iPhone App Oracle's Primavera P6

Post on 09-Mar-2015

2.301 views 4 download

description

Oracle presentation handout on iPhone App, Enhancements Available in Oracle's Primavera P6 Enterprise Project Portfolio Management

Transcript of iPhone App Oracle's Primavera P6

<Insert Picture Here>

What’s New in Primavera P6 EPPM Release 8.1 May 19, 2011

Brian Saldutti

Oracle Primavera Product Strategy

2

Agenda

• Refreshed User Interface

• Resource Management

• Project Management

• Risk Management

• Portfolio Management

• Administration

• Technologies

• P6 Professional

• Mobile

• Reporting

3

Refreshed User Interface

4

Refreshed User Interface

Icons replaced with text for easier readability

Main navigation moved to tabs to easily

identify where you are

5

Refreshed User Interface

Detailed pages modernized and simplified

6

Refreshed User Interface

• Control Center Performance

• UI Scalability

Buttons always appear when page scrolls to

improve usability

7

Resource Management

8

Resource Management

Dates and duration fields availablefor viewing and updating in Resource Assignments tab

9

Resource Management

Filter options available when assigning resources including

currently opened projects

10

Resource Management

Assign resources to multiple assignments at once and

search for best fit

11

Resource Management

Run Check Resource Overallocation to identify

resource constraints that may impact the project

12

Resource Management

Automatic notification appears when service is completed

13

Resource Management

See resource overallocation in week increments

Take action to fix the overallocation

14

Project Management

15

Project Management

New fields available in EPS View –

Last Scheduled Date

Last Leveled Date

Last Apply Actuals Date

16

Project Management

Define Gantt bars based on User Defined

Fields (UDFs)

17

Project Management

Risk adjusted schedule views to

reflect Risk Analysis data

18

Risk Management

19

Risk Management

• x

Organize categories in a hierarchy for risk

breakdown structure

20

Risk Management

• x

Copy and paste risks within a single

project or across multiple projects

21

Risk Management

• x

Relative thresholds support for use across multiple projects

22

Risk Management

Additional fields to better track and analyze risks

23

Risk Management

Risk exposure and score available at the project

level for analysis

24

Portfolio Management

25

Portfolio Management

• Drill into WBS UDFs

Drill down to view and edit WBS UDF’s via the Dashboard

and Portfolios

26

Administration

27

Project Scheduled Services

Specify a rolling date when configuring project services

28

Scheduled Services Status

Standardized log files for all services including translation support

29

User Sessions

Administrators can reset sessions for users who have been locked out.

30

Technologies

31

New platforms

• Google Chrome 9 Browser

• Server platform – HP-UX Itanium

• Administration – Oracle Enterprise Manager 11g

• JRE 1.6.0_24+

• BI Publisher 11g

• UCM 11g

• Brazilian Portuguese language support

Additional Tools

• Project integrity checker

• Jackrabbit to UCM migration tool

Technologies

32

P6 Professional

33

P6 Professional –Supports: stand alone and work groups

P6 EPPM –Includes: P6 Web and Optional Client

P6 PMDB

End Users using P6

Optional Client

End Users using

P6 Web client

P6 PMDB

End Users using

P6 Professional

End Users using

P6 Professional

End Users using

P6 Professional

Import/Export

Stand alone or

Offline mode for P6 EPPM

End Users

using P6

Professional

with local

databaseLocal P6 PMDB

P6 EPPM Optional Client & P6 Professional 8.1

34

Mobile

3535

Mobile – iPhone App

Email comments and photos related to a task

View assigned tasks by project

Update time spent , time left & dates

Graphical indicator of health/status

Star favorite tasks

3636

Mobile – Email Updates

Filter list of tasks

Send email torequest tasks

View assigned tasks by project

Update time spent , time left & dates

Easily mark a task complete

Email changes to update P6 project

Receive confirmation message for updates

37

Reporting

38

Reporting Changes• P6 Schema increased to store calculated fields

• Incremental update of projects via trickle process

– Project filter, Manual or Automatic publication

• Global Publishing Services

• BI Publisher 11g support

– Web based report layout editor

– Create reports that combine P6 data with other data sources

• P6 Analytics

– Unlimited number of codes supported

Benefits

• Improved performance

• Near real-time reporting

• ODS an optional component for BI Reporting

• SQL Server support

38

Reporting

3939

P6 Reporting Database 2.x

P6 Data Warehouse

P6 Analytics 1.xP6 EPPM 8.1

P6 PMDB

Resource Utilization Star

Resource Assignment Star

Project History Star

Project Activity Star

OBIEE+/SE-1

Oracle BI Answers

P6 Metadata

Oracle BI Interactive Dashboards

P6 CatalogOracle BI Publisher

Near Real-Time Operational Reporting

Transactional Reporting

StaticOperational Reporting

Analytical Reporting

ODSETL

Periodic Extract, Transform & Load

Process

Extension Tables and Views

Reporting

40

Reporting

Project options to enable publication

and set priority

For more information please visit:

www.oracle.com/primavera