Interim submission 4

Post on 10-Mar-2016

214 views 0 download

Tags:

description

Construction drawings & model 3

Transcript of Interim submission 4

2011 2nd year architectural technology

Interim Submission 4

Community hub project, ‘a meeting place’

Student no.: 210044594

Yusuf Sampson

Model 3, NB: 80% complete, waiting on supply of balsa wood.

NB: Submission will be touched up/completed for

08.08.2011.

• A summary of the design process with reference to all precedent study.

• Annotations, notes, anthropometrics, context and rendered drawings.

• Perspective drawings and 1:10 detail drawings of all major structural considerations.

• A formal compilation of all work for presentation.

Still to come: