Energy recovery at shipping locks 1
PIANC - 5th YP-Com
Biennial Technical Visit : WIND, BLUE & GREEN ENERGY
Belgium, May 6-9, 2015
INNOVATIVE CONCEPTS ON ENERGY RECOVERY AT SHIPPING LOCKS
Marc Rynders – Tractebel Engineering
M.R
ynders
Energy recovery at shipping locks 2
Overview
• Introduction :
- GDF-Suez and Tractebel Engineering
- Overview of waterways
• Energy recovery at shipping locks at Ivoz-Ramet (B)
• Energy recovery at shipping locks at Lanaye (B)
• Energy recovery at shipping locks on Canal Charleroi-Brussels (B)
M.R
ynders
Energy recovery at shipping locks 3
TRACTEBEL ENGINEERING within …
Energy Europe Global Gas & LNG
Infrastructures Energy Services Environment
Energy International
Engineering Facility Management Installation
M.R
ynders
Tractebel engineering > MARKETS
Thermal Renewable Nuclear Transmission
& Distribution Hydropower Gas & LNG Carbon Capture
& Storage
ENERGY
SMART & SUSTAINABLE INFRASTRUCTURE
Buildings Rail & Road
Ports & Waterways
Consultancy Environment
Energy recovery at shipping locks 4
M.R
ynders
Energy recovery at shipping locks 5
Overview of waterways :
- River Meuse in Belgium - Ivoz-Ramet ; Lanaye
- Canal Charleroi-Brussels
M.R
ynders
Goods transported on main canals and rivers in central Belgium (millions of tons, estimations for 2020)
Energy recovery at shipping locks 6
Ivoz-
Ram
et
Lanaye
CC
B
Charleroi
M.R
ynders
River Meuse between Namur (B) and Maastricht (NL)
Energy recovery at shipping locks 7
Am
psin
-Neuvill
e
Ivoz-R
am
et
Lanaye
M.R
ynders
Canal Charleroi-Brussels near Charleroi(B)
Energy recovery at shipping locks 8
M.R
ynders
Goods shipped (millions of tons, 2009) through locks in Walloon Region
Energy recovery at shipping locks 9
M.R
ynders
Energy recovery at shipping locks 10
Energy recovery at shipping locks at Ivoz-Ramet (B)
M.R
ynders
River Meuse between Namur (B) and Liège (B)
Energy recovery at shipping locks 11
M.R
ynders
Energy recovery at shipping locks 12
General site view of Ivoz-Ramet before modification works, 2011
upstream
downstream
16 m lock
hydropower
station
weir
M.R
ynders
Energy recovery at shipping locks 13
General site view of Ivoz-Ramet before modification works, 2011
upstream
downstream
Flémalle
Ivoz-Ramet
Hydropower
station
M.R
ynders
Energy recovery at shipping locks 14
Ivoz-Ramet : main functions on site
1. Locking of inland navigation vessels
• Right bank: existing lock 16 m, new lock 25 m
2. Water control
• Weir in central part of river bed (5 weir gates)
3. Energy production
• Hydropower station at left bank (3 turbines)
• Small hydropower unit for local consumption of lock equipments
M.R
ynders
Ivoz-Ramet : Engineering contract for new lock 25 m, and for renewal of 16 m lock
• Client : “Service Public Wallon” (SPW) = administration of Walloon Region
• Designer of civil works, and of electromechanical equipment:
- Bureau d’ Etudes Greisch (Liège)
- Tractebel Engineering (Brussels, Antwerp, Gent)
Energy recovery at shipping locks 15
M.R
ynders
Ivoz-Ramet : Civil construction works
• Client :
- “Société wallonne de Financement complémentaire des Infrastructures” (SOFICO)
• Site supervision :
- “Service Public Wallon” (SPW)
- Supported by : B.E. Greisch, Tractebel Engineering
• Contractor :
- BAM – Galère, with Buyck, De Meyer, etc.
Energy recovery at shipping locks 16
M.R
ynders
Ivoz-Ramet: Electromechanical works
• Client : SOFICO
• Site supervision :
- “Service Public Wallon” (SPW) , with Tractebel Engineering, B.E. Greisch
• Contractor :
- Cofely Fabricom, with Balteau, Vandezande, Vameco, etc.
Energy recovery at shipping locks 17
M.R
ynders
Official start on site : 20 May 2011 / End of works: 2015
Actual status : Construction works finished, lock gates and valves installed, lock flooded, testing of equipment ongoing
Energy recovery at shipping locks 18
M.R
ynders
Energy recovery at shipping locks 19
Future situation
upstream
downstream
Small hydro-
power unit
M.R
ynders
Energy recovery at shipping locks 20
Future situation
upstream
right bank
Small hydro-
power unit
M.R
ynders
Energy recovery at shipping locks 21
lock 25 m
lock 16 m
River Meuse with weir
right bank
Small hydro-
power unit
rotating
bridge
control building
Future situation
M.R
ynders
Energy recovery at shipping locks 22
lock 25 m
fish trap
river Meuse with weir
trafic bridge
Archimedes screw
turbine
downstream
future situation
M.R
ynders
Energy recovery at shipping locks 23
Weir control system : operator’s screen
downstream
M.R
ynders
Energy recovery at shipping locks 24
Power consumption of site installations
M.R
ynders
Renewable energy production potential
• Hydraulic energy : limited to own use (else competition with large-scale-hydropower-plant)
• Solar energy : place available on control building roof
• Wind energy : no place available for wind mills (also: valley site)
Energy recovery at shipping locks 25
M.R
ynders
Energy recovery at shipping locks 26
Archimedes-screw turbine, used for hydraulic energy production
• Flow rate : 2 m³/s
• Power production : 60 kW
• Yearly production : 470 MWh (based on 90% availability of installation)
• Purpose : coverage of site energy needs
• Production and installation: Vandezande (Diksmuide - B)
M.R
ynders
Energy recovery at shipping locks 27
• Archimedes screw for energy production : design drawing
river Meuse -
downstream
trafic bridge gallery
(erection)
(operation)
river Meuse -
upstream
M.R
ynders
Energy recovery at shipping locks 28
• Archimedes screw for energy production : installation of screw on site
M.R
ynders
Energy recovery at shipping locks 29
• Archimedes screw for energy production : screw installed on site
M.R
ynders
Energy recovery at shipping locks 30
• Archimedes screw for energy production: installation of similar size (50 kW)
M.R
ynders
Energy recovery at shipping locks 31
Energy recovery at shipping locks at Lanaye (B)
M.R
ynders
Energy recovery at shipping locks 32
Energy recovery at shipping locks at Lanaye (B)
new lock
hydropower station
M.R
ynders
Energy recovery at shipping locks 33
Energy recovery at shipping locks at Lanaye (B)
M.R
ynders
Energy recovery at shipping locks 34
Energy recovery at shipping locks at Lanaye (B)
- Pumping in dry season
- Energy production in wet season
- No operation for intermediate conditions
- See colour table on next slide
M.R
ynders
Energy recovery at shipping locks 35
Energy recovery at shipping locks at Lanaye (B)
M.R
ynders
Energy recovery at shipping locks 36
Energy recovery at shipping locks at Lanaye (B)
M.R
ynders
Energy recovery at shipping locks 37
Energy recovery at shipping locks at Lanaye (B)
M.R
ynders
Energy recovery at shipping locks 38
Hydropower station at Lanaye (B)
test of turbines Xylem
M.R
ynders
Energy recovery at shipping locks 39
Hydropower station at Lanaye (B)
Pump data:
- 8 pumps (1 spare included)
- power 500 kW each
- flow rate 2,4 m³/s
Turbine data :
- 5 turbines
- power output 460 kW each
- flow rate : 3,6 m³/s
- total efficiency 85%
- tension 690 Volt
M.R
ynders
Energy recovery at shipping locks 40
Hydropower station at Lanaye (B)
test of turbines Xylem
M.R
ynders
Energy recovery at shipping locks 41
Hydropower station at Lanaye (B)
Overview of installation (3D-drawing)
M.R
ynders
Energy recovery at shipping locks 42
Hydropower station at Lanaye (B)
Overview of installation (3D-drawing)
M.R
ynders
Energy recovery at shipping locks 43
Pumping station at Lanaye (B)
test of pumps Xylem
M.R
ynders
Energy recovery at shipping locks 44
Pumping station at Lanaye (B)
test of pumps Xylem
M.R
ynders
Energy recovery at shipping locks 45
Pumping station at Lanaye (B)
Overview of installation (3D-drawing)
M.R
ynders
Energy recovery at shipping locks 46
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
M.R
ynders
Energy recovery at shipping locks 47
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
• Functions of existing installations
1. Locking of class IV ships (1.350 T ; 85 m x 11,5 m)
Note: at Strépy : 112 x 12 m
2. Water management
> Pumping installations : 4 x 9.000 m³ / h on each site
> Evacuation of surplus water in heavy rainfall periods
M.R
ynders
Energy recovery at shipping locks 48
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
Lock No. 3 : Viesville
M.R
ynders
Energy recovery at shipping locks 49
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
MARCHIENNE-GOSSELIES-VIESVILLE
Pumping stations
M.R
ynders
Energy recovery at shipping locks 50
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
Existing: axial pumps
M.R
ynders
Energy recovery at shipping locks 51
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
• Ships from Charleroi to Brussels go first “upstream” through 3 locks, afterwards
“downstream”.
• Each locking operation means water loss.
• Natural water sources (rainfall) mostly insufficient to cover for water losses >
pumping needed for recycling.
• In future:
- New locks on each site, for class Va vessels (2000 tonnes, 112,5 * 12,5 m)
- more shipping > more water losses
- Climate change > less rainfall in summer > even more pumping needed
M.R
ynders
Energy recovery at shipping locks 52
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
• Hydrological study results:
- Separate turbines : not economical
• Solution :
- Reversible installation : on each site, 1 pump will function also as a turbine
M.R
ynders
Energy recovery at shipping locks 53
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
Water balance, lock Gosselies, year 2002 (red colour = pumping)
M.R
ynders
Energy recovery at shipping locks 54
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
Water balance, lock Gosselies, year 2020 (red colour = pumping)
M.R
ynders
Energy recovery at shipping locks 55
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
In future : Archimedes - screws
+ Optimal pump capacity (higher efficiency)
+ Less sensible to dirty water and debris
+ Less maintenance needed
+ Fish-friendly
+ Reversible (pump- and turbine – functions)
- Higher investment for civil works (transformation of building)
M.R
ynders
Energy recovery at shipping locks 56
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
On each site :
- 1 turbine (reversible screw pump)
- net power output : 110 to 130 kW
- flow rate : 2,5 m³/s
M.R
ynders
Energy recovery at shipping locks 57
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
M.R
ynders
Energy recovery at shipping locks 58
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
M.R
ynders
Energy recovery at shipping locks 59
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
M.R
ynders
Energy recovery at shipping locks 60
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
M.R
ynders
Energy recovery at shipping locks 61
Energy recovery at shipping locks at Canal Charleroi-Brussels (B)
Archimedes-screw with turbine function
Identifie
r
PIANC - 5th YP-Com
Biennial Technical Visit : WIND, BLUE & GREEN ENERGY
Belgium, May 6-9, 2015
INNOVATIVE CONCEPTS ON ENERGY RECOVERY AT SHIPPING LOCKS
QUESTIONS ?
Identifie
r
PIANC - 5th YP-Com
Biennial Technical Visit : WIND, BLUE & GREEN ENERGY
Belgium, May 6-9, 2015
INNOVATIVE CONCEPTS ON ENERGY RECOVERY AT SHIPPING LOCKS
THANK YOU FOR YOUR ATTENTION