Post on 21-Nov-2021
GEOTHERMAL ENERGY
0
BANGKITKAN ENERGI NEGERI
Insights About Geothermal Development
In Indonesia
PT Pertamina Geothermal Energy
June 2015
GEOTHERMAL ENERGY
1
Geothermal capacity target 1
The Government of Indonesia encourages the development of renewable energy, mainly from
geothermal energy.
GW
29 30
131
22 22
20251
100% =
39
7
25
215 MTOE* 400 MTOE
4
3
2015
5
1.8
4.0
7.2
1.4
GapAdditional
Planned
till 2019
Target
2025
Capacity
2014
*) MTOE = Million Tonnes of Oil Equivalent
The government plan to have a geothermal
capacity of ~7.2 GW Years 2025
▪ Additional of geothermal capacity of ~6 GW
necessary for 2025
▪ The capacity development plan is only 1/4 from
the 2025 target
Target of Indonesian energy mix 1
Indonesia Energy Mix
1 Source : Persentation from Geothermal’s Director - Ministry of Energy and Mineral Resources
Hydro
Coal Oil
Geothermal
Others
Gas
GEOTHERMAL ENERGY
2
Pertamina Geothermal Energy (PGE)
Subsidiary of PT PERTAMINA
(PERSERO)
Integrated geothermal
operations in Indonesia
Solid financial profile
Our Vision:
to become a World Class Geothermal
Energy Enterprise
Manages 14 existing geothermal
working area
More than 30 years
experience in geothermal
industry
GEOTHERMAL ENERGY
Gn. Sibual-buali
Sungai Penuh2 x 55 MW
Hululais 2 x 55 MW
Lumut Balai4 x 55 MW
Ulubelu 1&2(110MW)
SUMATERA
JOC Cibeureum Parabakti (377 MW)
JOC Pangalengan(227 MW)
JOC Darajat(271 MW)
Karaha1 x 30 MW
Kamojang 1-4(200 MW)
Iyang Argopuro*
Tabanan
Kotamobagu*
Lahendong 1-4(80 MW)
Legend :
Production (Installed Capacity 402 MW)
Exploration
KALIMANTAN
SULAWESI
MALUKU
PAPUA
Sibayak(12 MW)
Development/proyek
Ulubelu 3&42 x 55 MW
Joint Operating Contract (JOC) (Installed capacity 875 MW)
Lahendong 5&62 x 20 MW
According to Ministry of Energy and
Mineral Resources (MEMR)
No.2067K/30/MEM/2012, PGE
manages 14 Working Areas (“WKP”).
*) WKP Kotamobagu and WKP Iyang
Argopuro had been returned to
Government per 31 Des 2014.Kamojang 51 x 35 MW
Indonesia’s Geothermal Installed Capacity = 1403.5 MW
PGE Installed Capacity (Non-JOC)= 402 MW
PGE’s Working Area
10
GEOTHERMAL ENERGY
110110
110
220
110
11055
55
110
5555
130
130
220
220
110
140
55 55 110
1332
907
797
682
577
437
17
235
30 30
2022
1047
50
200
220
17
130
275
2019
30
110
220
17
130
235
2018
3055
220
17
130
235
2017
30
220
17
125
235
2016
165
17
105
235
2015
11012
80
235
2014
11012
80
200
2021
235
402
17
2020
962Karaha
Sungai Penuh
Hululais
Lumut Balai
Ulubelu
Sibayak
Lahendong
Seulawah
Kamojang
KMJ 5 (35 MW)
UBL 3 (55MW)
LHD 5 (20 MW)
LMB 1 (55 MW)
LHD sc (5 MW)
SBY sc (5 MW)
UBL 4 (55 MW)
LHD 6 (20MW)
LMB 1 (55 MW)
HLS 1 (55 MW)
LMB 2 (55 MW
LHD (5 MW)
SPN 1 (55 MW)
HLS 2 (55 MW)
KMJ-CHR (40 MW)
LMB 3&4 (110 MW)
KRH 2 (20 MW)
HLS 2 (60 MW)
SLW 2 (55 MW)
30
SWL 1
(55 MW)
BDN (30 MW)
SPN 2 (35 MW)
100 MW
17.487BOEPD
19.010BOEPD
25.100BOEPD
29.667BOEPD
34.670BOEPD
39.455BOEPD
57.942BOEPD
4350 BOEPD
41.847BOEPD
45.545BOEPD
Projection of Installed Capacity of PGE 2015-2022
11