Internal meeting 31/01/2007

Post on 30-Dec-2015

22 views 0 download

description

Report on mechanical tests and possible operation scheme of the liquid recirculation for ARGONTUBE. Internal meeting 31/01/2007. Mechanical test with rings at LHEP. Contacts with HBB Biegetechnik able to make the rings Order placed (receive rings in 2 weeks) - PowerPoint PPT Presentation

Transcript of Internal meeting 31/01/2007

Report on mechanical testsand possible operation scheme

of the liquid recirculation for ARGONTUBE

Internal meeting 31/01/2007

Mechanical test with rings at LHEP

Contacts with HBB Biegetechnikable to make the rings

Order placed (receive rings in 2 weeks)

Soon after realize the prototype

LN

Vacuumpump

Artank

Artank

Oxysorb

Hydrosorb

Oxysorb

Hydrosorb

Possible operation scheme