Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction.

Post on 16-Jan-2016

255 views 0 download

Tags:

Transcript of Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction.

Institut IGH d.d.

5. Construction

Institut IGH d.d.

5. Construction

Institut IGH d.d.

6. Structures

Bridges

More than 800 different structures

hma

x=44

.2

MOST GUDUCA

52.0

204.0

62.096.067.0

VRPOLJEPIROVAC

hma

x=55

.0

hma

x=60

.0

50.050.040.0 50.050.0 50.0 40.0

MOST KRKA

VIJADUKT DRAGE

MOST DABAR

Institut IGH d.d.

6. Structures

Institut IGH d.d.

6. Structures

Institut IGH d.d.

Tunnels

Total length of tunnels: 85 kmThe longest tunnel: 5,79 km

Institut IGH d.d.

7. Financing

• fuel tax: EUR 0,082/lit• toll collection• charges for the use of roadside land• loan proceeds

• Total cost of motorway system 2001 – 2008: EUR 9 billion• loans: EUR 5.3 billion• average price per km: 8 million

Average Anual Daily Traffic 2010:12.404vehicles

Institut IGH d.d.

Total toll collection revenue in 2010:

€267 Mil

Toll collection:

I CAT: 0,053 EUR/km

II CAT: 0,080

III CAT: 0,120

IV CAT: 0,170

7. Financing

Institut IGH d.d.

8. Impacts (sustainability)

Economy: transit, tourism, new jobs…

Social impact: integration

Institut IGH d.d.

8. Impacts (sustainability)

Roads open but also create new vistas

Each generation of builders has the responsibility to leave the works worthy to be shown in postcard pictures.

Institut IGH d.d.

9. FuturePelješac Bridge

Institut IGH d.d.

9. FutureRailways + ports

Connections to towns

New concessions?

Institut IGH d.d.

Thank you for your attention

The Developement of Motorway network in Croatia