Institutional Master Plan (IMP) – PresentationPressley Ridge – Marshall Avenue Campus
Loca
tion
Map
The Marshall Avenue Campus is located in the Perry South neighborhoodand occupies approximately 18 acres
Exis
ting
Prop
ertie
s
Existing Structures
School / Admin55,300 sq. ft.
Cottages (2)3,600 sq. ft. ea.
Office Building3,600 sq. ft.
Townhomes (5)1,400 sq. ft. ea.
Single Family (2)1,270 & 1,480 sq. ft.
Maintenance Bldg.800 sq. ft.
In addition to the structures on Campus, Pressley Ridge also owns(9) Properties on Marshall Ave, (4) of which include single family homes.
10-Y
earP
lan
In addition to the new structures, the 10-Year development includes:• Reconfiguration of vehicular and pedestrian circulation• New surface parking (220 spaces over 10 years)
Proposed Structures
New School60,000 – 75,000 sq. ft.
Renovate Ex. SchoolEx. 55,300 sq. ft.Addition 20,000 –30,000 sq. ft.
Renovate Ex. Cottage3,600 sq. ft.
New Cottage3,600 – 4,000 sq. ft.
New Maint. Bldg.10,000 sq. ft.
New Parking Deck26,000 sq. ft.
Tran
spor
tatio
n
Traffic Study Summary
Analyses show acceptable trafficoperations at the new accessdrive (level of service B or betterduring peak periods).
Queues will not be excessive, norwill they impact adjacent streettraffic.
Sight distance at the relocatedaccess drive has been evaluatedand exceeds minimumrequirements.
Stor
mw
ater
Man
agem
entStormwater Management
Stormwater runoff currently flowsinto two separate watershedstowards the Ohio River.
Stormwater managementfacilities are being proposed toaccount for the increased runofffrom proposed development inthe 10-Year Plan. These include:
• Permeable Paver Systems
• Rain Gardens, Landscaping,and Trees
• Underground Storage Systems
Acce
ssib
ility
Accessibility and Universal Design
Pressley Ridge serves children andfamilies with special needs. As aresult they have a strongcommitment to applying UniversalDesign principals throughout theircampus.
New and existing facilities will bedesigned and improved to meet theneeds of everyone.
The natural terrain of the campusposes challenges as well asopportunities. New structures willbe situated to improve accessibilityon the campus and improvecirculation between new andexisting buildings.
Com
mun
ityPr
oces
sCommunity Process
Pressley Ridge and specifically theMarshall Avenue Campus havebeen part of the Perry Southneighborhood since 1959.
As part of the outreach to thecommunity, Pressley Ridge wasinvited to present the MasterPlan to the Perry Hill Top CitizensCouncil in November 2015.
The Council provided insight intothe history of the MarshallAvenue site.
Campus access, security, and useof the gym was discussed.
Pressley Ridge will continue toinvolve the community as theyimprove the campus.