reinforced

Excellent Working & Living Environment

Iskandar Malaysia’s Key Economic Thrusts

EducationTourismHealthcare Creative

Oleo- & Petro-chemicals

Services

Manufacturing

9 Focus Economic Sectors

Electrical & Electronics Food & Agro-Processing

Logistics Financial Services-Theme Parks-Family Entertainment Centre-Hotel, dining & shopping-MICE

-Private School-Higher Education Institution-Specialized skills training centre

-Specialist Medical Service-Diagnostic medical Service-T&CM, wellness

-Film, television, games, animation-Online mobile content generation-integrated media & content services

-Transportation-Aerospace-Oil Storage & trading hub-halal logistic hub-warehousing

-Islamic banking & finance, retail & wholesale banking, PSSO, BPO, financial & other professional services-offshore financial services

-Advance E&E,-Renewable Energy-Automotive & Rail-R&D-Medical devices-security & Defence

-O&G Processing, Support industries-Biotechnology-Polymer production-Aromatics & Olefins

-Palm Oil based products-Cocoa based products-Halal derivatives-Agriculture biotechnology-Healthcare biotechnology

JB CITY CENTRE

NUSAJAYA

WESTERN GATE DEV

EASTERN GATE DEV

SENAI - SKUDAI

E

AB

C

D

Identified Economic Clusters in 5 FlagshipsECONOMIC CLUSTER

• Logistics•Manufacturing (esp. high

tech and aerospace related)• Tourism (Luxury Shopping

Destination)• Cybercity

SENAI-SKUDAI

ECONOMIC CLUSTER • Education & Medical

Tourism• Entertainment &

Recreation• State Administration • Finance• Biotechnology

NUSAJAYA

ECONOMIC CLUSTER• Logistics• Free Zone Industrial Area• Regional Distribution,

International Procurement• Oil storage Terminals

TANJUNG PELEPAS

C

B

E

ECONOMIC CLUSTER• Financial, Cultural and

Urban Tourism

JB CITY CENTRE

A

ECONOMIC CLUSTER •Manufacturing (Electronics,

petrochemicals, oleochemicals etc)• Oil Storage Terminals

PASIR GUDANG / TANJUNG LANGSAT

D

JB CITY CENTRE

NUSAJAYA

WESTERN GATE DEV

EASTERN GATE DEV

SENAI - SKUDAI

E

AB

C

D

Key Players in 5 Flagships1. Senai Airport2. Senai High Tech Park3. Johor Premium Outlets4. MSC Cyberport City5. Dyson6. Seagate7. Panasonic AVC

SENAI-SKUDAI

1. Kota Iskandar2. MEDINI3. EduCity4. LEGOLAND5. Puteri Harbour6. SiLC7. BioXcell

NUSAJAYA

B

1. PTP2. Tg. Bin Maritime

Centre3. BMW4. Flextronics

TANJUNG PELEPAS

C

E1. Bahru Stainless ( Acerinox

and Nisshin Steel)2. Titan Chemicals3. Asiaflex (Technip)4. Idemitsu5. Hitachi Chemicals6. Langsat Terminal 1 & 27. Seri Alam, City of

Knowledge

PASIR GUDANG / TANJUNG LANGSAT

D

1. Johor Corporation2. Danga Bay3. Iskandar Investment

Berhad4. Dijaya Group

JB CITY CENTRE

A

Presentation Outline

• Introducing Iskandar Malaysia

• Roles & Responsibilities of IRDA

• Achievement Highlights

• Latest Progress Development in Iskandar Malaysia

• Investment in Iskandar Malaysia

• Summary

Who are we?

IRDA Act 2007 (Act 664) empowers IRDA to Plan, Promote and Facilitate the development in the region

Collaboration with relevant authorities ensuring seamless service delivery to investors (example: one-stop-centre to fast track approval and provide customer service)

Supported by the Prime Minister and Chief Minister of Johor, both Joint Chairmen of the IRDA Members of Authority and esteemed Advisory CouncilIntegrated planning to ensure world-class benchmarks are adopted in development, for example in transportation, urban design, safety and security etc.

Iskandar Regional Development Authority (IRDA) is a Statutory Body established through an Act of Parliament to deliver on the

Iskandar Malaysia vision.

Governance Structure

Roles and Responsibilities

Master Planning (inclusive of Social Planning) Economic Planning Clusters Recommend policies, laws, actions and incentives

Brand guardian of Iskandar Malaysia as an investment destination

Promote private and public investments in Iskandar Malaysia

Disseminate information to investors and public

Monitor and align sector developments Coordinate and monitor enabler developments Principal coordinating agent for approval

PLANNING

PROMOTION

FACILITATION

Presentation Outline

• Introducing Iskandar Malaysia

• Roles & Responsibilities of IRDA

• Achievement Highlights

• Latest Progress Development in Iskandar Malaysia

• Investment in Iskandar Malaysia

• Summary

Jalan Kolam Ayer Upgrading

28th April 2010

Yahya Awal Interchange

28th Oct 2010

Ulu Tiram Interchange18th March

2011

Skudai – Senai

Highway22nd April

2011

Senai-Desaru Highway

June 2011

Jalan Abu Bakar – Jalan Skudai

31st June 2011

Kulai Interchange13th Oct 2011

Public Housing

Mac 2012

Abu Bakar InterchangeApril 2012

Coastal Highway

15 April 2012

Completion of Infrastructure, Amenities and Social Programs

Eastern Dispersal Link 1 April 2012

15

Aug

Marlborough College

Committed investment & completion of Education Projects

UniKL December

September

Masterskill

Newcastle Medical

UniversitySeptember

HELP University

College

Malaysia Art School

UiTM

2010 2011 2012 2013

MRSM June

University of Reading

April

Raffles University

16

Columbia Asia 2010

2009Regency

Sept 2012

17

Healthcare & Biotechnology Related Development

Econ Medicare Centre - 200-bedded medical centre with nursing care.

Dato’ Onn International

Specialist Hospital

KPJ Hospitals < 2009

2014

2014Gleneagles Medini

Wellness Centre2015

2013Bio -Xcell

Pasir Gudang Specialist Hospital – KPJ Healthcare (120-bed)

Dec 2012

Pilot Project:Digital COE Setup

Jan-Dec

Official Launch of FIMI Guideline

Feb

ICON apps Boot Camp

Mar-Dec

IM Creative Industry Talent Dev Program

Jan-Dec

PIMS openMay

Entertainment@Iskandar Malaysia

Sep

PIMS Official Launch

Sep

Media@MediniPhase 1: 2015

Investment: PIMS - MMU+USC - Media@Medini; Link - AL - R&H - RCP - AIR – IMA - MetFilm - BroadC

2013 2014 - 2015

Creative – Pinewood Iskandar Malaysia Studios

Commence Motorsports City

Q3

Opening Traders HotelApril

2013 2014 - 2015

3RD Theme Park 2014

Commence China Mall

Q4

Opening LEGOLAND Hotel

Jan. 2014

Opening LEGOLAND Water Park

Dec 2013

Tourism – Sports & Leisure

Opening Traders HotelApril

Iskandar Malaysia Comes Alive 2012

Johor Bahru Chingay Parade

2012Feb 2012

Mar 2012IM Corridor &

Cities Transformation

Programme Open

Kanival Budaya dan Warisan JB

2012Mar 2011

1 Hari Francais @ JB

May 2011

Jun 2012Tilawah Al-Quran

Peringkat Kebangsaan

Dec 2012World International

Economic Forum

Smart City ForumNov 2012

Sept 2012Opening Galleria @ Kotaraya

May 2012Submitting KM

Hotel & Apartment

2012 2013

2012

Sept 2012Opening City Square

JB Arts FestivalSept 2012

Oct 2012JB Transformation

Open Day

The Big September!

JB10KNov 2012

Presentation Outline

• Introducing Iskandar Malaysia

• Roles & Responsibilities of IRDA

• Achievement Highlights

• Latest Progress Development Iskandar Malaysia

• Investment in Iskandar Malaysia

• Summary

Development in Progress – Flagship A Johor Bahru City Centre A

JB TRANSFORMATION JB TRANSFORMATION

Development in Progress – Flagship A Johor Bahru City Centre

TROPICANA DIJAYA

SENIBONG COVE

SP SETIA SKY 88

A

Development in Progress – Flagship A Johor Bahru City Centre A

TROPEZ RESIDENCES

SOUTHKEY THOMSON HOSPITAL

JOHOR STATE GOVT OFFICE – KOTA ISKANDAR

B

Developments in Flagship B

CIQ PUTERI HARBOURPUTERI HARBOUR

B

Developments in Flagship B – Puteri Harbour

HELLO KITTY INDOOR THEME PARK

LITTLE RED CUBE SHOPPING MALL TRADERS HOTEL & SOMERSET

LAT’s PLACE RESTAURANT

LEGOLAND HOTEL

B

LEGOLAND – 1st IN ASIA

MALL OF MEDINI MEDINI CENTRAL

Developments in Flagship B – Legoland & Medini

LEDANG HEIGHTS

EAST LEDANG

B

Developments in Flagship B – Horizon Hills

HORIZON HILLS

B

Developments in Flagship B - Educity

MARLBOROUGH COLLEGENEWCASTLE UNIVERSITY

RAFFLES UNIVERSITY NETHERLAND MARITIME INST TECHNOLOGY

B

Developments in Flagship B - EduCity

STADIUM & SPORTS COMPLEX

INTERNATIONAL STUDENT VILLAGESOUTHAMPTON UNIVERSITY

MULTI VARSITY COMPLEX

PINEWOOD ISKANDAR MALAYSIA STUDIOS

B

Developments in Flagship B - Pinewood IM Studios

New Development in Flagship BGerbang Nusajaya & Sunway Iskandar

CHINA MALL

B

GLENEAGLES PRIVATE HOSPITAL

FAST TRACK MOTORSPORT

SUNWAY ISKANDAR

Development in Progress – Flagship CPort of Tanjung Pelepas

TG BIN COAL FIRE POWER PLANT TANJUNG PELEPAS PORT

C

RAMSAR PULAU KUKUP ECO TOURISM

PULAU KUKUP ECO TOURISM

C

Development in Progress – Flagship C Eco-Tourism

Development in Progress – Flagship DCity of Knowledge

EXCELSIOR INTERNATIONAL SCHOOL

D

PEGASUS INTERNATIONAL SCHOOL

UNIVERSITI TEKNOLOGI MARA SERI ALAM

MALAYSIA ARTS SCHOOL

Development in Progress – Flagship DCity of Knowledge

UNIVERSITI KUALA LUMPUR

ASIA METROPOLITAN UNIVERSITY

MARA JUNIOR SCIENCE COLLEGE

JAPANESE SCHOOL

D

Development in Progress – Flagship D

TANJUNG LANGSAT TERMINAL

D

TANJUNG LANGSAT INDUSTRIAL COMPLEX

BAHRU STAINLESS – JV ACERINOX SPAIN & NISSHIN STEEL JAPAN

Development in Progress – Flagship E

I-PARK@ INDAHPURA THE SENAI GARDEN

E

E

JOHOR PREMIUM OUTLETS

Development in Progress – Flagship EJohor Premium Outlets

Presentation Outline

• Introducing Iskandar Malaysia

• Roles & Responsibilities of IRDA

• Achievement Highlights

• Latest Progress Development Iskandar Malaysia

• Investment in Iskandar Malaysia

• Summary

Planning & Buildingthe Foundation

Sustain &Innovate

Phase 1

Phase 3

2007 - 2009 2010 - 2015 2016 - 2025

Dev

elop

men

t

Strengthening and Generating Growth

Phase 2

Progressive & sustainable

investments and

economic development

Targeting matured

and sustainable

investments

Targeting catalyst

investments

Investment Target =

RM47 bil

Iskandar Malaysia Development Phases

Investment Target =

RM73 bil

WE ARE HERE RM106.31

RM56 bil

Investment Target =

RM383 bil

* Others : Utilities,EmergingTech,Tourism,Education,Healthcare,Creative,Financial,Logistics,Retail,Industrial.

2006 2007 2008 2009 2010 2011 2012 2013 (March)0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

110.00

120.00

5.50 11.9021.70 23.65 26.92 31.22 35.07 41.28

5.80

5.80

6.83

6.28

6.28

6.28

7.318.31

1.00

5.059.11

14.4519.98

28.79

34.47

7.10

8.17

16.52

21.83

27.30

35.1427.30

11.30

25.80

41.75

55.56

69.48

84.78

106.31

111.37

Year-on-Year (2006 – March 2013)

Manufacturing Others Properties Government Committed Investment

RM (Bil)

131.31

Cumulative Committed Investment

Proper-ties (Res-idential)

27.3

Retail 8.25

Industrial 4.87

Emerg-ing

Tech 1.03

Gov-ern-

ment 8.31

Utilities 9.53

Manu-facturing

35.33

Petro-chemical

5.95

Health-care 1.6

Creative 0.4

Tourism 2.23

Port/Logistic 4.43Education 1.55

Finance 0.6

In RM’ Bil

Note 1 : Government; Kota Iskandar project add 1Bil Note2 : Properties; reclassification of industrial and retail

Cumulative Committed Investment - by Sector March 2013

Source: IRDA, Khazanah, IIB , MIDA as at Dec 2012 & corporate announcements

2008 2009 2010 2011 2012 2013 (March)0.0

20.0

40.0

60.0

80.0

100.0

120.0

22.83 25.48 28.78 34.14 38.53 38.81

18.92

30.08

40.70

50.64

67.78 72.56

Foreign Local

RM’ Bil

58%

42% 40%

60%

36%

64%

45%

55%

54%

46%

Committed Investment – Local Vs Foreign

Source: IRDA, Khazanah, IIB corporate announcements & MIDA Dec 2012 Report

SECTOR Cumulative Realised Dec 2012 (RM Bil)

Cumulative Realised as of March 2013 (RM Bil)

Manufacturing 19.44 19.44Petrochemical 2.64 2.70Healthcare 0.21 0.24Tourism 1.01 1.02Port / Logistic 1.96 2.18Education 0.37 0.37

Property - Residential 6.90 7.07

Utilities 3.65 3.75Retail 1.39 1.78Industrial 0.53 0.53Government 5.59 5.74

TOTAL 43.69 44.82

Cumulative Realised Investment 2006 –March 2013

TOP 10 Foreign Investors in ISKANDAR MALAYSIA

Source: MIDA Dec 2012 Report

Countries RM billion

Singapore 6.32Spain 4.20Japan 3.74

Netherlands 2.85

United Arab Emirates 1.90Australia 1.80Lebanon 1.70

France 1.63China 1.58

Germany 1.53

Investment Focus – Moving forward

Services Sector focus:

• Healthcare• Education • Tourism• Creative• Logistics• Financial Services

Some targeted countries:

Singapore Korea

Japan USA

Euro countries

IndonesiaIndia

China

Presentation Outline

• Introducing Iskandar Malaysia

• Roles & Responsibilities of IRDA

• Achievement Highlights

• Latest Progress Development Iskandar Malaysia

• Investment in Iskandar Malaysia

• Summary

5.1. Performance to date

Valuation of property on which development have been approved for the year 2012

PROJECTED NEW ASSESSMENT TAX

RM 1,413,822.80

INVESTOR : Connoisseur Towers Sdn BhdPRODUCT : Service ApartmentNILAIAN : RM 43,374,000.00TAX (0.26%) : RM 112,772.40

INVESTOR : UM Land BerhadPRODUCT : Service Apartment + HotelNILAIAN : RM 124,971,000.00TAX (0.26%) : RM 324,924.60

INVESTOR : MB Vest Sdn BhdPRODUCT : Service Apartment + HotelNILAIAN : RM 237,393,000.00TAX (0.26%) : RM 617,221.80

INVESTOR : Bank Simpanan NasionalPRODUCT : OfficeNILAIAN : RM 21,749,000TAX (0.26%) : RM 56,547.40

INVESTOR : Chiam Soh Yong Realty Co.

Sdn BhdPRODUCT : Shop officeNILAIAN : RM 7,821,000TAX (0.26%) : RM 20,334.60

Value Proposition

52

3 world-class ports,1 international airport and 2 additional ports + an international airport in Singapore

Connectivity–highways, train, broadband, availability support services Availability of quality skills/manpower Upgraded physical and social infrastructure

Consistent and transparent Government policies Creation of IRDA to facilitate businesses & investments Ease of sourcing capital, goods and resources

Centrally located in the heart of East Asia Leveraging on the close proximity to Singapore with Global connectivity Sustainable economic growth within ASEAN region

Attractive investor value propositions – High upside potential for investments Overall Competitiveness – Total cost of doing business

STRATEGIC LOCATION

PHYSICAL & ECONOMIC INFRASTRUCTURE

SOLID GOVERNMENT COMMITMENT

CAPITAL RETURNS

ISKANDAR REGIONAL DEVELOPMENT AUTHORITY

IRDA HeadquartersIskandar Regional Development

Authority (IRDA)#G-01, Block 8

Danga Bay, Jalan Skudai80200 Johor Bahru

Malaysia

Tel: +607-233 3000Fax: +607-233 3001

IRDA Satellite OfficeIskandar Regional Development

Authority (IRDA)Suite 5-3, 5th Floor, Block 3B

Plaza Sentral, Jalan Stesen Sentral 550470 Kuala Lumpur,

Malaysia

Tel: +603-2260 6777Fax: +603-2260 79991°28'58"N 103°43'6"

www.iskandarmalaysia.com.my

CONTACT US AT :

THANK YOU